If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-139-20762 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.58,"lon":-82.56,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Richland | |
Municipality: Jefferson Township | |
Operator Name: BI JOE DEVELOPMENT INC | |
Well Pad ID: | |
Farm/Lease Name: GINGERICH UNIT | |
License Status: Producing | |
License Date: 2019-06-14 | |
Spud Date: 2013-06-13 | |
Spud Drilling Contractor: MARIC DRILLING CO. | |
Final Drill Date: 2013-06-22 | |
Well Total Depth: 4455.00 ft | |
Configuration: Vertical | |
Latitude: 40.580000 | |
Longitude: -82.560000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2013-04-29 | Proposed Formations:CLINTON THROUGH TREMPEALEAU, Issued Date:4/29/2013, Expired Date:4/29/2015 12:00:00 PM, Drilling unit acres:50.523, Proposed Well Type:OG, Proposed Well Class:EW |
Reached Total Depth | 2013-06-22 | |
Completion Report Received | 2013-10-09 | |
Construction Permit Expires | 2015-04-29 | |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2013-10-09 | 4354 | 4408 | 28 |
4354 | 4408 | 28 | |
4354 | 4408 | 28 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2013-06-28 | ACID | 15 | 3150 Gal | 0 | Producers Service Corporation | The well was treated with Hydrochloric acid. ODNR was notified and the job was witnessed. Fluid was recovered into a portable tank on site. Columbus permitting geologists were also on site to observe the job. |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
0 | 0 | 0 | ||
2013 | BI JOE DEVELOPMENT INC | 83.00 | 77.00 | 153 |
2014 | BI JOE DEVELOPMENT INC | 316.00 | 155.00 | 153 |
2015 | BI JOE DEVELOPMENT INC | 126.00 | 79.00 | 153 |
2016 | BI JOE DEVELOPMENT INC | 81.00 | 81.00 | 365 |
2017 | BI JOE DEVELOPMENT INC | 74.00 | 0.00 | 365 |
2018 | BI JOE DEVELOPMENT INC | 65.00 | 69.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2013 | BI JOE DEVELOPMENT INC | Brine | 70 | 153 |
2014 | BI JOE DEVELOPMENT INC | Brine | 240 | 153 |
2015 | BI JOE DEVELOPMENT INC | Brine | 140 | 153 |
2016 | BI JOE DEVELOPMENT INC | Brine | 200 | 365 |
2017 | BI JOE DEVELOPMENT INC | Brine | 180 | 365 |
2018 | BI JOE DEVELOPMENT INC | Brine | 155 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1603847770 | 2013-6-24 0:00: | DD | No Violations | 2.00 |
-513746705 | 2013-6-14 0:00: | DD | No Violations | |
-838086997 | 2013-6-26 0:00: | DD | No Violations | 3.00 |
0513746705 | 2013-06-14 | Drill / Deepen / Reopen | No Violations | Inspect drill location. Drill 11 inch surface casing hole to 860 feet, set 798 feet measured from grade of 8.625 inch new 23 pound casing. four centralizers set every 5 to 6 joints, total 19 joints of pipe. Cement with 172 sacks of cement with loss circulation material. Good returns. |
0553084684 | 2019-05-29 | Production Wells | No Violations | Identification is posted and no observed violations at the time of this inspection. |
0658163127 | 2014-07-02 | Production Wells | No Violations | The site is 100% vegetated except for the lease road. The road is stable, no erosion. ID posted at the tanks. The well is equipped with a pump jack, rods and tubing and is in production. |
0692241112 | 2013-06-28 | Drill / Deepen / Reopen | No Violations | Request by the well owner to witness acid treatment job on the well. Producers Service Co. supplied and pumped hydrochloric acid. Bakerwell service rig is on site. |
0838086997 | 2013-06-26 | Drill / Deepen / Reopen | No Violations | Operator advised they would be solidifying and closing pits. Baked lime powder was mixed in to the mud and cuttings in the pits. 2 loads of water were hauled out of pits. Water was pumped down to the level of the mud and an excavator was used to mix in lime. The operator was also grading the site around the well. |
0861772080 | 2013-06-11 | Drill / Deepen / Reopen | No Violations | Maric drilling is grading the site. The rig is expeced in 1 to 2 days. |
1371666902 | 2013-06-19 | Drill / Deepen / Reopen | No Violations | Drilling is at 3070 feet. Drilling on fluid. The driller expects to reach TD on Saturday. |
1372886265 | 2013-07-03 | Preliminary Restoration | No Violations | The site needs to be finish graded. The well has been equipped with a pump jack, rods and tubing. The pumper was on location and the well was being pumped into a portable tank. |
1374076613 | 2013-07-17 | Preliminary Restoration | No Violations | R&B and Bakerwell were on site. Baker was setting tanks and working on the dike area. R&B was grading topsoil on the disturbed area. |
1376501911 | 2013-08-14 | Preliminary Restoration | No Violations | The disturbed area has been seeded and vegetation is established. Tanks are 55 ft from the roadway and 102 feet from the well. Fencing has been placed around the well and tank battery. Gates have been installed on the lease road. ID needs to be posted at the tank battery. Preliminary restoration is approved. |
1522345367 | 2018-03-29 | Production Wells | No Violations | The well is equipped with a pump jack, rods and tubing and is in production. There are 2-100 barrel tanks and a separator in the tank battery. ID is posted at the tanks. |
1549996662 | 2019-02-12 | Production Wells | No Violations | Identification is posted and no observed violations at the time of this inspection |
1572620625 | 2019-11-1 0:00: | PB | No Violations | 0.50 |
1603847770 | 2013-06-24 | Drill / Deepen / Reopen | No Violations | Production casing was cemented over the weeekend. Drilling is completed. The rig is being moved out. The pits are going to be solidified and the operator is planning to acidize the well. |
2095226297 | 2020-9-29 0:00: | PB | No Violations | |
553084684 | 2019-5-29 0:00: | PW | No Violations | |
658163127 | 2014-7-2 0:00:0 | PW | No Violations | 0.50 |
692241112 | 2013-6-28 0:00: | DD | No Violations | 4.00 |
861772080 | 2013-6-11 0:00: | DD | No Violations | 0.50 |
For data sources see[9]