If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0875090709000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.525314,"lon":-115.400687,"icon":""}]} |
Location: 00/09-07-087-09W5/0 | |
Location Alias: 00/09-07-87-09 W5M | |
Location Alias 2: 00/09-07-087-09 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 087 | |
Meridian: 5 | |
Range: 09 | |
Section: 07 | |
County/Municipality: Loon Lake 235 | |
Well Name: STAR ET AL LOON 9-7-87-9 | |
Operator Name: Harvest Operations Corp. | |
License Number: 0205120 | |
License Date: 1997-08-19 | |
License Status: Abandoned | |
Spud Date: 1997-09-18 | |
Final Drill Date: 1997-10-13 | |
Well Total Depth: 1935.00 m | |
Surface Hole Latitude: 56.525314 | |
Surface Hole Longitude: -115.400687 |
Date | Event |
---|---|
1997-08-19 | Obtained License |
1997-09-21 | Surface Casing Operation Performed |
1997-09-22 | Direction Drilling Operation Performed - Deviate |
1997-09-24 | Lost Circulation Occurred |
1997-09-29 | Production Casing Operation Performed |
1997-10-13 | Finished Drilling |
1997-10-13 | Well Mode changed to Drilled and Cased |
1997-10-15 | Well Log Performed |
1997-10-17 | Liner Casing Operation Performed |
1997-10-17 | Rig Released |
1997-10-20 | Well Log Performed |
1997-10-23 | Well Log Performed |
1997-11-02 | Well Log Performed |
1997-11-03 | Perforation Treatment Performed - Jet Perforation |
1997-11-03 | Well Log Performed |
1997-11-05 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1997-11-06 | Perforation Treatment Performed - Jet Perforation |
1997-11-06 | Well Log Performed |
1997-11-09 | Perforation Treatment Performed - Fractured |
1997-12-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1997-12-12 | Perforation Treatment Performed - Jet Perforation |
1997-12-12 | Plug Back Performed |
1997-12-14 | Perforation Treatment Performed - Fractured |
1998-01-21 | Well Began Production |
1998-01-21 | Well Fluid changed to Crude Oil |
1998-01-21 | Well Mode changed to Pumping |
2013-08-04 | Well Log Performed |
2013-08-05 | Well Log Performed |
2013-08-06 | Well Log Performed |
2013-10-25 | Well Log Performed |
2013-10-26 | Perforation Treatment Performed - Jet Perforation |
2013-10-26 | Well Log Performed |
2013-10-28 | Perforation Treatment Performed - Remedial Casing |
2013-11-10 | Well Log Performed |
2013-11-22 | Perforation Treatment Performed - Jet Perforation |
2013-11-22 | Well Log Performed |
2013-12-03 | Perforation Treatment Performed - Remedial Casing |
2014-02-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2014-02-08 | Plug Back Performed |
2014-02-08 | Well Fluid changed to Crude Oil |
2014-02-08 | Well Log Performed |
2014-02-08 | Well Mode changed to Abandoned Zone |
2014-02-24 | Well Abandoned |
2014-02-24 | Well Fluid changed to Crude Oil |
2014-02-24 | Well Mode changed to Abandoned |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1997-09-22 | 303.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1997-11-03 | Perforation | 1913.00 | 1916.00 | 14 |
1997-12-14 | Fracture | 1737.00 | 1767.00 | 0 |
2013-10-26 | Perforation | 366.00 | 367.00 | 17 |
2013-10-28 | Remedial Casing Cementing | 366.00 | 367.00 | 0 |
2013-11-22 | Perforation | 354.00 | 355.00 | 17 |
2013-12-03 | Remedial Casing Cementing | 354.00 | 355.00 | 0 |
2014-02-08 | Packing Device Capped w/Cement | 694.00 | 702.00 | 0 |
1997-11-05 | Acid Treatment | 1913.00 | 1916.00 | 0 |
1997-11-06 | Perforation | 1905.00 | 1910.00 | 14 |
1997-11-09 | Fracture | 1905.00 | 1910.00 | 0 |
1997-12-12 | Packing Device Capped w/Cement | 1882.00 | 1890.00 | 0 |
1997-12-12 | Packing Device Capped w/Cement | 1873.00 | 1881.00 | 0 |
1997-12-12 | Perforation | 1737.00 | 1744.00 | 14 |
1997-12-12 | Perforation | 1747.00 | 1756.00 | 14 |
1997-12-12 | Perforation | 1760.00 | 1767.00 | 14 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1998 | 7992 | 0.0 | 0.0 | 0.0 |
1999 | 8560 | 0.0 | 0.0 | 0.0 |
2000 | 7568 | 0.0 | 0.0 | 0.0 |
2001 | 7770 | 0.0 | 0.0 | 0.0 |
2002 | 8179 | 0.0 | 0.0 | 0.0 |
2003 | 8516 | 0.0 | 0.0 | 0.0 |
2004 | 7980 | 0.0 | 0.0 | 0.0 |
2005 | 1449 | 0.0 | 0.0 | 0.0 |
2006 | 3720 | 0.0 | 0.0 | 0.0 |
2007 | 8012 | 0.0 | 0.0 | 0.0 |
2008 | 7340 | 0.0 | 0.0 | 0.0 |
2009 | 8665 | 0.0 | 0.0 | 0.0 |
2010 | 8719 | 0.0 | 0.0 | 0.0 |
2011 | 8106 | 0.0 | 0.0 | 0.0 |
2012 | 8769 | 0.0 | 0.0 | 0.0 |
2013 | 5082 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1997-09-24 | Lost Circulation | 729.00 | 1234.00 |
2014-02-09 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]