If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-019-22530 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.6,"lon":-81.08,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Carroll | |
Municipality: Center Township | |
Operator Name: PENNENERGY RESOURCES LLC | |
Well Pad ID: US-OH-000805 | |
Farm/Lease Name: GRUNDER | |
License Status: Producing | |
License Date: 2013-11-07 | |
Spud Date: 2013-12-08 | |
Spud Drilling Contractor: SIDEWINDER DRILLING INC | |
Final Drill Date: 2014-01-17 | |
Well Total Depth: 13050.00 ft | |
Configuration: Horizontal | |
Latitude: 40.600000 | |
Longitude: -81.080000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2013-11-07 | Proposed Formations:UTICA/POINT PLEASANT, Issued Date:11/7/2013, Expired Date:11/7/2015 12:00:00 PM, Drilling unit acres:437.64, Proposed Well Type:OG, Proposed Well Class:EDPW |
Reached Total Depth | 2014-01-17 | |
Correction to Well | 2014-02-07 | CHANGE IN TARGET INFORMATION (FOOTAGE AND COORDINATES) FROM AS DRILLED SURVEY PLAT. UNIT SIZE CHANGED TO 438.07 ACRES. |
Correction to Well | 2014-05-09 | CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT. UNIT SIZE CHANGED TO 634.51 ACRES. |
Completion Report Received | 2014-12-08 | |
Correction to Well | 2015-01-16 | UPDATE TO TAKE-POINT INFORMATION (COORDINATES) FROM NEW PLAT. |
Construction Permit Expires | 2015-11-07 | |
Change of Owner | 2018-10-03 | Operator changed from 8894, R E GAS DEVELOPMENT LLC to 10212, PENNENERGY RESOURCES LLC |
Record Last Modified | 2018-10-03 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2014-06-25 | 8215 | 13016 | 0 |
8215 | 13016 | 0 | |
8215 | 13016 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 03/24/2014 | 04/22/2014 | 7631 | 7,322,030.0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Unislick ST-50 | CESI Chemical | Friction Reducer | Petroleum distillates, hydrotreated light | 64742-47-8 | 30 | 0.02775 | 0 |
ScaleHib A | Nalco | Scale Inhibitor | Ethylene Glycol | 107-21-1 | 30 | 0.00648 | 0 | |
Unihib G | Geosafe | Acid Inhibitor | Acetophenone | 98-86-2 | 1 | 0.00001000 | 0 | |
Ethoxylated Alcohol | 68002-97-1 | 35 | 0.00018 | 0 | ||||
Thiourea | 62-56-6 | 1 | 0.00001000 | 0 | ||||
Methanol | 67-56-1 | 5 | 0.00003000 | 0 | ||||
Short Chained Glycol Ether | 112-34-5 | 60 | 0.0003 | 0 | ||||
Formaldehyde | 50-00-0 | 1 | 0.00001000 | 0 | ||||
AP Breaker | Universal | Gel Breaker | Ammonium Persulfate | 7727-54-0 | 100 | 0.00011 | 0 | |
Hydrochloric Acid (7.5%) | PPG Industries | Acidizing | Hydrochloric Acid | 7647-01-0 | 7.5 | 0.08943 | 0 | |
Sand | Sargent | Proppant | Silica Sand | 14808-60-7 | 100 | 11.2941 | 0 | |
WGA-7 SLR | Universal | Gel | Surfactant | 154518-36-2 | 5 | 0.00062 | 0 | |
Guar Gum | 9000-30-0 | 50 | 0.00619 | 0 | ||||
Petroleum Distillate | 64742-47-8 | 55 | 0.00681 | 0 | ||||
Clay | 14808-60-7 | 5 | 0.00062 | 0 | ||||
TEA Breaker Activator | Sagar Enterprise | Gel Breaker | Triethanolamine | 102-71-6 | 72.5 | 0.00135 | 0 | |
Diethanolamine | 111-42-2 | 13 | 0.00024 | 0 | ||||
Water | Rex | Base Fluid | Water | 7732-18-5 | 100 | 87.3845 | 0 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2014-04-16 | H2O | 8 | 6428 Bbl | 330100 | Universal Well Services Inc. | STAGE 19
60 SHOTS |
2014-04-18 | H2O | 8 | 6489 Bbl | 332200 | Universal Well Services Inc. | STAGE 21
60 SHOTS |
2014-04-06 | H2O | 8 | 7302 Bbl | 334300 | Universal Well Services Inc. | STAGE 11
60 SHOTS |
2014-04-14 | H2O | 8 | 6547 Bbl | 338200 | Universal Well Services Inc. | STAGE 18
60 SHOTS |
2014-03-27 | H2O | 8 | 9731 Bbl | 331200 | Universal Well Services Inc. | STAGE 3
60 SHOTS |
