X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-019-22422

Well Details

Well ID: 34-019-22422
Loading map...
Country: United States
State: Ohio
County: Carroll
Municipality: Lee Township
Operator Name: EAP OHIO LLC
Well Pad ID: US-OH-000732
Farm/Lease Name: BRYAN SHAW 21-13-5
License Status: Producing
License Date: 2013-06-17
Spud Date: 2013-08-13
Spud Drilling Contractor: NOMAC DRILLING CORP
Final Drill Date: 2013-09-29
Well Total Depth: 13649.00 ft
Configuration: Horizontal
Latitude: 40.500000
Longitude: -81.050000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2013-05-13 Proposed Formations:TRENTON BLACK RIVER, Issued Date:5/13/2013, Expired Date:5/13/2015 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
APP 2013-06-17 Proposed Formations:POINT PLEASANT, Issued Date:6/17/2013, Expired Date:6/17/2015 12:00:00 PM, Drilling unit acres:419.97, Proposed Well Type:OG, Proposed Well Class:EDPW
Reached Total Depth 2013-09-29
Correction to Well 2014-02-28 CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGE AND COORDINATES) FROM AS DRILLED SURVEY PLAT.
Correction to Well 2014-05-30 CORRECTION TO TAKE-POINT INFORMATION (COORDINATES) FROM AS DRILLED SURVEY PLAT. VARIANCE REQUEST FOR REDUCED SPACING FROM THE LAST PROPOSED PERFORATION TO THE UNIT BOUNDARY GRANTED.
Completion Report Received 2014-10-06
Construction Permit Expires 2015-06-17
Record Last Modified 2017-10-24

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2014-09-24 8360 13437 570
8360 13437 570
8360 13437 570

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 05/17/2014 05/21/2014 7883 4,195,590.0 354752

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Recycled Produced Water CHESAPEAKE ENERGY Carrier/Base Fluid Water 007732-18-5 100 3.85731 0
A264, B244, B317, J218, J475, J580,

J609, J610, L058, Acid, Hydrochloric 15pct, Northern White Sand, 100 Mesh Sand

SCHLUMBERGER Anti-Bacterial Agent, Breaker, Corrosion Inhibitor, Cross Linker, Friction Reducer, Gelling Agent, Iron Control Agent, Scale Inhibitor Sodium erythorbate 6381-77-7 0 0.00074 0
Methanol 67-56-1 0 0.00071 0
Urea 57-13-6 0 0.00034 0
Octamethylcyclotetrasiloxane 556-67-2 0 0 0
Crystalline silica 14808-60-7 97.84 15.7407 0
Dodecamethylcyclohexasiloxane 540-97-6 0 0 0
Ammonium sulfate 7783-20-2 0.04 0.00704 0
Dimethyl siloxanes and silicones 63148-62-9 0 0 0
Alkenes, C>10 a- 64743-02-8 0 0.00009000 0
Magnesium silicate hydrate (talc) 14807-96-6 0 0.00002000 0
Prop-2-yn-1-ol 107-19-7 0 0.00013 0
Glycerol 56-81-5 0.03 0.0051 0
Sodium sulfate 7757-82-6 0 0.00008000 0
Copper(II) sulfate 7758-98-7 0 0 0
Guar gum 9000-30-0 0.46 0.07355 0
Ethane-1,2-diol 107-21-1 0 0.00021 0
Alcohols, C14-15, ethoxylated (7EO) 68951-67-7 0 0.0002 0
2-propenamid 79-06-1 0 0.00002000 0
Siloxanes and Silicones, di-Me,

reaction products with silica

67762-90-7 0 0 0
Acrylamide, 2-acrylamido-2-methylpropanesulfonic

acid, sodium salt polymer

38193-60-1 0.03 0.0052 0
Hydrogen chloride 7647-01-0 1.41 0.22642 0
Tetrasodium ethylenediaminetetraacetate 64-02-8 0 0.00001000 0
Decamethyl cyclopentasiloxane 541-02-6 0 0 0
Ethanol, 2,2,2-nitrilotris-, 1,1,1-tris(dihydrogen

phosphate), sodium salt

68171-29-9 0.01 0.00166 0
Polymer of 2-acrylamido-2-methylpropanesulfonic

acid sodium salt and methyl acrylate

136793-29-8 0 0.00056 0
Thiourea, polymer with formaldehyde and 1-phenylethanone 68527-49-1 0 0.00043 0
Glutaraldehyde 111-30-8 0.03 0.00526 0
Fatty acids, tall-oil 61790-12-3 0 0.00052 0
Potassium borate 1332-77-0 0.1 0.01564 0
Non-crystalline silica 7631-86-9 0 0.00027 0
Potassium hydroxide 1310-58-3 0.04 0.00578 0
poly(tetrafluoroethylene) 9002-84-0 0 0.00001000 0
Trisodium ortho phosphate 7601-54-9 0 0.00073 0
Diammonium peroxidisulphate 7727-54-0 0.02 0.00338 0
Vinylidene chloride/methylacrylate copolymer 25038-72-6 0 0.00063 0
Fresh Water CHESAPEAKE ENERGY Carrier/Base Fluid Water 007732-18-5 100 79.6557 0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2014-05-17 H2O 15 2995 Bbl 330400 Schlumberger STAGE 1/19

