34-019-22451

Well Details

Well ID: 34-019-22451
Loading map...
Country: United States
State: Ohio
County: Carroll
Municipality: Center Township
Operator Name: PENNENERGY RESOURCES LLC
Well Pad ID: US-OH-000747
Farm/Lease Name: JENKINS UNIT
License Status: Producing
License Date: 2013-06-13
Spud Date: 2014-01-24
Spud Drilling Contractor: SIDEWINDER DRILLING INC
Final Drill Date: 2014-04-11
Well Total Depth: 14784.00 ft
Configuration: Horizontal
Latitude: 40.600000
Longitude: -81.060000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2013-06-13 Proposed Formations:UTICA/POINT PLEASANT, Issued Date:6/13/2013, Expired Date:6/13/2015 12:00:00 PM, Drilling unit acres:761.95, Proposed Well Type:OG, Proposed Well Class:EDPW
Correction to Well 2013-11-01 CORRECTION TO WELL NUMBER
Correction to Well 2014-03-21 CHANGE IN UNIT SIZE
Reached Total Depth 2014-04-11 Baker Hughes
Correction to Well 2014-06-13 CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT. UNIT SIZE INCREASED TO 664.99 ACRES.
Correction to Well 2015-01-09 UPDATE TO TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM NEW PLAT. UPDATE TO UNIT SIZE (639.79 ACRES).
Completion Report Received 2015-01-15 Baker Hughes
Construction Permit Expires 2015-06-13 Baker Hughes
Correction to Well 2015-07-31 UPDATE TO TAKE-POINT INFORMATION (FOOTAGE AND COORDINATES) FROM NEW PLAT. VARIANCE AT HEEL GRANTED.
Change of Owner 2018-10-03 Operator changed from 8894, R E GAS DEVELOPMENT LLC to 10212, PENNENERGY RESOURCES LLC
Record Last Modified 2018-10-03 Baker Hughes

For data sources see[2]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 06/16/2014 07/02/2014 7646 13,180,900.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Sand (Proppant) Sargent/Momentive/Preffered Proppant Silica Substrate 14808-60-7 100 12.0093 14,921,600.0
AP Breaker Sagar Enterprise Gel Breaker Ammonium Persulfate 7727-54-0 100 0.00001851 23
Acid Inhibitor, Unihib G GeoSafe Acid Inhibitor Formaldehyde 50-00-0 1 0.00000405 5.031
Short Chained Glycol Ether 112-34-5 60 0.000242945 301.86
Methanol 67-56-1 5 0.00002025 25.155
Acetophenone 98-86-2 1 0.00000405 5.031
Ethoxylated alcohol 68002-97-1 35 0.000141718 176.085
Thiourea 62-56-6 1 0.00000405 5.031
TEA Breaker Activater Sagar Enterprise Gel Breaker Triethanolamine 102-71-6 72.5 0.000426362 529.755
Diethanolamine 111-42-2 13 0.00007645 94.991
Slurry Gel, WGA-7 SLR PolyFrac Plus Gel Petroleum Distillate 64742-47-8 45 0.000996039 1237.58
Clay 14808-60-7 5 0.000110671 137.509
Surfactant 154518-36-2 5 0.000110671 137.509
Guar Gum 9000-30-0 45 0.000996039 1237.58
Scale Inhibitor, ScaleHib A Nalco Scale Inhibitor Ethylene Glycol 107-21-1 30 0.00656524 8157.31
Other - (non-hazardous) NA 70 0.0153189 19033.7
Hydrochloric Acid (7.5%) PVS Acidizing Water 7732-18-5 92.5 0.879992 1,093,390.0
Hydrochloric Acid 7647-01-0 7.5 0.0713507 88653.4
Friction Reducer, Unislick ST-50 CESI Chemical Friction Reducer Other - (non-hazardous) NA 70 0.0515174 64010.4
Petroleum distillates, hydrotreated light 64742-47-8 30 0.0220789 27433
Water Rex Energy Carrier/Base Fluid Water 7732-18-5 100 86.9406 108,024,000.0

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2014-07-01 H2O 8 9772 Bbl 628100 Universal Well Services Inc. STAGE 34/34