2014-04-07 | H2O | 8 | 7257 Bbl | 3336 | Universal Well Services Inc. | STAGE 12
60 SHOTS |
2014-04-03 | H2O | 8 | 7777 Bbl | 353400 | Universal Well Services Inc. | STAGE 8
60 SHOTS |
2014-04-19 | H2O | 8 | 6553 Bbl | 336800 | Universal Well Services Inc. | STAGE 22
60 SHOTS |
2014-04-11 | H2O | 8 | 6653 Bbl | 338800 | Universal Well Services Inc. | STAGE 15
60 SHOTS |
2014-04-04 | H2O | 8 | 7514 Bbl | 309400 | Universal Well Services Inc. | STAGE 9
60 SHOTS |
2014-04-02 | H2O | 8 | 8751 Bbl | 334300 | Universal Well Services Inc. | STAGE 7
60 SHOTS |
2014-03-25 | H2O | 8 | 7731 Bbl | 333800 | Universal Well Services Inc. | STAGE 2
60 SHOTS |
2014-03-31 | H2O | 8 | 7808 Bbl | 253200 | Universal Well Services Inc. | STAGE 6
60 SHOTS |
2014-04-09 | H2O | 8 | 7134 Bbl | 326400 | Universal Well Services Inc. | STAGE 13
60 SHOTS |
2014-04-21 | H2O | 8 | 6455 Bbl | 325100 | Universal Well Services Inc. | STAGE 24
60 SHOTS |
2014-04-12 | H2O | 8 | 6391 Bbl | 314100 | Universal Well Services Inc. | STAGE 16
60 SHOTS |
2014-04-13 | H2O | 8 | 6628 Bbl | 329700 | Universal Well Services Inc. | STAGE 17
60 SHOTS |
2014-04-20 | H2O | 8 | 6472 Bbl | 336800 | Universal Well Services Inc. | STAGE 23
60 SHOTS |
2014-03-28 | H2O | 8 | 7782 Bbl | 284200 | Universal Well Services Inc. | STAGE 4
60 SHOTS |
2014-03-16 | H2O | 8 | 8712 Bbl | 295500 | Universal Well Services Inc. | STAGE 1
60 SHOTS |
2014-03-30 | H2O | 8 | 7569 Bbl | 272300 | Universal Well Services Inc. | STAGE 5
60 SHOTS |
2014-04-17 | H2O | 8 | 6507 Bbl | 325000 | Universal Well Services Inc. | STAGE 20
60 SHOTS |
2014-04-10 | H2O | 8 | 6539 Bbl | 331400 | Universal Well Services Inc. | STAGE 14
60 SHOTS |
2014-04-05 | H2O | 8 | 7604 Bbl | 303900 | Universal Well Services Inc. | STAGE 10
60 SHOTS |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | R E GAS DEVELOPMENT LLC | 201175 | 24080 | 134 |
2015 | R E GAS DEVELOPMENT LLC | 357371 | 25009 | 331 |
2016 | R E GAS DEVELOPMENT LLC | 219159 | 7993 | 293 |
2017 | R E GAS DEVELOPMENT LLC | 159596 | 4334 | 326 |
2018 | PENNENERGY RESOURCES LLC | 128851 | 27340 | 246 |
2019 | PENNENERGY RESOURCES LLC | 27155 | 690 | 61 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | R E GAS DEVELOPMENT LLC | Brine | 5379 | 134 |
2015 | R E GAS DEVELOPMENT LLC | Brine | 9584 | 331 |
2016 | R E GAS DEVELOPMENT LLC | Brine | 3595 | 293 |
2017 | R E GAS DEVELOPMENT LLC | Brine | 2419 | 326 |
2018 | PENNENERGY RESOURCES LLC | Brine | 2019 | 246 |
2019 | PENNENERGY RESOURCES LLC | Brine | 149 | 61 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1433309893 | 2019-10-24 0:00 | PW | No Violations | 1.00 |
-157614214 | 2019-10-28 0:00 | PW | No Violations | 0.90 |
-724286775 | 2018-2-22 0:00: | PW | No Violations | 1.00 |
0227219794 | 2018-06-27 | Production Wells | No Violations | I conducted a status check of the well and production pad. Seven producing wells are located on the pad (permit numbers (2528, 2530, 2498, 2554, 2486, 2553, 2529). This well is equipped with plunger-lift configuration. The surface-intermediate annulus was equipped with a pressure-relief valve and a pressure gauge which displayed a reading of zero psi. Identification was posted at the well and lease entrance. The production tanks and production equipment were surrounded by a lined steel dike. Less than an inch of standing water was present in areas inside the tank battery. I tested the standing water for chlorides using a low-range QuanTab which concluded in a reading of less than 33 ppm. The access road was stable and drivable. Erosional controls were in place and appeared functioning.