30 SHOTS STAGES 2-18 SEE IMAGES

2014-05-21 H2O 15 1989 Bbl 334200 Schlumberger STAGE 19/19

30 SHOTS

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2014 CHESAPEAKE EXPLORATION LLC 264942 18562 127
2015 CHESAPEAKE EXPLORATION LLC 523642 20116 362
2016 CHESAPEAKE EXPLORATION LLC 281907 7733 366
2017 CHESAPEAKE EXPLORATION LLC 211478 4716 365
2018 CHESAPEAKE EXPLORATION LLC 169820 3604 365
2019 CHESAPEAKE EXPLORATION LLC 38333 810 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2014 CHESAPEAKE EXPLORATION LLC Brine 10001 127
2015 CHESAPEAKE EXPLORATION LLC Brine 2069 362
2016 CHESAPEAKE EXPLORATION LLC Brine 2648 366
2017 CHESAPEAKE EXPLORATION LLC Brine 1320 365
2018 CHESAPEAKE EXPLORATION LLC Brine 763 365
2019 CHESAPEAKE EXPLORATION LLC Brine 148 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-190178776 2015-10-23 0:00 PL No Violations
0190178776 2015-10-23 Preliminary Restoration No Violations I was on location to conduct a preliminary restoration inspection. The well is open flow with a wellhead Christmas tree assembly. Jersey barriers were installed around the wellhead. The well is properly identified with a clear, legibly-marked well identification sign. The tank battery consisted of eight, 400 BBL production tanks and was diked. The tanks are located within a spray-lined and sealed secondary containment. There are e-stops outside the barriers, and the tanks are grounded, and have static dissipators. There is a truck grounding area for trucks collecting condensate and/or produced water. Lightning protection and a windsock are installed on top of the production tanks. Other production equipment on the well pad consisted of:



Jersey barriers are installed around the production equipment. The entire well pad is enclosed with a six-foot high, chain link fence with three-strand barbed wire and the man doors were locked. Along the interior of the chain link fence there is an earthen berm and it was stable. The soil stockpile is well-stabilized with vegetation. Drainage and erosion controls at the pad are in place and functioning. A closed-loop, above-ground drilling pit system was used, so there are no earthen pits requiring closure. The pad has a crushed limestone surface, and is in good repair. The lease road is stable and drivable. Preliminary restoration passed.

0798264507 2013-08-14 Drill / Deepen / Reopen No Violations I was on site to witness the cementing of the 20 conductor casing (94 pound per foot / inside diameter 19.124. My inspection revealed that Express Energy Services drilled a 26 hole to a total depth of 120 and ran 120 of 20 casing into the wellbore. Express Energy Services cemented the casing with 247 sacks ClassA cement (2% CaCl and 1/2 pound per sack floseal). The cement had a density of 15.6 pounds per gallon, a yield of 1.18 cubic feet per sack, and they used 5.26 gallons per sack of mix water. They pumped 51.91 barrels of cement slurry, displaced the slurry with 39 barrels of freshwater, and got 6 barrels of cement returns to surface. No violations at this time.
1635072654 2016-03-01 Production Wells No Violations I conducted a status check of this well. Identification signs were posted at the access road entrance, the well, and the storage tanks. The access road gate was in good repair, but was not locked. The #1H well is in production. The well is equipped with a plunger lift assembly. The production tanks are surrounded by a steel dike. The pad is surrounded by a fence. The man gates were not locked, but third party personnel were on site at the time of inspection.

The equipment on the pad consists of the following: 8 - 400 bbl production tanks, three labelled as containing produced water and five labelled as containing condensate, with one low-pressure vertical separator located inside of the dike 6 Producing wells 6 Sand separators 6 Gas Processing Units 1 Heat Treater 1 Vapor Recovery Unit

1739125591 2018-11-01 Production Wells No Violations The well was equipped with a plunger-lift assembly. The surface/intermediate annular gauge displayed zero psi, and the intermediate/production annular gauge displayed 350 psi. I performed a walk-around inspection of the pad and erosional controls appeared functioning. No violations were observed at the time of inspection.
798264507 2013-8-14 0:00: DD No Violations

For data sources see[10]

References