If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-019-22192 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.46,"lon":-81.04,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Carroll | |
Municipality: Perry Township | |
Operator Name: EAP OHIO LLC | |
Well Pad ID: US-OH-000349 | |
Farm/Lease Name: SCOTT 24-12-5 | |
License Status: Producing | |
License Date: 2012-08-03 | |
Spud Date: 2012-09-13 | |
Spud Drilling Contractor: PATTERSON DRILLING | |
Final Drill Date: 2012-09-26 | |
Well Total Depth: 13515.00 ft | |
Configuration: Horizontal | |
Latitude: 40.460000 | |
Longitude: -81.040000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2012-07-26 | Proposed Formations:POINT PLEASANT, Issued Date:7/26/2012, Expired Date:7/26/2014 12:00:00 PM, Drilling unit acres:153.36, Proposed Well Type:OG, Proposed Well Class:EDPW |
APP | 2012-08-03 | Proposed Formations:POINT PLEASANT, Issued Date:8/3/2012, Expired Date:8/3/2014 12:00:00 PM, Drilling unit acres:144.75, Proposed Well Type:OG, Proposed Well Class:EDPW |
Reached Total Depth | 2012-09-26 | |
Correction to Well | 2013-04-12 | CORRECTION TO TARGET INFORMATION: FOOTAGE & X,Y COORDINATES FROM AS DRILLED SURVEY PLAT. UNIT SIZE CHANGED TO 127.99 ACRES. |
Completion Report Received | 2013-05-08 | |
Construction Permit Expires | 2014-08-03 | |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 01/14/2013 | 01/14/2013 | 8116.00 | 3,612,168.0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | CI-14 | Baker Hughes | Corrosion Inhibitor | Methanol | 67-56-1 | 68.00 | 0.00072000 | |
Propargyl alcohol | 107-19-7 | 5.00 | 0.00005000 | |||||
FRW-18 | Baker Hughes | Friction Reducer | Distillates, petroleum, hydrotreated light | 64742-47-8 | 30.00 | 0.01 | ||
FERROTROL 300L | Baker Hughes | Iron Control Agent | Citric acid | 77-92-9 | 50.00 | 0.00184000 | ||
GW-3LDF | Baker Hughes | Gelling Agent | Petroleum Distillate Blend | 60.00 | 0.10 | |||
Polysaccharide Blend | 60.00 | 0.10 | ||||||
BF-9L, CI-14, ENZYME G-NE, FERROTROL
300L, FRW-18, GW-3LDF, NE-900, SCALETROL 720 |
Baker Hughes | Breaker, Corrosion Inhibitor, Friction Reducer, Gelling Agent, Iron Control Agent, Non-Emulsifier, pH Adjusting Agent, Scale Inhibitor | Proprietary Silica | |||||
Proprietary Disinfectant | ||||||||
Proprietary Polymer | ||||||||
Proprietary Weak Acid | ||||||||
Proprietary Biocide | ||||||||
Proprietary Undisclosed by Supplier | ||||||||
Calcium chloride | 10043-52-4 | |||||||
Proprietary Alcohol | ||||||||
Hemicellulase Enzyme Concentrate | 9025-56-3 | |||||||
Proprietary Copolymer | ||||||||
Water | 7732-18-5 | |||||||
Proprietary Surfactant | ||||||||
Proprietary Acid | ||||||||
Proprietary Solvent | ||||||||
NE-900 | Baker Hughes | Non-Emulsifier | Methanol | 67-56-1 | 30.00 | 0.00018000 | ||
Nonyl phenol ethoxylate | 9016-45-9 | 10.00 | 0.00006000 | |||||
ENZYME G-NE | Baker Hughes | Breaker | No Hazardous Components | 0.00 | ||||
SCALETROL 720 | Baker Hughes | Scale Inhibitor | Ethylene glycol | 107-21-1 | 35.00 | 0.00491000 | ||
Diethylene glycol | 111-46-6 | 5.00 | 0.00070000 | |||||
XLW-32 | Baker Hughes | Crosslinker | Boric acid | 10043-35-3 | 20.00 | 0.00297000 | ||
Fresh Water | Carrier/Base Fluid | Water | 7732-18-5 | 100.00 | 75.99 | |||
BF-9L | Baker Hughes | pH Adjusting Agent | Potassium hydroxide | 1310-58-3 | 15.00 | 0.00371000 | ||
ALPHA 1427 | Baker Hughes | Antibacterial Agent | Water | 7732-18-5 | 60.00 | 0.00753000 | ||
Glutaraldehyde | 111-30-8 | 30.00 | 0.00377000 | |||||
Quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides |
68424-85-1 | 7.00 | 0.00088000 | |||||
Ethanol | 64-17-5 | 5.00 | 0.00063000 | |||||
Didecyl dimethyl ammonium chloride | 7173-51-5 | 10.00 | 0.00126000 | |||||
100 Mesh Sand | Baker Hughes | Proppant - Natural | Quartz | 14808-60-7 | 100.00 | 1.86 | ||
ClayCare | Baker Hughes | KCl Substitute | Choline chloride | 67-48-1 | 75.00 | 0.04 | ||