Equipment on the pad consisted of the following: Fifteen 400 bbl production tanks; eight labelled as containing condensate and seven as containing produced water Seven gas processing units with vertical separators Two combustor units Three vapor recovery units One oil stabilization unit and tower |
0724286775 | 2018-02-22 | Production Wells | No Violations | I conducted a status check of the pad with DOGRM District Supervisor Stephen Ochs. The surface-intermediate and intermediate-production annular gauges both displayed a reading of zero psi. No violations were observed at the time of inspection. |
0758718797 | 2017-06-29 | Production Wells | No Violations | I was on site with DOGRM Tom Hill, Bob Worstall, and Terry Whitehair, along with R.E Gas Development personnel to drilling an additional three wells (PN# 22553, 22732, 22733) on the pad. I performed a walk-around inspection while on site. The well is equipped with a plunger-lift assembly. I was unable to locate a clear surface-intermediate pressure gauge on the well. I spoke to R.E. Gas Development to have a gauge installed on the surface-intermediate annulus and labelled. |
1071479215 | 2019-10-30 0:00 | PW | No Violations | 1.00 |
1388695029 | 2014-01-02 | Drill / Deepen / Reopen | No Violations | I was on site to witness the cementing of the 13 3/8 inch surface casing. My inspection revealed that Sidewinder 63 has drilled a 17.5 inch hole to a total depth of 1028 feet and ran 1025 feet of 13 3/8 inch surface casing (54.5 pound per foot / inside diameter of 12.615 inches). They installed 10 centalizers on the casing string, on joints 1,2,3,6,9,12,15,18,21,and 24. Universal cemented the casing string with 794 sacks of Type 1 cement with 3% CaCl, 0.2% foam check, and 1/4 pound per sack flake. The cement had a density of 15.6 pounds per gallon, yield of 1.2 cubic feet per sack, and they used 5.2 gallons per sack of mix water. They pumped 169 barrels of cement slurry, 158 barrels of displacement, and there was 26 barrels of cement returns (bumped the plug at 9:40pm). Universal pressured up on the casing to check the floats and conduct the casing test; casing test approved and floats held. My inspection revealed no violations at this time. NOTE: They had trouble rigging up the Blackhawk rotating head and then they couldnt rotate the casing because it was torquing up while trying to rotate. They also had trouble with the top drive on the rig while running the casing. Franks Casing Crew was also having trouble with the casing cross threading while they were trying to run the casing. |
1523149740 | 2017-06-15 | Production Wells | No Violations | I conducted a status check of this well. Identification signs were posted at the access road entrance, the well, and the storage tanks. The access road was equipped with a gate and was locked. The #3H well is in production and is equipped with a plunger lift assembly. The production tanks are surrounded by a steel dike. A sound barrier wall was installed on the north side of the pad.
The equipment on the pad consists of the following: 7 producing wells 7 sand separators 7 gas processing units 1 vapor recovery unit 1 heat treater No violations were noted at the time of inspection. |
1799698085 | 2019-01-31 | Production Wells | No Violations | The well was equipped with a plunger-lift assembly. The surface/intermediate and intermediate/production annular gauges displayed zero psi. The well was recently transferred to PennEnergy Resources LLC, and updated identification was posted. No violations were observed at the time of inspection. |
2016633256 | 2014-01-05 | Drill / Deepen / Reopen | No Violations | I was on site to witness the 9 5/8 inch intermediate casing cement job. My inspection revealed that Sidewinder Rig # 63 has drilled a 12 1/4 inch hole to a total depth of 2040 feet and ran 2036 feet of 9 5/8 inch intermediate casing ( 40 pounds per foot / inside diameter 8.835 inches ). They installed 18 solid body centralizers on the casing string (on joints 1,2,3,6,9,12,15,18,21,24,27,30,33,36,39,42,45, and 47). Universal cemented the casing with 611 sacks of Gasblock Cement with 0.15% CR3, 2% CaCl, and 0.2% foam check. The cement had a density of 15.7 pounds per gallon, a yield of 1.29 cubic feet per sack, and they used 5.54 gallons of mix water per sack. They pumped 140.4 barrels of cement slurry, 149 barrels of displacement (calculated 156 barrels), and there was 16 barrels of cement returns to surface. They landed the plug with approximately 1000 PSI at 10:40pm. They pressured up to 1500 PSI and conducted the casing test; casing test approved at this time. My inspection revealed no violations at this time. |
2128420630 | 2019-8-27 0:00: | PW | No Violations | 0.80 |
2132611846 | 2020-4-2 0:00:0 | PL | No Violations | 1.00 |
227219794 | 2018-6-27 0:00: | PW | No Violations | 2.00 |
758718797 | 2017-6-29 0:00: | PW | No Violations |
For data sources see[10]