80 SHOTS

2014-05-30 H2O 8 9204 Bbl 384600 Universal Well Services Inc. STAGE 1/34

80 SHOTS STAGES 2-33 SEE IMAGES

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2014 R E GAS DEVELOPMENT LLC 281041 37881 120
2015 R E GAS DEVELOPMENT LLC 771866 71689 353
2016 R E GAS DEVELOPMENT LLC 564853 34666 362
2017 R E GAS DEVELOPMENT LLC 356701 16204 285
2018 PENNENERGY RESOURCES LLC 304429 11520 345
2019 PENNENERGY RESOURCES LLC 66429 2343 87

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2014 R E GAS DEVELOPMENT LLC Brine 4943 120
2015 R E GAS DEVELOPMENT LLC Brine 10039 353
2016 R E GAS DEVELOPMENT LLC Brine 4575 362
2017 R E GAS DEVELOPMENT LLC Brine 2902 285
2018 PENNENERGY RESOURCES LLC Brine 25672 345
2019 PENNENERGY RESOURCES LLC Brine 1102 87

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1075553810 2018-10-29 0:00 PW No Violations
-1815945289 2018-6-27 0:00: PW No Violations 1.50
-1899857295 2017-6-21 0:00: PW No Violations
-2042990477 2014-4-1 0:00:0 CS No Violations
-287433862 2014-4-7 0:00:0 DD No Violations
-323473778 2017-6-19 0:00: PW No Violations
-42825153 2019-9-9 0:00:0 PW No Violations 1.00
-672568255 2017-5-17 0:00: PW No Violations
0141095734 2017-06-08 Production Wells No Violations I conducted a status check of the site while HAD drilling was setting conductor pipe on the #1H, 2H, & 7H wells. I reviewed the site location according to the simultaneous operations plan submitted by Rex Energy. Sidewinder #62 was anticipated to move on site during the week of 06/12/2017. Cement barricades were in place as per the simultaneous operations plan to isolate all production equipment from drilling operations. I spoke to Andrew Campolongo, field coordinator for Rex, who informed me that the three western condensate tanks had been emptied as per the simultaneous operations plan. No violations were noted at the time of inspection.
0156440283 2018-12-28 Production Wells Violations Noted I was on site for a status check with DOGRM inspector John Fleming and Regional Supervisor Tom Hill. The well was equipped with a plunger-lift assembly. The surface/intermediate annular gauge displayed a reading of zero psi. Identification posted at the access and well did not list the current owner of PennEnergy Resources. Records indicate that ownership of the well was transferred from R.E. Gas Development LLC to PennEnergy Resources on 10/03/2018. Per OAC: 9-9-05, any changes of ownership shall be shown on posted identification no later than sixty days after the date of transfer. The owner shall posted current identification to well and tank battery by 01/14/2019.
0287433862 2014-04-07 Drill / Deepen / Reopen No Violations I was on location to check the drilling status of the Jenkins # 4-H on 4/7/2014. Sidewinder Rig 63 was pulling the drill string out of the hole in order to allow Express Energy Services run a cement bond on the 9.625 casing. The total depth of the well was 6950. No violations.
0323473778 2017-06-19 Production Wells No Violations I conducted a status check of the well while on location for the surface casing cement job on the Jenkins #7H well. The well is in production. Barricades were installed around the production area, with additional barricades around the well head. I did not locate a surface annular pressure gauge on the well. I will contact Rex Energy to have one installed. Standing water was located around the well head. I tested the standing water for chlorides with a Low-Range Quantab which concluded in a reading of under 36 ppm.
0672568255 2017-05-17 Production Wells No Violations I conducted a status check of this well. I did not conduct a preliminary restoration at this time because R.E Gas and Development will be drilling three more wells on the pad during 2017. Identification signs were posted at the access road entrance, the well, and the storage tanks. The #4H well is in production. The well is equipped with a plunger lift assembly. The production tanks are surrounded by a steel dike. The pad is surrounded by a fence and all man doors were locked.

The equipment on the pad consists of the following: 9 - 400 bbl production tanks, three labelled as containing produced water, and six labelled as containing condensate. 1 Low pressure vertical separator 3 Producing wells 3 Sand separators 3 Gas processing units 1 Heat Treater 1 Vapor Recovery Unit

No violations were noted at the time of inspection.

