X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-059-24305

Well Details

Well ID: 34-059-24305
Loading map...
Country: United States
State: Ohio
County: Guernsey
Municipality: Wills Township
Operator Name: UTICA RESOURCE OPERATING LLC
Well Pad ID: US-OH-000596
Farm/Lease Name: COMMISSIONERS
License Status: Producing
License Date: 2013-08-06
Spud Date: 2013-09-01
Spud Drilling Contractor: OTHER
Final Drill Date: 2013-09-23
Well Total Depth: 11746.00 ft
Configuration: Horizontal
Latitude: 39.990000
Longitude: -81.430000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2013-08-06 Proposed Formations:POINT PLEASANT, Issued Date:8/6/2013, Expired Date:8/6/2015 12:00:00 PM, Drilling unit acres:286.16, Proposed Well Type:OG, Proposed Well Class:EDPW
Reached Total Depth 2013-09-23 Helmerich & Payne International Drilling FORM 8A N/A, COMPLIANCE NOTICE ISSUED TO UTICA RESOURCE OPERATING (Cert#9489009000276059844967), WELLS DRILLED UNDER PDC ENERGY, INFORMATION WAS NOT TRANSFERRED TO NEW OPERATOR/NEW OPERATOR UNABLE TO OBTAIN SURFACE HOLE ADDITIVES-1/22/19 ALE.
Completion Report Received 2014-02-11 Helmerich & Payne International Drilling FORM 8A N/A, COMPLIANCE NOTICE ISSUED TO UTICA RESOURCE OPERATING (Cert#9489009000276059844967), WELLS DRILLED UNDER PDC ENERGY, INFORMATION WAS NOT TRANSFERRED TO NEW OPERATOR/NEW OPERATOR UNABLE TO OBTAIN SURFACE HOLE ADDITIVES-1/22/19 ALE.
Construction Permit Expires 2015-08-06 Helmerich & Payne International Drilling FORM 8A N/A, COMPLIANCE NOTICE ISSUED TO UTICA RESOURCE OPERATING (Cert#9489009000276059844967), WELLS DRILLED UNDER PDC ENERGY, INFORMATION WAS NOT TRANSFERRED TO NEW OPERATOR/NEW OPERATOR UNABLE TO OBTAIN SURFACE HOLE ADDITIVES-1/22/19 ALE.
Correction to Well 2016-09-30 CHANGE IN TARGET/TAKE PER AS-DRILLE DPLAT, SUBMITTED 08/29/2016
Correction to Well 2016-10-21 CHANGE IN TAKEPOINT PER AS DRILLED PLAT RCVD 10-19-16-ALE
Change of Owner 2018-05-04 Operator changed from 8595, PDC ENERGY INC to 10114, UTICA RESOURCE OPERATING LLC
Record Last Modified 2019-01-22 Helmerich & Payne International Drilling FORM 8A N/A, COMPLIANCE NOTICE ISSUED TO UTICA RESOURCE OPERATING (Cert#9489009000276059844967), WELLS DRILLED UNDER PDC ENERGY, INFORMATION WAS NOT TRANSFERRED TO NEW OPERATOR/NEW OPERATOR UNABLE TO OBTAIN SURFACE HOLE ADDITIVES-1/22/19 ALE.

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2014-03-03 7485 11655 0
7485 11655 0
7485 11655 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 11/06/2013 11/14/2013 0 4,218,380.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 H015%, Slickwater, WF120, YF120Flex Schlumberger Corrosion Inhibitor, Surfactant , Bactericide (Myacide GA25), Scale Inhibitor, AntiFoam Agent, Acid, Breaker, Gelling Agent, Friction Reducer, Crossli Sodium sulfate 7757-82-6 0.03062 0.00453 0
Potassium hydroxide 1310-58-3 0.02736 0.00405 0
Castor oil, ethoxylated 61791-12-6 0.04396 0.0065 0
Dodecamethylcyclohexasiloxane 540-97-6 0 0 0
Sodium erythorbate 6381-77-7 0.00321 0.00047 0
2,2`-(Ethylenedioxy)diethanol (triethylene glycol) 112-27-6 0.10059 0.01488 0
Ethanol, 2,2',2-nitrilotris-,

