X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-133-23830

Well Details

Well ID: 34-133-23830
Loading map...
Country: United States
State: Ohio
County: Portage
Municipality: Freedom Township
Operator Name: EVERFLOW EASTERN PARTNERS LP
Well Pad ID:
Farm/Lease Name: WINCHELL UNIT
License Status: Producing
License Date: 1991-01-28
Spud Date: 1991-05-08
Spud Drilling Contractor: [[JL COATS [COATS-GOFF]]]
Final Drill Date: 1991-05-13
Well Total Depth: 4421.00 ft
Configuration: Vertical
Latitude: 41.270000
Longitude: -81.120000

For data sources see[1]

Well History

Well Status Well Status Date Comment
CO 1991-01-28 84 EVERFLOW EASTERN PTNS L P GeoDate 1/28/91
Oil and Gas 1991-01-28 Issued Date 1/28/91 Expired Date 1/28/92 Acres 0045000 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 04421 Proposed Drill Depth 04421
Original Spud 1991-05-08
Completed 1991-05-13
Reached Total Depth 1991-05-13
Completion Report Received 1991-06-03
Construction Permit Expires 1992-01-28
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
1997-06-29 4188 4310 0
4188 4310 0
2006-09-11 4210 4278 30
4210 4278 30
4188 4310 0

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 98000 Gal 60000 FRAC W/98M GAL H20 & 600 SX SAND

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1992 EVERFLOW EASTERN PARTNERS LP 9651.00 4919.00 365
1993 EVERFLOW EASTERN PARTNERS LP 3281.00 2494.00 365
1994 EVERFLOW EASTERN PARTNERS LP 2885.00 2151.00 365
1995 EVERFLOW EASTERN PARTNERS LP 3026.00 2156.00 365
1996 EVERFLOW EASTERN PARTNERS LP 3336.00 2195.00 365
1997 EVERFLOW EASTERN PARTNERS LP 3265.00 1812.00 365
1998 EVERFLOW EASTERN PARTNERS LP 2658.00 1537.00 365
1999 EVERFLOW EASTERN PARTNERS LP 1771.00 1514.00 365
2000 EVERFLOW EASTERN PARTNERS LP 2125.00 1252.00 365
2001 EVERFLOW EASTERN PARTNERS LP 2053.00 949.00 365
2002 EVERFLOW EASTERN PARTNERS LP 1970.00 680.00 365
2003 EVERFLOW EASTERN PARTNERS LP 1011.00 891.00 365
2004 EVERFLOW EASTERN PARTNERS LP 1331.00 762.00 365
2005 EVERFLOW EASTERN PARTNERS LP 1327.00 567.00 365
2006 EVERFLOW EASTERN PARTNERS LP 367.00 502.00 365
2007 EVERFLOW EASTERN PARTNERS LP 1084.00 583.00 365
2008 EVERFLOW EASTERN PARTNERS LP 1156.00 613.00 365
2009 EVERFLOW EASTERN PARTNERS LP 1368.00 623.00 365
2010 EVERFLOW EASTERN PARTNERS LP 1046.00 612.00 365
2011 EVERFLOW EASTERN PARTNERS LP 1327.00 653.00 365
2012 EVERFLOW EASTERN PARTNERS LP 1275.00 574.00 366
2013 EVERFLOW EASTERN PARTNERS LP 1222.00 539.00 365
2014 EVERFLOW EASTERN PARTNERS LP 1031.00 488.00 365
2015 EVERFLOW EASTERN PARTNERS LP 1007.00 502.00 365
2016 EVERFLOW EASTERN PARTNERS LP 1124.00 437.00 365
2017 EVERFLOW EASTERN PARTNERS LP 951.00 332.00 365
2018 EVERFLOW EASTERN PARTNERS LP 619.00 266.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1992 EVERFLOW EASTERN PARTNERS LP Brine 1142 365
1993 EVERFLOW EASTERN PARTNERS LP Brine 675 365
1994 EVERFLOW EASTERN PARTNERS LP Brine 602 365
1995 EVERFLOW EASTERN PARTNERS LP Brine 642 365
1996 EVERFLOW EASTERN PARTNERS LP Brine 739 365
1997 EVERFLOW EASTERN PARTNERS LP Brine 712 365
1998 EVERFLOW EASTERN PARTNERS LP Brine 495 365
1999 EVERFLOW EASTERN PARTNERS LP Brine 551 365
2000 EVERFLOW EASTERN PARTNERS LP Brine 786 365
2001 EVERFLOW EASTERN PARTNERS LP Brine 487 365
2002 EVERFLOW EASTERN PARTNERS LP Brine 597 365
2003 EVERFLOW EASTERN PARTNERS LP Brine 318 365
2004 EVERFLOW EASTERN PARTNERS LP Brine 329 365
2005 EVERFLOW EASTERN PARTNERS LP Brine 444 365
2006 EVERFLOW EASTERN PARTNERS LP Brine 325 365
2007 EVERFLOW EASTERN PARTNERS LP Brine 656 365
2008 EVERFLOW EASTERN PARTNERS LP Brine 442 365
2009 EVERFLOW EASTERN PARTNERS LP Brine 268 365
2010 EVERFLOW EASTERN PARTNERS LP Brine 303 365
2011 EVERFLOW EASTERN PARTNERS LP Brine 330 365
2012 EVERFLOW EASTERN PARTNERS LP Brine 187 366
2013 EVERFLOW EASTERN PARTNERS LP Brine 335 365
2014 EVERFLOW EASTERN PARTNERS LP Brine 271 365
2015 EVERFLOW EASTERN PARTNERS LP Brine 272 365
2016 EVERFLOW EASTERN PARTNERS LP Brine 561 365
2017 EVERFLOW EASTERN PARTNERS LP Brine 203 365
2018 EVERFLOW EASTERN PARTNERS LP Brine 212 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0043479225 2002-09-05 Production Wells No Violations NO VIOLATIONS.
1994666016 2018-12-11 Production Wells No Violations Status check inspection of this Clinton Sandstone tank battery shared by the Winchell #s 1 & 2 (PN#s 1292 & 1293). My inspection found the battery diked and containing two (2) 100 barrel tanks, two (2) horizontal separators, and one (1) 50 barrel poly tank. This well produces through a dedicated separator and into to a dedicated 100 barrel tank. The poly tank is shared by all three (3) wells and there is a domestic supply plumbed to the sales line equipped with a regulator, meter, and drip bottle. The meter chart indicates a differential production pressure between 125psi and 150psi. The required IDs are posted at the tank battery. No violations.
43479225 2002-9-5 0:00:0 PW No Violations 0.50

For data sources see[9]

References