0783707360 2017-07-17 Production Wells No Violations I conducted a status check of the well while on location to witness the #7H surface cement job. The well is in production, but I did not locate a surface-intermediate annular pressure gauge after my request to Rex Energy have one installed during the week of 06/26/2017. I spoke on site to Larry Barr, production operator, and asked a gauge to be installed. He informed me that he will install a gauge by 07/19/2017.
0923604536 2014-04-03 Casing String Witnessed No Violations I was on the Jenkins # 4-H to observe the cementing operations. Sidewinder Rig #63 ran 9.625 casing to 2000. Universal Well Services mixed and circulated 612 sacks of Gas Block, .15% CR3 cement. Water temp was 45 , pH was -7, Cement was weighed twice first it was 15.3 lbs./gal, then it weighed 15.8 lbs./gal. Cement was returned to surface in the amount of 20 Bbl. Of cement. No violations.
1075553810 2018-10-29 Production Wells No Violations No changes have been made to the production equipment since my last inspection. I performed a walk-around inspection of the pad and erosional controls appeared in place and functioning. The well was equipped with an open-flow assembly. The surface/intermediate annular gauge displayed a reading of zero psi, and the intermediate/production displayed approximately 790 psi.
141095734 2017-6-8 0:00:0 PW No Violations 1.00
1422634925 2015-01-15 Production Wells No Violations I was on location to conduct a status check of this well. The well is open flow with a wellhead tree assembly. Jersey barriers were installed around the wellhead. The tank battery consisted of 9, 400 BBL production tanks and was diked. A windsock was installed on the top of the production tanks. Other production equipment on the well pad consisted of:



The production equipment was also diked. Lightening protection was installed on poles around the production equipment. At the time of the inspection, the fresh water impoundment was still in place and located west of the site. The well is properly identified with a clear, legibly marked well identification sign. The lease road is stable and drivable. No violations found.

1500486221 2017-07-19 Production Wells No Violations I conducted a status check of the well. The well is in production and Sidewinder #62 was on site drilling the #1H well. A surface-intermediate annular gauge had been installed on the well and the gauge displayed zero psi. No violations were noted at the time of inspection.
1548701218 2019-01-25 Production Wells No Violations I was on site for a compliance notice follow-up for lack of updated identification. Proper identification was posted at the time of inspection. The surface/intermediate annular gauge displayed a reading of zero psi and the intermediate/production annular gauge displayed 600 psi. No violations were observed at the time of inspection. The compliance notice can be closed.
156440283 2018-12-28 0:00 PW No Violations 1.00
1815945289 2018-06-27 Production Wells No Violations

I conducted a status check of the well and production pad. Six wells are located on the pad (permit numbers (22734, 22735, 22736, 22452, 224251, 22450). This well is equipped with plunger-lift configuration. The surface-intermediate annulus was equipped pressure relief valve and pressure gauge which displayed a reading of zero psi. Identification was posted at the well and lease entrance. The production tanks and production equipment were surrounded by a lined steel dike. The access road was stable and drivable. Erosional controls appeared to be functioning. Equipment on the pad consisted of the following: Nine 400 bbl production tanks; six labelled as containing condensate and four as containing produced water Six gas processing units with line heaters and vertical separators One combustor unit One vapor recovery unit One oil stabilization unit

1899857295 2017-06-21 Production Wells No Violations I conducted a status check of the well while on location for the Jenkins #7H intermediate cement job. No changes have been made since my last inspection. I did not locate a surface pressure gauge on the well head, but I contacted Shawn McGuigan of R.E Gas Development to have a gauge installed on the well head on 06/21/2017.
2042990477 2014-04-01 Casing String Witnessed No Violations I was on location to observe the cementing operations of the 13.375 surface casing on Sidewinder Rig # 63. Universal cemented 983 of 54.5 lbs./ft casing. Cement load consisted of 791 sacks of Type - 1 , 2 % Calium Chloride, 0.2 % Foam Check, 1/4 lbs. / sack celloflake. Cement was circulated back to surface receiving 40 Bbls. of cement back to surface.Water temp. was 44, pH -7. No violations.
2135410128 2019-8-27 0:00: PW No Violations 0.80
289388362 2020-4-2 0:00:0 PL No Violations 1.00
783707360 2017-7-17 0:00: PW No Violations
923604536 2014-4-3 0:00:0 CS No Violations

Violations Commited

Inspection ID Violation ID Violation Date Violation Code Violation Comments
0156440283 US-OH-115276 2019-02-27 9-9-05(A)10 Failure to legibly identify well

For data sources see[9]