Water | 7732-18-5 | 30.00 | 0.01 | |||||
Northern White Sand | Baker Hughes | Proppant - Natural | Quartz | 14808-60-7 | 100.00 | 14.63 | ||
Additional Ingredients Not Listed on MSDS | ||||||||
Recycled Produced Water | Carrier/Base Fluid | |||||||
Water | 7732-18-5 | 100.00 | 6.45 | |||||
Hydrochloric Acid 10.1-15 | Baker Hughes | Acid | Water | 7732-18-5 | 85.00 | 0.56 | ||
Hydrochloric acid | 7647-01-0 | 15.00 | 0.09 | |||||
GBW-5 | Baker Hughes | Breaker | Peroxydisulfuric acid, diammonium salt | 7727-54-0 | 100.00 | 0.00099000 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2013-01-16 | H2O | 15 | 8364 Bbl | 676680 | BAKER-HUGHES | STAGE 8
40 SHOTS |
2013-01-15 | H2O | 15 | 9016 Bbl | 677569 | BAKER-HUGHES | STAGE 3
40 SHOTS |
2013-01-16 | H2O | 15 | 9377 Bbl | 676185 | BAKER-HUGHES | STAGE 9
40 SHOTS |
2013-01-15 | H2O | 15 | 8938 Bbl | 675189 | BAKER-HUGHES | STAGE 5
40 SHOTS |
2013-01-14 | H2O | 15 | 7802 Bbl | 672734 | BAKER-HUGHES | STAGE 2
40 SHOTS |
2013-01-16 | H2O | 15 | 8831 Bbl | 674079 | BAKER-HUGHES | STAGE 6
40 SHOTS |
2013-01-14 | H2O | 15 | 8593 Bbl | 672800 | BAKER-HUGHES | STAGE 1
40 SHOTS |
2013-01-16 | H2O | 15 | 9187 Bbl | 675399 | BAKER-HUGHES | STAGE 7
40 SHOTS |
2013-01-15 | H2O | 15 | 8516 Bbl | 677564 | BAKER-HUGHES | STAGE 4
40 SHOTS |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2013 | CHESAPEAKE EXPLORATION LLC | 589300 | 21109 | 249 |
2014 | CHESAPEAKE EXPLORATION LLC | 479406 | 10160 | 359 |
2015 | CHESAPEAKE EXPLORATION LLC | 333056 | 2951 | 364 |
2016 | CHESAPEAKE EXPLORATION LLC | 251763 | 1870 | 366 |
2017 | CHESAPEAKE EXPLORATION LLC | 206814 | 1320 | 365 |
2018 | CHESAPEAKE EXPLORATION LLC | 178873 | 1028 | 365 |
2019 | CHESAPEAKE EXPLORATION LLC | 40576 | 436 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2013 | CHESAPEAKE EXPLORATION LLC | Brine | 8233 | 249 |
2014 | CHESAPEAKE EXPLORATION LLC | Brine | 3372 | 359 |
2015 | CHESAPEAKE EXPLORATION LLC | Brine | 1834 | 364 |
2016 | CHESAPEAKE EXPLORATION LLC | Brine | 982 | 366 |
2017 | CHESAPEAKE EXPLORATION LLC | Brine | 1276 | 365 |
2018 | CHESAPEAKE EXPLORATION LLC | Brine | 871 | 365 |
2019 | CHESAPEAKE EXPLORATION LLC | Brine | 201 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0143477603 | 2017-03-01 | Preliminary Restoration | No Violations |
I was on location to conduct a preliminary restoration inspection. The #10H well is in production and the well consists of a plunger lift assembly. Jersey barriers were installed around the wellhead. The well is identified with a legibly-marked well identification sign. Identification was posted at the tank battery which consisted of eight 400 bbl production tanks, four labeled as containing produced water, and four labelled as containing condensate. The tank battery is surrounded by a steel dike. There are e-stops outside the barriers, and the tanks are grounded, and have static dissipaters. There is a truck grounding area for trucks collecting condensate and/or produced water. Lightning protection and a windsock are installed on top of the production tanks. Production equipment on the well pad consisted of: 6 producing wells 8- 400 bbl production tanks, four labelled as containing fresh water, and four labelled as containing condensate 6 sand separators 6 gas processing units 1 low pressure vertical separator 1 vapor recovery unit 1 horizontal separator 1 compressor station Jersey barriers are installed around the production equipment. The man doors were locked. Drainage and erosion controls at the pad are in place and functioning. A closed-loop, above-ground drilling pit system was used, so there are no earthen pits requiring closure. The pad has a crushed limestone surface, and is in good repair. The lease road was stable in in good repair. |
143477603 | 2017-3-1 0:00:0 | PL | No Violations | 1.00 |
For data sources see[9]