1,1',1-tris(dihydrogen phosphate), sodium salt

68171-29-9 0.00762 0.00113 0
Magnesium silicate hydrate (talc) 14807-96-6 0.00006000 0.00001000 0
Thiourea, polymer with formaldehyde and 1-phenylethanone 68527-49-1 0.0015 0.00022 0
Potassium chloride 7447-40-7 0.00083 0.00012 0
Ethane-1,2-diol 107-21-1 0.00095 0.00014 0
Methanol 67-56-1 0.00248 0.00037 0
Calcium chloride 10043-52-4 0.01404 0.00208 0
Ammonium sulfate 7783-20-2 0.07085 0.01048 0
Crystalline silica 14808-60-7 97.4708 14.416 0
Alkenes, C>10 a- 64743-02-8 0.00031 0.00005000 0
Decamethyl cyclopentasiloxane 541-02-6 0 0 0
Sodium chloride 7647-14-5 0.00025 0.00004000 0
Polymer of 2-acrylamido-2-methylpropanesulfonic

acid sodium salt and methyl acrylate

136793-29-8 0.00803 0.00119 0
Non-crystalline silica 7631-86-9 0.00211 0.00031 0
Prop-2-yn-1-ol 107-19-7 0.00046 0.00007000 0
Water (Including Mix Water Supplied by Client)* NA 0 85.2099 0
Guar gum 9000-30-0 0.51112 0.07559 0
Sodium hydroxide 1310-73-2 0.00001000 0 0
Potassium borate 1332-77-0 0.07403 0.01095 0
Glycerol 56-81-5 0.02414 0.00357 0
Trisodium ortho phosphate 7601-54-9 0.00335 0.0005 0
Diammonium peroxidisulphate 7727-54-0 0.02573 0.00381 0
Hydrogen chloride 7647-01-0 0.67425 0.09972 0
Fatty acids, tall-oil 61790-12-3 0.00182 0.00027 0
Siloxanes and Silicones, di-Me,

reaction products with silica

67762-90-7 0.00001000 0 0
Dimethyl siloxanes and silicones 63148-62-9 0.00007000 0.00001000 0
Vinylidene chloride/methylacrylate copolymer 25038-72-6 0.00183 0.00027 0
Tetrasodium ethylenediaminetetraacetate 64-02-8 0.00016 0.00002000 0
Glutaraldehyde 111-30-8 0.0457 0.00676 0
Propan-2-ol 67-63-0 0.16597 0.02455 0
Orange, sweet, extact 8028-48-6 0.22129 0.03273 0
Acrylamide, 2-acrylamido-2-methylpropanesulfonic

acid, sodium salt polymer

38193-60-1 0.07496 0.01109 0
Phenolic resin 9003-35-4 0.14407 0.02131 0
Octamethylcyclotetrasiloxane 556-67-2 0.00001000 0 0
Propane-1,2-diol 57-55-6 0.11346 0.01678 0
Polypropylene glycol 25322-69-4 0.0041 0.00061 0
Urea 57-13-6 0.00494 0.00073 0
Alcohols, C14-15, ethoxylated (7EO) 68951-67-7 0.0007 0.0001 0
poly(tetrafluoroethylene) 9002-84-0 0.00002000 0 0
Alcohols, C12-15 linear, ethoxylated 68131-39-5 0.1538 0.02275 0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2013-11-07 H2O 15 4697 Bbl 289510 Schlumberger STAGE 5

