X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-019-22219

Well Details

Well ID: 34-019-22219
Loading map...
Country: United States
State: Ohio
County: Carroll
Municipality: Loudon Township
Operator Name: EAP OHIO LLC
Well Pad ID: US-OH-000336
Farm/Lease Name: KOHLER 1-13-5
License Status: Producing
License Date: 2012-08-27
Spud Date: 2012-11-17
Spud Drilling Contractor: PATTERSON DRILLING
Final Drill Date: 2012-11-27
Well Total Depth: 13521.00 ft
Configuration: Horizontal
Latitude: 40.470000
Longitude: -80.990000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2012-08-27 Proposed Formations:POINT PLEASANT, Issued Date:8/27/2012, Expired Date:8/27/2014 12:00:00 PM, Drilling unit acres:136.05, Proposed Well Type:OG, Proposed Well Class:EDPW
Correction to Well 2012-10-19 CORRECTION TO TARGET FOOTAGE.
Reached Total Depth 2012-11-27
Correction to Well 2013-03-22 CORRECTION TO TARGET INFORMATION: FOOTAGE & X,Y COORDINATES FROM AS DRILLED SURVEY PLAT. UNIT SIZE DECREASED TO 125.85.
Correction to Well 2013-05-03 CORRECTION TO TARGET INFORMATION (FOOTAGE & X,Y COORDINATES) FROM AS DRILLED SURVEY PLAT. UNIT SIZE CHANGED TO 127.13 ACRES.
Completion Report Received 2013-08-22
Construction Permit Expires 2014-08-27
Record Last Modified 2017-10-24

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2013-09-17 8777 13423 560
8777 13423 560
8777 13423 560

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 03/15/2013 03/18/2013 8272 4,266,530.0 331251

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Fresh Water CHESAPEAKE ENERGY Carrier/Base Fluid Water 007732-18-5 100 79.35 0
Acid, Hydrochloric 15pct, A264,

B244, B317, D047, J218, J475, J580, J609, J610, L058, L071, S001, 100 Mesh Sand, Northern White Sand

SCHLUMBERGER Acid, Anti-Bacterial Agent, Breaker, Corrosion Inhibitor, Cross Linker, Defoaming Agent, Friction Reducer, Gelling Agent, Iron Control Agent, KCl Substitute, Scale Inhibitor, Proppant - Natural Dodecamethylcyclohexasiloxane 540-97-6 0 0.00001000 0
Sodium chloride 7647-14-5 0 0.00004000 0
Prop-2-yn-1-ol 107-19-7 0 0.00011 0
Alcohols, C14-15, ethoxylated (7EO) 68951-67-7 0 0.00016 0
Siloxanes and Silicones, di-Me,

reaction products with silica

67762-90-7 0 0.00001000 0
Dimethyl siloxanes and silicones 63148-62-9 0 0.00001000 0
Calcium chloride 10043-52-4 0.01 0.00214 0
Alkenes, C>10 a- 64743-02-8 0 0.00007000 0
Guar gum 9000-30-0 0.54 0.07972 0
Hydrogen chloride 7647-01-0 1.26 0.18447 0
Polypropylene glycol 25322-69-4 0 0.00021 0
Sodium erythorbate 6381-77-7 0.01 0.00078 0
Ammonium sulfate 7783-20-2 0.06 0.00872 0
Tetrasodium ethylenediaminetetraacetate 64-02-8 0 0.00002000 0
Urea 57-13-6 0 0.00061 0
Ethane-1,2-diol 107-21-1 0 0.00021 0
Fatty acids, tall-oil 61790-12-3 0 0.00043 0
Decamethyl cyclopentasiloxane 541-02-6 0 0.00001000 0
Potassium borate 1332-77-0 0.13 0.01853 0
Crystalline silica 14808-60-7 97.34 14.2564 0
Octamethylcyclotetrasiloxane 556-67-2 0 0.00001000 0
Acrylamide, 2-acrylamido-2-methylpropanesulfonic

acid, sodium salt polymer

38193-60-1 0.06 0.00923 0
Thiourea, polymer with formaldehyde and 1-phenylethanone 68527-49-1 0 0.00035 0
Polymer of 2-acrylamido-2-methylpropanesulfonic

acid sodium salt and methyl acrylate

136793-29-8 0.01 0.00099 0
Water 007732-18-5 3.26 0.49381 0
Magnesium silicate hydrate (talc) 14807-96-6 0 0.00002000 0
Methanol 67-56-1 0 0.00058 0
Glycerol 56-81-5 0.04 0.00604 0
Sodium sulfate 7757-82-6 0.03 0.00377 0
Sodium hydroxide 1310-73-2 0 0.00001000 0
Potassium hydroxide 1310-58-3 0.04 0.00604 0
Glutaraldehyde 111-30-8 0.04 0.00537 0
Vinylidene chloride/methylacrylate copolymer 25038-72-6 0 0.00036 0
Cholinium chloride 67-48-1 0.46 0.06768 0
Trisodium ortho phosphate 7601-54-9 0.01 0.00074 0
Potassium chloride 7447-40-7 0 0.00013 0
Diammonium peroxidisulphate 7727-54-0 0.01 0.00206 0
Non-crystalline silica 7631-86-9 0 0.00031 0
Recycled Produced Water CHESAPEAKE ENERGY Carrier/Base Fluid Water 007732-18-5 100 5.50976 0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2013-03-17 H2O 15 4835 Bbl 352680 Schlumberger STAGE 11

