34-019-22168

Well Details

Well ID: 34-019-22168
Loading map...
Country: United States
State: Ohio
County: Carroll
Municipality: Washington Township
Operator Name: EAP OHIO LLC
Well Pad ID: US-OH-000391
Farm/Lease Name: HARVEY 16-14-5
License Status: Producing
License Date: 2013-01-18
Spud Date: 2013-02-09
Spud Drilling Contractor: NOMAC DRILLING CORP
Final Drill Date: 2013-02-27
Well Total Depth: 13902.00 ft
Configuration: Horizontal
Latitude: 40.600000
Longitude: -81.020000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2012-06-05 Proposed Formations:POINT PLEASANT, Issued Date:6/5/2012, Expired Date:6/5/2014 12:00:00 PM, Drilling unit acres:161.2, Proposed Well Type:OG, Proposed Well Class:POOL
APP 2013-01-18 Proposed Formations:POINT PLEASANT, Issued Date:1/18/2013, Expired Date:1/18/2015 12:00:00 PM, Drilling unit acres:149.84, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2013-02-27
Correction to Well 2013-06-14 CORRECTION TO SURFACE & TARGET INFORMATION (FOOTAGE & X,Y COORDINATES) FROM AS DRILLED SURVEY PLAT. UNIT SIZE CHANGED TO 135.65 ACRES.
Completion Report Received 2013-11-04
Construction Permit Expires 2015-01-18
Record Last Modified 2017-10-23

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2013-11-04 8675 13692 648
8675 13692 648
8675 13692 648

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 04/30/2013 05/03/2013 7797 4,291,640.0 348339

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 WBK-133 OXIDIZER WEATHERFORD Breaker Ammonium Persulfate 007727-54-0 100 0.00088 0
WBK-134 WEATHERFORD Breaker Ammonium Persulfate 007727-54-0 80 0.001 0
Crystalline Silica (Quartz Sand, Silicon Dioxide) 014808-60-7 10 0.00013 0
WGA-15L WEATHERFORD Gelling Agent Petroleum Distillate Hydrotreated Light 064742-47-8 70 0.09397 0
EC6486A NALCO Scale Inhibitor Ethylene Glycol 000107-21-1 30 0.00465 0
100 Mesh Sand WEATHERFORD Proppant - Natural Crystalline Silica (Quartz Sand, Silicon Dioxide) 014808-60-7 100 1.27686 0
ACID, HYDROCHLORIC, 15 PCT WEATHERFORD Acid Hydrochloric Acid 007647-01-0 15 0.17779 0
Water 007732-18-5 85 1.00748 0
WAI-251LC, WBK-134, WCS-631LC,

WFR-61LA, WGA-15L, WIC-641L, WXL-106L

WEATHERFORD Breaker, Clay Stabilizer, Corrosion Inhibitor, Cross Linker, Friction Reducer, Gelling Agent, Iron Control Agent Guar Gum 009000-30-0 0 0.09406 0
Water 007732-18-5 0 0.12562 0
Proprietary Friction Reducer Additive (WFR-61LA) TRADE SECRET 0 0.03524 0
Proprietary Non-Hazardous Salt TRADE SECRET 0 0.09106 0
Proprietary Alcohol TRADE SECRET 0 0.00077 0
Alcohols ethoxylated C12-16 068551-12-2 0 0.09406 0
Proprietary Breaker Additive (WBK-134) TRADE SECRET 0 0.00051 0
Proprietary Ethoxylated Nonylphenol TRADE SECRET 0 0.00077 0
Sorbitan 008007-43-0 0 0.09406 0
Northern White Sand WEATHERFORD Proppant - Natural Crystalline Silica (Quartz Sand, Silicon Dioxide) 014808-60-7 100 13.0922 0
WXL-106L WEATHERFORD Cross Linker Potassium Hydroxide 001310-58-3 13 0.00428 0
Potassium Tetraborate 001332-77-0 40 0.01316 0
EC6110A, EC6486A NALCO Anti-Bacterial Agent, Scale Inhibitor Water 007732-18-5 0 0.03076 0
Proprietary Inorganic Phosphate TRADE SECRET 0 0.00181 0
Diethylene Glycol 000111-46-6 0 0.00018 0
Proprietary Organic Acid Derivatives TRADE SECRET 0 0.00543 0
WCS-631LC WEATHERFORD Clay Stabilizer No Hazardous Components NONE 0 0 0
EC6110A NALCO Anti-Bacterial Agent Quaternary Ammonium Compounds NA 10 0.00266 0
Ethanol 000064-17-5 5 0.00133 0
Glutaraldehyde (Pentanediol) 000111-30-8 60 0.01597 0
WIC-641L WEATHERFORD Iron Control Agent Citric Acid 000077-92-9 70 0.00459 0
Fresh Water CHESAPEAKE ENERGY Carrier/Base Fluid Water 007732-18-5 100 84.1067 0
WAI-251LC WEATHERFORD Corrosion Inhibitor Branched-Ethoxylated Nonyl Phenol