60 SHOTS

2013-11-12 H2O 15 4675 Bbl 284840 Schlumberger STAGE 16

60 SHOTS

2013-11-08 H2O 15 4594 Bbl 288920 Schlumberger STAGE 7

60 SHOTS

2013-11-14 H2O 15 1532 Bbl 961 Schlumberger STAGE 21

60 SHOTS

2013-11-12 H2O 15 4704 Bbl 288070 Schlumberger STAGE 17

60 SHOTS

2013-11-06 H2O 15 4899 Bbl 283220 Schlumberger STAGE 2

60 SHOTS

2013-11-05 H2O 15 5232 Bbl 281340 Schlumberger STAGE 1

60 SHOTS

2013-11-07 H2O 15 4988 Bbl 286280 Schlumberger STAGE 4

60 SHOTS

2013-11-14 H2O 15 7311 Bbl 283760 Schlumberger STAGE 22

60 SHOTS

2013-11-13 H2O 15 4713 Bbl 290150 Schlumberger STAGE 19

60 SHOTS

2013-11-11 H2O 15 4517 Bbl 287060 Schlumberger STAGE 15

60 SHOTS

2013-11-09 H2O 15 4429 Bbl 285080 Schlumberger STAGE 10

60 SHOTS

2013-11-08 H2O 15 4587 Bbl 288460 Schlumberger STAGE 8

60 SHOTS

2013-11-10 H2O 15 6818 Bbl 287200 Schlumberger STAGE 12

60 SHOTS

2013-11-14 H2O 15 4558 Bbl 278420 Schlumberger STAGE 20

60 SHOTS

2013-11-06 H2O 15 5603 Bbl 288320 Schlumberger STAGE 3

60 SHOTS

2013-11-13 H2O 15 4566 Bbl 284800 Schlumberger STAGE 18

60 SHOTS

2013-11-09 H2O 15 4578 Bbl 289340 Schlumberger STAGE 9

60 SHOTS

2013-11-10 H2O 15 4605 Bbl 282056 Schlumberger STAGE 11

60 SHOTS

2013-11-11 H2O 15 4706 Bbl 287620 Schlumberger STAGE 13

60 SHOTS

2013-11-08 H2O 15 4471 Bbl 267168 Schlumberger STAGE 6

60 SHOTS

2013-11-11 H2O 15 3651 Bbl 258260 Schlumberger STAGE 14

60 SHOTS

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2013 PDC ENERGY INC 11437 3928 14
2014 PDC ENERGY INC 166602 43955 365
2015 PDC ENERGY INC 84390 16581 365
2016 PDC ENERGY INC 67262 10707 363
2017 PDC ENERGY INC 61735 8392 365
2018 UTICA RESOURCE OPERATING LLC 64969 6031 363
2019 UTICA RESOURCE OPERATING LLC 10871 1533 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2013 PDC ENERGY INC Brine 1901 14
2014 PDC ENERGY INC Brine 7622 365
2015 PDC ENERGY INC Brine 2134 365
2016 PDC ENERGY INC Brine 2024 363
2017 PDC ENERGY INC Brine 1704 365
2018 UTICA RESOURCE OPERATING LLC Brine 934 272
2019 UTICA RESOURCE OPERATING LLC Brine 348 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-101071014 2015-7-16 0:00: PW No Violations 0.50
-1130646164 2020-3-19 0:00: PW No Violations 1.00
-1380163547 2014-7-15 0:00: PL No Violations 0.70
-1524454930 2018-5-22 0:00: PW No Violations 0.50
-1930298172 2018-10-24 0:00 PW No Violations 0.20
-2083793639 2017-6-29 0:00: PW No Violations 0.50
-372760482 2020-8-25 0:00: PW No Violations 1.00
-729846577 2017-2-17 0:00: PW No Violations 0.50
0101071014 2015-07-16 Production Wells No Violations On the day of my inspection I witnessed that production equipment included 8-400bbl tanks shared with the 3H and 14-25 all within containment, a line heaters, a compressor unit, a vapor recovery system and a gas combustor. The well was equipped with Cameron casing and tubing wellheads and plunger lift systems with valves in the open position. Production records were current and well identification was present
0729846577 2017-02-17 Production Wells No Violations On the day of my inspection I witnessed that production equipment included 8-400 barrel tanks shared with the 3H and 14-25 all within containment, a compressor unit, a vapor recovery tower and a gas combustor. The well was equipped with a plunger lift system with valves in the open position. Gauges present read 330 pounds per square inch on the tubing and 435 pounds per square inch on the casing. Annular pressure monitoring was present along with proper identification and production records being current.