35 SHOTS

2013-03-15 H2O 15 8909 Bbl 450805 Schlumberger STAGE 1

35 SHOTS

2013-03-17 H2O 15 5373 Bbl 356100 Schlumberger STAGE 9

35 SHOTS

2013-03-16 H2O 15 5393 Bbl 355220 Schlumberger STAGE 3

35 SHOTS

2013-03-17 H2O 15 6612 Bbl 356980 Schlumberger STAGE 8

35 SHOTS

2013-03-18 H2O 15 5949 Bbl 354924 Schlumberger STAGE 15

35 SHOTS

2013-03-18 H2O 15 5687 Bbl 353020 Schlumberger STAGE 12

35 SHOTS

2013-03-16 H2O 15 5430 Bbl 352580 Schlumberger STAGE 5

35 SHOTS

2013-03-17 H2O 15 5790 Bbl 354800 Schlumberger STAGE 10

35 SHOTS

2013-03-18 H2O 15 5801 Bbl 355120 Schlumberger STAGE 14

35 SHOTS

2013-03-16 H2O 15 5675 Bbl 355320 Schlumberger STAGE 4

35 SHOTS

2013-03-18 H2O 15 5852 Bbl 353460 Schlumberger STAGE 16

35 SHOTS

2013-03-17 H2O 15 5664 Bbl 352940 Schlumberger STAGE 7

35 SHOTS

2013-03-17 H2O 15 5107 Bbl 354000 Schlumberger STAGE 6

35 SHOTS

2013-03-16 H2O 15 4602 Bbl 354380 Schlumberger STAGE 2

35 SHOTS

2013-03-18 H2O 15 5260 Bbl 353100 Schlumberger STAGE 13

35 SHOTS

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2013 CHESAPEAKE EXPLORATION LLC 486003 4152 152
2014 CHESAPEAKE EXPLORATION LLC 668429 1611 355
2015 CHESAPEAKE EXPLORATION LLC 441140 274 363
2016 CHESAPEAKE EXPLORATION LLC 331929 181 366
2017 CHESAPEAKE EXPLORATION LLC 272354 78 365
2018 CHESAPEAKE EXPLORATION LLC 219122 32 365
2019 CHESAPEAKE EXPLORATION LLC 46801 28 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2013 CHESAPEAKE EXPLORATION LLC Brine 14960 152
2014 CHESAPEAKE EXPLORATION LLC Brine 4557 355
2015 CHESAPEAKE EXPLORATION LLC Brine 3208 363
2016 CHESAPEAKE EXPLORATION LLC Brine 768 366
2017 CHESAPEAKE EXPLORATION LLC Brine 1718 365
2018 CHESAPEAKE EXPLORATION LLC Brine 1887 365
2019 CHESAPEAKE EXPLORATION LLC Brine 300 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-671581026 2015-10-8 0:00: PL No Violations
0671581026 2015-10-08 Preliminary Restoration No Violations I was on location to conduct a preliminary restoration inspection. The well is open flow with a wellhead Christmas tree assembly. Jersey barriers were installed around the wellhead. The well is properly identified with a clear, legibly-marked well identification sign. The tank battery consisted of six, 400 BBL production tanks and was diked. The tanks are located within a spray-lined and sealed secondary containment. There are e-stops outside the barriers, and the tanks are grounded, and have static dissipators. There is a truck grounding area for trucks collecting condensate and/or produced water. Lightning protection and a windsock are installed on top of the production tanks. Other production equipment on the well pad consisted of:



Jersey barriers are installed around the production equipment. The entire well pad is enclosed with a six-foot high, chain link fence with three-strand barbed wire and the man doors were locked. Along the interior of the chain link fence there is an earthen berm and it was stable. The soil stockpile is well-stabilized with vegetation. Drainage and erosion controls at the pad are in place and functioning. A closed-loop, above-ground drilling pit system was used, so there are no earthen pits requiring closure. The pad has a crushed limestone surface, and is in good repair. The lease road is stable and drivable. Preliminary restoration passed.

0767681235 2016-02-18 Production Wells No Violations I conducted a status check of this well. Identification signs were posted at the access road entrance, the well, and the storage tanks. The access road gate was locked and in good repair. The #6H well is in production. The well is equipped with a plunger lift assembly. The production tanks are surrounded by a steel dike. The pad is surrounded by a fence and all man doors were locked.

The equipment on the pad consists of the following: 6 Storage tanks with one low-pressure vertical separator located outside of the dike 5 Producing wells 5 Sand separators 5 Gas Processing Units 1 Heat Treater 1 Vapor Recovery Unit

1969102104 2018-11-01 Production Wells No Violations The well was equipped with a plunger-lift assembly. The surface/intermediate and intermediate/production annular gauges displayed zero psi. I performed a walk-around inspection of the pad and erosional controls appeared functioning. No violations were observed at the time of inspection.
767681235 2016-2-18 0:00: PW No Violations 1.00

For data sources see[10]

References