(Branched-Nonyl Phenol Ethoxylate)

068412-54-4 10 0.00023 0
Dimethyl Formamide 000068-12-2 40 0.00091 0
Triethyl Phosphate 000078-40-0 7 0.00016 0
Cinnamaldehyde 000104-55-2 10 0.00023 0
Tar bases, quinoline derivs, benzyl chloride-qauternized 072480-70-7 13 0.00029 0
Isopropanol (Isopropyl Alcohol, Propan-2-ol) 000067-63-0 7 0.00016 0
2-Butoxyethanol (Ethylene Glycol Monobutyl Ether) 000111-76-2 7 0.00016 0
Ethylene Glycol 000107-21-1 60 0.00136 0
WFR-61LA WEATHERFORD Friction Reducer Quaternary Ammonium Chloride (Ammonium Chloride) 012125-02-9 7 0.00285 0
Sodium Chloride 007647-14-5 10 0.00408 0
Petroleum Distillate Hydrotreated Light 064742-47-8 40 0.01631 0
Alcohols ethoxylated C12-16 068551-12-2 7 0.00285 0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2013-05-03 H2O 15 5310 Bbl 340680 Weatherford STAGE 17

36 SHOTS

2013-04-30 H2O 15 5560 Bbl 339980 Weatherford STAGE 1

36 SHOTS

2013-05-01 H2O 15 6493 Bbl 339860 Weatherford STAGE 6

36 SHOTS

2013-05-01 H2O 15 5335 Bbl 339640 Weatherford STAGE 7

36 SHOTS

2013-05-01 H2O 15 5202 Bbl 399820 Weatherford STAGE 8

36 SHOTS

0 0 0
2013-05-02 H2O 15 5033 Bbl 340880 Weatherford STAGE 15

36 SHOTS

2013-05-01 H2O 15 5525 Bbl 340360 Weatherford STAGE 4

36 SHOTS

2013-04-30 H2O 15 5434 Bbl 341020 Weatherford STAGE 2

36 SHOTS

2013-05-02 H2O 15 5212 Bbl 337111 Weatherford STAGE 13

36 SHOTS

2013-05-02 H2O 15 5493 Bbl 341180 Weatherford STAGE 10

36 SHOTS

2013-05-02 H2O 15 6888 Bbl 339440 Weatherford STAGE 9

36 SHOTS

2013-05-03 H2O 15 4719 Bbl 339640 Weatherford STAGE 14

36 SHOTS

2013-05-03 H2O 15 5191 Bbl 340720 Weatherford STAGE 16

36 SHOTS

2013-05-03 H2O 15 4951 Bbl 339780 Weatherford STAGE 18

36 SHOTS

2013-05-02 H2O 15 5419 Bbl 340200 Weatherford STAGE 12

36 SHOTS

2013-05-01 H2O 15 5557 Bbl 340360 Weatherford STAGE 5

36 SHOTS

2013-05-02 H2O 15 5487 Bbl 341620 Weatherford STAGE 11

36 SHOTS

2013-05-01 H2O 15 5652 Bbl 339921 Weatherford STAGE 3

36 SHOTS

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2013 CHESAPEAKE EXPLORATION LLC 196782 9888 149
2014 CHESAPEAKE EXPLORATION LLC 257667 8934 354
2015 CHESAPEAKE EXPLORATION LLC 187265 4258 365
2016 CHESAPEAKE EXPLORATION LLC 151274 4074 366
2017 CHESAPEAKE EXPLORATION LLC 123513 2357 361
2018 CHESAPEAKE EXPLORATION LLC 109924 2196 365
2019 CHESAPEAKE EXPLORATION LLC 25646 547 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2013 CHESAPEAKE EXPLORATION LLC Brine 17352 149
2014 CHESAPEAKE EXPLORATION LLC Brine 7150 354
2015 CHESAPEAKE EXPLORATION LLC Brine 4389 365
2016 CHESAPEAKE EXPLORATION LLC Brine 2881 366
2017 CHESAPEAKE EXPLORATION LLC Brine 1693 361
2018 CHESAPEAKE EXPLORATION LLC Brine 2142 365
