X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-019-22719

Well Details

Well ID: 34-019-22719
Loading map...
Country: United States
State: Ohio
County: Carroll
Municipality: Washington Township
Operator Name: PENNENERGY RESOURCES LLC
Well Pad ID: US-OH-001363
Farm/Lease Name: VAUGHN UNIT
License Status: Producing
License Date: 2016-08-05
Spud Date: 2016-04-02
Spud Drilling Contractor: SIDEWINDER DRILLING INC
Final Drill Date: 2016-09-20
Well Total Depth: 15645.00 ft
Configuration: Horizontal
Latitude: 40.630000
Longitude: -81.020000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2016-03-08 Proposed Formations:UTICA THRU POINT PLEASANT, Issued Date:3/8/2016, Expired Date:3/8/2018 12:00:00 PM, Drilling unit acres:571.24, Proposed Well Type:OG, Proposed Well Class:POOL
APP 2016-08-05 Proposed Formations:UTICA THRU POINT PLEASANT, Issued Date:8/5/2016, Expired Date:8/5/2018 12:00:00 PM, Drilling unit acres:639.88, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2016-09-20
Completion Report Received 2017-03-07
Change Location Lat Lon 2017-04-28 LAST PERF LOCATION INFORMATION CHANGED PER AS DRILLED PLAT REC'D ON 2/21/17 - KNR
Construction Permit Expires 2018-08-05
Change of Owner 2018-10-03 Operator changed from 8894, R E GAS DEVELOPMENT LLC to 10212, PENNENERGY RESOURCES LLC
Record Last Modified 2019-01-09

For data sources see[2]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 11/02/2016 12/09/2016 7590 17,665,200.0 20,692,400.0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 ProBreak 100 ProFrac Oxidizer Listed Below
4.0 Guar Slurry ProFrac Proppant Transport Listed Below
Parasorb 5005 Baker Hughes Paraffin Inhibitor Listed Below
Chlorine Dioxide Baker Hughes Biocide Listed Below
Phosphorous acid 13598-36-2 1 0.00003000
Water 7732-18-5 70 0.00392 23774
Sodium salt of Polyamino Phosphonate 1252600-17-1 20 0.00053
Water 7732-18-5 100 86.9708 147,416,000.0
Ethoxylated alcohols 68002-97-1 4 0.00382 6473
Distillate, petroleum, hydrotreated, light 64742-47-8 45 0.07515 127373
Calcined Diatomaceous Earth 91053-39-3 100 0.00657
Sulphamidic acid 5329-14-6 5 0.00028 1698
Water 7732-18-5 70 0.00119 2020
Crystalline Silica:Quartz (SiO2) 14808-60-7 1 0.00007000
Mineral Oil 8042-47-5 5 0.00033
2-Propenoic acid, ammonium salt,

polymer with 2-propenamide, sodium salt

910644-97-2 45 0.04296 72820
Acetic acid ethenyl ester, polymer with ethene 24937-78-8 5 0.00033
Crystalline silica quartz 14808-60-7 1 0.00003000
Water 7732-18-5 85 0.00089 5422
Organophosphonate 129828-36-0 15 0.00306
Water 7732-18-5 75 0.01529
Chlorine dioxide 10049-04-4 0.3 0.00162
Ammonium peroxydisulfate 7727-54-0 100 0.00059 3470
Hydrotreated petroleum distillate 64742-47-8 35 0.03341 56638
Sodium hydroxide 1310-73-2 30 0.00051 866
Napthalene 91-20-3 1 0.00007000
Complex Ester 68607-07-8 30 0.00197
Guar gum 9000-30-0 55 0.09184 155678
Diatomaceous earth, calcined 91053-39-3 50 0.00132
Sodium chloride 7647-14-5 5 0.00013
Water 7732-18-5 72 0.10829 656300
2-Propyn-1-ol compound w/ methyloxirane 38172-91-7 15 0.00016 957
Silica Sand 14808-60-7 100 12.2078 20,692,400.0
Water 7732-18-5 30 0.00079
Trimethylbenzene 95-63-6 0.5 0.00003000
Ethoxylated alcohols 68439-50-9 4 0.00382 6473
Crystalline silica: Cristobalite 14464-46-1 1 0.00007000
Heavy Aromatic Naptha 64742-94-5 10 0.00657
Citric acid 77-92-9 40 0.00224 13585
Ammonium chloride 12125-02-9 1 0.0002
Hydrochloric acid 7647-01-0 28 0.04211 255228
Diatomaceous Earth, Natural (kieselguhr) 61790-53-2 5 0.00033
Ethoxylated alcohols 68551-12-2 4 0.00382 6473
Methanol 67-56-1 30 0.00611
Water 7732-18-5 50 0.04774 80912
Phosphonic acid, sodium salt 15475-67-9 5 0.00013
Ammonium acetate 631-61-8 12 0.01146 19419
10% Acid Amrox Acidizing Listed Below
ProBuff 300 ProFrac pH Buffer Listed Below
FR 7020 ECM Friction Reducer Listed Below
ProFE 105 ProFrac Iron Control Listed Below
ProHib 100 ProFrac Acid Inhibitor Listed Below
ScaleSorb 12 Baker Hughes Scale Inhibitor Listed Below
Water Rex Base Fluid Listed Below
Scaletrol 767W Baker Hughes Scale inhibitor Listed Below
Sand ProFrac Proppant Listed Below