0751779604 2019-02-19 Production Wells No Violations The purpose of my inspection was a status check. During my inspection the well was equipped with a plunger lift system with production valves in the open position. Annular pressure monitoring was present with gauges reading zero pounds per square inch. The production equipment consisted of eight 400-barrel tanks, three vapor recovery towers, three gas production units, a vapor recovery system skid, one vent scrubber, and one combustor. Identification was location at entry and the at the wellhead.
1190480409 2013-12-13 Production Wells No Violations On the day of my inspection, I found the well to be in production, there was (5) five hundred barrel frac tanks setting on location, I witnessed (8) four hundred barrel production tank setting inside a steel sealed containment, I place a phone call to PDC Energy to inform them of the proper I.D. needs to be posted at the entry of the lease road and at the well, the temporary fresh water storage impoundment was on location the day of my inspection.
1378295239 2013-09-04 Drill / Deepen / Reopen No Violations On the day of my inspection, I witnessed Universal Well services break circulation with fresh water, then displace one thousand one hundred ninety three sacks of Type 1 cement with 2% calcium with a weight of 15.6 and a yield of 1.20 down the twenty inch surface casing, I witnessed thirty barrel of cement returns back to surface, the drill rig is a closed loop system.
1378751985 2013-09-09 Drill / Deepen / Reopen No Violations On the day of my site inspection, the rig was currently drilling there were no spills to report at this time.
1380163547 2014-07-15 Preliminary Restoration No Violations On the day of my inspection I witnessed that production equipment included 8-400bbl storage tanks, 3-line heaters, a compressor unit and 3-separators. The well was equipped with Cameron casing and tubing wellheads and along with a Christmas tree valve assembly. Production records are current, well identification was present and the site passed preliminary restoration according ORC 1509.072A.
1524454930 2018-05-22 Production Wells No Violations The purpose of my inspection was a status check. During my inspection the well was equipped with a plunger lift system with production valves in the open position. Gauges were present reading 409 pounds per square inch on the tubing, 490 pounds per square inch on the production casing, 0 pounds per square inch on the 13.375 inch diameter intermediate, and 0 pounds per square inch on the 9.625 inch diameter second intermediate casing. The production equipment consisted of eight 400 barrel tanks, three vapor recovery towers, three gas production units, a vapor recovery system skid, one vent scrubber, and one combustor.
1930298172 2018-10-24 Production Wells No Violations The purpose of my inspection was a status check. During my inspection the well was equipped with a plunger lift system with production valves in the open position. Annular pressure monitoring was present. The production equipment consisted of eight 400 barrel tanks, three vapor recovery towers, three gas production units, a vapor recovery system skid, one vent scrubber, and one combustor.
2083793639 2017-06-29 Production Wells No Violations On the day of my inspection I witnessed that production equipment included 8-400 barrel tanks shared with the 3H and 14-25 all within containment, a compressor unit, a vapor recovery tower and a gas combustor. The well was equipped with a plunger lift system with valves in the open position. Gauges present read 365 pounds per square inch on the tubing and 400 pounds per square inch on the casing. Annular pressure monitoring was present along with proper identification and production records being current. Repair of slip on the west side of the well pad is complete with seed and mulch being applied.
751779604 2019-2-19 0:00: PW No Violations 0.20

For data sources see[10]

References