2019 CHESAPEAKE EXPLORATION LLC Brine 583 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1145205667 2013-7-15 0:00: PW No Violations 2.00
-1793988944 2015-10-1 0:00: PL No Violations
-1910959499 2017-7-12 0:00: PW No Violations
-642698709 2013-4-15 0:00: DD No Violations 3.00
0244630569 2017-09-06 Production Wells No Violations The well is in production. No changes have been made to the well or tank battery since my last inspection.
0383643725 2013-02-28 Drill / Deepen / Reopen No Violations I was onsite to witness the cementing of the production casing for this well. The cement job went as planned. Following the cementing of this well the rig is going to skid to the next well on this pad location and should be spudding Sunday night. There are no violations at this location at this time.
0642698709 2013-04-15 Drill / Deepen / Reopen No Violations I was onsite to get updated GPS coordinates for the wells on the Harvey pad. There are 4 drilled wells on the pad, 1 well was previously drilled and is producing. There is production equipment onsite including a 6 400 barrel production tank battery surrounded by a steel dike. The wells appear to be static and the site is being prepared to be hydraulically fractured in the near future. A Grady Rentals crew was onsite laying down containment for the well pad. Surrounding the well pad is new erosion controls which have been recently installed. There are no site violations at this time.
1145205667 2013-07-15 Production Wells No Violations I was onsite to check the erosion controls of this wellsite following strong storms that made it through the region the previous week. There were no issues on the pad and all erosion controls are working properly. The wells on this site are currently shut-in as they are waiting for the completion of the production facilities for the four wells.
1319113528 2016-02-22 Production Wells No Violations I conducted a status check inspection of this Utica Shale well pad. My inspection found the lease road gate present and locked. The lease road and apron are in good repair. The pad is fenced and the entrance gate and all man doors on the perimeter of the pad were locked. The #1H well is in production, equipped with a plunger lift system. Well #s 3H (PN# 22301), 5H (PN# 22302), and 8H (PN# 22076-01) are also in production and producing with the aid of plunger lift systems. The proper IDs are posted at the entrance and at the wellheads and tank battery. There is a one (1) acre, freshwater impoundment located to the north of the pad. The impoundment is lined, fenced, locked and identified. The pad and impoundment area are equipped with video surveillance.