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2016-12-08 H2O 0 12595 Gal 564438 ProFrac was the pumping contractor
2016-10-26 H2O 0 7367 Bbl 0 STAGE 1

60 SHOTS PRO FRAC

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2016 R E GAS DEVELOPMENT LLC 3785 64 5
2017 R E GAS DEVELOPMENT LLC 507133 20650 320
2018 PENNENERGY RESOURCES LLC 382693 7659 356
2019 PENNENERGY RESOURCES LLC 92922 1853 90

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2016 R E GAS DEVELOPMENT LLC Brine 0 5
2017 R E GAS DEVELOPMENT LLC Brine 38032 320
2018 PENNENERGY RESOURCES LLC Brine 13254 356
2019 PENNENERGY RESOURCES LLC Brine 2704 90

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-10638608 2020-4-2 0:00:0 PL No Violations 1.00
-2079099533 2016-12-2 0:00: CT No Violations
-96733417 2016-11-3 0:00: CT No Violations
0096733417 2016-11-03 Completion Testing No Violations I was on the Vaughn Pad to observe stimulation operations on the Vaughn # 1-H, Vaughn # 2-H, Vaughn #3-H and Vaughn #4-H. Go Frac supplied the pumping services, Renegade Wireline provided perforation and frac plug services. I observed the 2nd stage of the Vaughn # 2-H well. The second stage covered the interval from 15,270 MD to 15,408MD. There were five clusters of perforations per stage. Each cluster contained 12 shots ( 0.42 EHD ) at six (6) shots per foot with 60 degree phasing. The stage fluid volume was 8105 barrels, which transported 381,000 lbs. of sand. The stage treated at 65 bpm with a pressure of 7800 psi. Simultaneous operations were being conducted on the Vaughn # 3-H well by Renegade Wireline Services. A survey of the Vaughn Pad did not identify any violations.
1768475614 2018-06-20 Production Wells No Violations I conducted a status check of the well and production pad. The pad is equipped with four wells (permit numbers 2718, 2719, 2720, 2721) and this well is equipped with an open flow assembly. Proper identification was posted at the well and lease entrance. The tank battery is surrounded by a steel dike. The enclosed tank battery and contained less than one inch of standing water. I tested the standing water for chlorides using a low-range QuanTab, which concluded in a reading of under 33 pppm. The access road was stable and drivable. I performed an inspection of the perimeter of the pad, and erosional controls appeared to be in place and functioning.

Equipment on the pad consisted of the following:




I did not locate a surface-intermediate annular pressure gauge. I contacted operator who stated they in the process of acquiring gauges from the supplier, and an annular gauge will be installed as soon as possible.

2079099533 2016-12-02 Completion Testing No Violations I was on the Vaughn pad to observe the stimulation of # 2 - H well. The stage was the 119th out of a total of 158 stages for the pad. ProFrac was the frac contractor for the pad. As the stage was started the material Blender broke down and the operation stopped. Josh Kahle ( Rex Energy Completions Engineer ) informed me that the delay would be quite awhile to transport another Blender and exchange out. A walk around inspection covered the sand handling, wireline, brine off loading and chemical areas of the pad. No violations were identified during this inspection.

For data sources see[9]

References