If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-133-24340 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.17,"lon":-81.25,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: <County> | |
Municipality: | |
Operator Name: EVERFLOW EASTERN PARTNERS LP | |
Well Pad ID: | |
Farm/Lease Name: ROBINSON HOSPITAL | |
License Status: Producing | |
License Date: 2007-06-06 | |
Spud Date: 2007-06-21 | |
Spud Drilling Contractor: UNION DRLG | |
Final Drill Date: 2007-06-25 | |
Well Total Depth: 4475.00 ft | |
Configuration: Vertical | |
Latitude: 41.170000 | |
Longitude: -81.250000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2007-06-06 | Proposed Formations:CLINTON, Issued Date:6/6/2007, Expired Date:6/5/2008 6:00:00 AM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:POOL |
Completed | 2007-06-25 | |
Reached Total Depth | 2007-06-25 | |
Completion Report Received | 2007-08-17 | |
Construction Permit Expires | 2008-06-05 | |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2007-11-20 | 4230 | 4288 | 35 |
4230 | 4288 | 35 | |
4230 | 4288 | 35 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 7 | 102000 Gal | 70000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2007 | EVERFLOW EASTERN PARTNERS LP | 156.00 | 608.00 | 365 |
2008 | EVERFLOW EASTERN PARTNERS LP | 4914.00 | 2506.00 | 365 |
2009 | EVERFLOW EASTERN PARTNERS LP | 3943.00 | 1859.00 | 365 |
2010 | EVERFLOW EASTERN PARTNERS LP | 3341.00 | 1327.00 | 365 |
2011 | EVERFLOW EASTERN PARTNERS LP | 2906.00 | 1203.00 | 365 |
2012 | EVERFLOW EASTERN PARTNERS LP | 3237.00 | 1252.00 | 366 |
2013 | EVERFLOW EASTERN PARTNERS LP | 3520.00 | 1118.00 | 365 |
2014 | EVERFLOW EASTERN PARTNERS LP | 3352.00 | 962.00 | 365 |
2015 | EVERFLOW EASTERN PARTNERS LP | 2942.00 | 969.00 | 365 |
2016 | EVERFLOW EASTERN PARTNERS LP | 3395.00 | 970.00 | 365 |
2017 | EVERFLOW EASTERN PARTNERS LP | 3698.00 | 962.00 | 365 |
2018 | EVERFLOW EASTERN PARTNERS LP | 3520.00 | 878.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2007 | EVERFLOW EASTERN PARTNERS LP | Brine | 164 | 365 |
2008 | EVERFLOW EASTERN PARTNERS LP | Brine | 590 | 365 |
2009 | EVERFLOW EASTERN PARTNERS LP | Brine | 206 | 365 |
2010 | EVERFLOW EASTERN PARTNERS LP | Brine | 0 | 365 |
2011 | EVERFLOW EASTERN PARTNERS LP | Brine | 40 | 365 |
2012 | EVERFLOW EASTERN PARTNERS LP | Brine | 50 | 366 |
2013 | EVERFLOW EASTERN PARTNERS LP | Brine | 0 | 365 |
2014 | EVERFLOW EASTERN PARTNERS LP | Brine | 50 | 365 |
2015 | EVERFLOW EASTERN PARTNERS LP | Brine | 0 | 365 |
2016 | EVERFLOW EASTERN PARTNERS LP | Brine | 94 | 365 |
2017 | EVERFLOW EASTERN PARTNERS LP | Brine | 119 | 365 |
2018 | EVERFLOW EASTERN PARTNERS LP | Brine | 96 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1747253450 | 2008-1-4 0:00:0 | DD | No Violations | |
-443339858 | 2007-6-25 0:00: | DD | No Violations | |
0253168958 | 2007-06-21 | Drill / Deepen / Reopen | No Violations | Performed a status check on the rigging up of Union rig. Depth was 410. There were no violations at this time |
0282957408 | 2007-07-05 | Drill / Deepen / Reopen | No Violations | Capstar Drilling has moved off. The drilling pits are fenced, lined and in good condition. No violations at this time. |
0443339858 | 2007-06-25 | Drill / Deepen / Reopen | No Violations | Performed a rig inspection. The rig was logging the hole. I found no violations at this time. |
0464895346 | 2007-08-08 | Drill / Deepen / Reopen | No Violations | The drilling pits are being solidified and will be closed by tomorrow. The solidfication material was obtained from Chemtech. |
1083822671 | 2018-12-19 | Production Wells | No Violations | I inspected this well with Tom Hill (Regional Supervisor) for complaint #5989 received on 10/16/2018. We met with Mr. Thomas Hall (Complainant) and he showed us the location of the leak which occurred in the summer in his yard. There was no evidence of an oil leak at the time of the inspection. Tom Hill spoke with Mr. Hall and advised him he would close the complaint and gave Mr. Hall his business card. We walked through a wooded area and located an East of Ohio gas line marker no other markers were within ~ 1000 ft. perimeter. The marker was in line with what appeared to be an old right-of-way. We continued to walk to the tank battery and well #133-24340. The well is equipped with a plunger-lift system. The tank battery consists of a steel production tank, a plastic brine tank, a horizontal separator and a meter. The well is legibly identified. The complaint log was updated. There are no compliance issues cited at this time. |
1132949398 | 2008-06-04 | Preliminary Restoration | No Violations | Preliminary restoration is approved. |
1192702947 | 2007-06-22 | Drill / Deepen / Reopen | No Violations | Performed a rig inspection. Pit liners in good shape. Depth was 410. Location in good shape. I found no violations at this time. |
1546013938 | 2018-12-28 | UrbanProduction Wells | No Violations | Status check inspection of this Clinton Sandstone well. My inspection found the wellhead fenced and locked. The wellhead is equipped with 1.5 tubing and operating with the aid of a plunger lift system. A Murphy Switch gauge indicates a pressure of 50psi on the tubing. The annular valve between the 8.625 surface casing and 4.5 production casing is open. This well produces to a diked, fenced, and locked tank battery 700 to the northwest behind the parking lot. The battery contains one (1) 100 barrel tank, a 50 barrel poly tank, and a horizontal separator. The load lines are locked and the vent stack is plumbed through a 55 gallon, charcoal filter. There is a Dominion Roots meter on the backside of the battery and the chart at the separator indicates a differential production pressure of 40psi. The required ID and signage are posted at the wellhead and at the tank battery. No violations. |
1747253450 | 2008-01-04 | Drill / Deepen / Reopen | No Violations | The location has been graded and the wellhead and tank battery have been fenced. Preliminary restoration should be ready for approval early spring. |
253168958 | 2007-6-21 0:00: | DD | No Violations | |
282957408 | 2007-7-5 0:00:0 | DD | No Violations | |
464895346 | 2007-8-8 0:00:0 | DD | No Violations |
For data sources see[9]