The equipment on the pad consists of the following:

6-400bbl storage tanks (3 water, 3 oil/condensate) 4 Producing wells 4 Sand separators

1 Oil stabilizer 1 Low pressure, vertical separator 2 Thermo-electric desiccators with a vertical drip bottle 1 Self-contained, 350 gallon, methanol tank containing Assure HI-18FB hydrate inhibitor 1 Combustor with inline pressure tank and air compressor

1358357053 2013-01-16 Drill / Deepen / Reopen No Violations I was on site to witness the cementing of the 20 conductor casing. My inspection revealed that Express Energy Services was still welding the last joint of casing. Express has drilled a 26 hole to a total depth of 120. They ran 120 of 20 casing and the casing was set on bottom. Express Energy Services pumped 5 barrels of freshwater ahead and mixed 245 sacks of Class A cement (3% CaCl and .5 pound per sack floseal). The cement slurry had a density of 15.6 pounds per gallon and a yield of 1.18 cubic feet per sack. They pumped 51.49 barrels of cement slurry and displaced with 39.07 barrels of freshwater. There was good circulation throughout the job and approximately 13 barrels of cement was circulated to surface. No violations noted during this inspection.
1361980520 2013-02-26 Drill / Deepen / Reopen No Violations I was onsite to check the status of Nomac 72 drilling. They were currently at 13000 feet in the lateral of their current well. They expect to drill to total depth tonight. They will circulate the well, trip out of the hole and then begin to start running casing. There are no violations at this time.
1368492943 2013-05-13 Drill / Deepen / Reopen No Violations A workover rig was on location to prepare the wells for production following the fracturing of the wells. Production equipment is set up on location and pipelines are on the location for production of the wells. A crew member said that they would be working on location several more days until all the wells are completed, following this a crew will come onsite and install the wellheads for the wells.
1594722574 2020-7-13 0:00: PW No Violations 1.00
1685465771 2013-06-06 Production Wells No Violations I was onsite to check the status of these wells. The wells have been drilled, hydraulically fractured and fully prepared for production. Currently crews are onsite preparing the flow lines for the wells to the production facilities onsite. The wells are currently shut in and the annulus and wellheads show not recordable pressures at this time. There is a gas sales line for this location so that gas will be sold when the wells are in production. There are no violations at this time for this location and these wells.
1793988944 2015-10-01 Preliminary Restoration No Violations I was on location to conduct a preliminary restoration inspection. The well is open flow with a wellhead Christmas tree assembly. Jersey barriers were installed around the wellhead. The well is properly identified with a clear, legibly marked well identification sign. The tank battery consisted of six 400 BBL production tanks and was diked. The tanks are located within a spray-lined and sealed secondary containment. There are e-stops outside the barriers, and the tanks are grounded, and have static dissipators. There is a truck grounding area for trucks collecting condensate and/or produced water. Lightning protection and a windsock is installed on top of the production tanks. Other production equipment on the well pad consisted of:



Jersey barriers are installed around the production equipment. The entire well pad is enclosed with a 6 foot high, chain link fence with 3 strand barbed wire and the man doors were locked. Along the interior of the chain link fence there is an earthen berm and it was stable. The soil stockpile is well-stabilized with vegetation. Drainage and erosion controls at the pad are in place and functioning. A closed-loop, above-ground drilling pit system was used, so there are no earthen pits requiring closure. The pad has a crushed limestone surface, and is in good repair. The lease road is stable and drivable. Preliminary restoration passed.

1910959499 2017-07-12 Production Wells No Violations I conducted a status check of this well. Identification signs were posted at the access entrance, the tank battery, and the well. The #1H well is in production and is equipped with a plunger-lift assembly. The production tanks are surrounded by a steel dike. The pad is surrounded by a fence and all man doors were locked.

The equipment on the pad consists of the following: 4 producing wells

1 Low pressure vertical separator 4 sand separators 4 gas processing units 1 vapor recovery unit 1 heat treater The access road was in good repair.

227635722 2019-9-3 0:00:0 PW No Violations 1.00
244630569 2017-9-6 0:00:0 PW No Violations 1.00
383643725 2013-2-28 0:00: DD No Violations 4.00

For data sources see[10]