X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0534260213003

Well Details

Well ID: 0534260213003
Loading map...
Location: 00/13-02-053-26W4/3
Location Alias: 00/13-02-53-26 W4M
Location Alias 2: 00/13-02-053-26 W4/03
Country: Canada
Province: Alberta
Township: 053
Meridian: 4
Range: 26
Section: 02
County/Municipality: Parkland County
Well Name: TIDEWATER ACH 13-2-53-26
Operator Name: Tidewater Midstream and Infrastructure Ltd.
License Number: 0001717
License Date: 1950-07-06
License Status: Suspension
Spud Date: 1950-07-11
Final Drill Date: 1950-09-02
Well Total Depth: 1564.10 m
Surface Hole Latitude: 53.553811
Surface Hole Longitude: -113.734917

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1950-07-06 Obtained License
1950-07-21 Drill Stem Test Performed
1950-07-24 Drill Stem Test Performed
1950-07-25 Drill Stem Test Performed
1950-07-29 Drill Stem Test Performed
1950-07-30 Drill Stem Test Performed
1950-07-31 Drill Stem Test Performed
1950-08-03 Drill Stem Test Performed
1950-08-10 Drill Stem Test Performed
1950-08-12 Drill Stem Test Performed
1950-08-14 Drill Stem Test Performed
1950-08-19 Intermediate Casing Operation Performed
1950-08-29 Drill Stem Test Performed
1950-09-02 Drill Stem Test Performed
1950-09-02 Finished Drilling
1950-09-02 Perforation Treatment Performed - Open-Hole Completion
1950-09-02 Well Mode changed to Drilled and Cased
1961-02-02 Perforation Treatment Performed - Acid Wash - No Pressure
1963-02-27 Well Log Performed
1982-10-04 Perforation Treatment Performed - Cement Plug
1982-10-04 Perforation Treatment Performed - Open-Hole Completion
1982-10-07 Perforation Treatment Performed - Jet Perforation
1987-04-27 Perforation Treatment Performed - Open-Hole Completion
1987-04-28 Well Log Performed
1987-04-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-07-02 Well Log Performed
1989-06-29 Perforation Treatment Performed - Jet Perforation
1989-06-29 Well Log Performed
1989-06-30 Well Log Performed
1989-10-13 Well Log Performed
1989-10-14 Perforation Treatment Performed - Cement Plug
1989-10-14 Perforation Treatment Performed - Open-Hole Completion
1989-10-17 Well Log Performed
1989-10-18 Perforation Treatment Performed - Jet Perforation
1989-10-18 Well Log Performed
1990-12-13 Well Log Performed
1991-01-02 Well Log Performed
1991-01-03 Perforation Treatment Performed - Open-Hole Completion
1991-01-04 Well Log Performed
1991-01-06 Liner Casing Operation Performed
1991-01-06 Perforation Treatment Performed - Cement Squeeze
1991-01-08 Perforation Treatment Performed - Jet Perforation
1991-01-08 Well Log Performed
1991-01-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-01-11 Well Log Performed
1991-10-17 Perforation Treatment Performed - Chemical Squeeze
1992-04-20 Perforation Treatment Performed - Chemical Squeeze
1992-07-16 Well Log Performed
1992-07-17 Well Log Performed
2004-08-04 Well Log Performed
2005-07-22 Well Log Performed
2005-07-27 Perforation Treatment Performed - Jet Perforation
2005-07-28 Well Log Performed
2005-09-30 Perforation Treatment Performed - Acid Squeeze - Press Used
2005-10-01 Perforation Treatment Performed - Acid Squeeze - Press Used
2005-11-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-11-21 Plug Back Performed
2005-11-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-11-22 Plug Back Performed
2005-11-23 Perforation Treatment Performed - Jet Perforation
2005-11-23 Well Log Performed
2005-11-24 Perforation Treatment Performed - Jet Perforation
2005-11-24 Well Log Performed
2005-12-02 Perforation Treatment Performed - Remedial Casing
2005-12-09 Perforation Treatment Performed - Jet Perforation
2008-05-19 Well Log Performed
2008-05-20 Perforation Treatment Performed - Cement Squeeze
2008-05-20 Plug Back Performed
2008-05-27 Well Log Performed
2008-05-29 Perforation Treatment Performed - Jet Perforation
2008-07-08 Well Began Production
2008-07-08 Well Fluid changed to Gas
2008-07-08 Well Mode changed to Flowing
2009-10-21 Perforation Treatment Performed - Jet Perforation
2009-10-21 Well Log Performed
2009-10-23 Perforation Treatment Performed - Fractured
2012-06-12 Well Fluid changed to Gas
2012-06-12 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1950-09-02 Open Hole/Barefoot Completion 1501.40 1551.40 0
1989-10-14 Open Hole/Barefoot Completion 1501.40 1534.80 0
1989-10-18 Perforation 1520.30 1521.00 13
1991-01-03 Open Hole/Barefoot Completion 1501.40 1564.10 0
1991-01-06 Cement Squeeze 1501.40 1562.70 0
1991-01-08 Perforation 1522.00 1522.70 15
1991-01-08 Perforation 1523.50 1524.20 15
1991-01-08 Perforation 1525.00 1525.70 15
1991-01-08 Perforation 1526.50 1527.20 15
1991-01-08 Perforation 1528.00 1528.70 15
1991-01-08 Perforation 1529.50 1530.20 15
1961-02-02 Acid Wash 1501.40 1551.40 0
1991-01-08 Perforation 1531.00 1531.70 15
1991-01-09 Acid Treatment 1522.00 1531.70 0
1991-10-17 Chemical Squeeze 1522.00 1531.70 0
1992-04-20 Chemical Squeeze 1522.00 1522.70 0
2005-07-27 Perforation 1515.50 1517.50 13
2005-09-30 Acid Treatment 1515.00 1517.50 0
2005-10-01 Acid Treatment 1515.50 1517.50 0
2005-11-21 Packing Device Capped w/Cement 1502.00 1510.00 0
2005-11-22 Packing Device Capped w/Cement 1374.00 1424.80 0
2005-11-23 Perforation 1029.00 1030.00 20
1982-10-04 Cement Plug 1521.00 1551.40 0
2005-11-24 Perforation 960.00 961.00 20
2005-12-02 Remedial Casing Cementing 960.00 1030.00 0
2005-12-09 Perforation 995.00 997.00 20
2008-05-20 Cement Squeeze 995.00 997.00 0
2008-05-29 Perforation 1222.40 1223.00 13
2008-05-29 Perforation 1222.00 1222.90 13
2009-10-21 Perforation 1155.00 1157.00 20
2009-10-23 Fracture 1155.00 1157.00 0
1982-10-04 Open Hole/Barefoot Completion 1501.40 1521.00 0
1982-10-07 Perforation 1516.50 1519.50 13
1987-04-27 Open Hole/Barefoot Completion 1501.40 1552.60 0
1987-04-29 Acid Treatment 1501.40 1516.40 0
1989-06-29 Perforation 1521.10 1522.10 13
1989-10-14 Cement Plug 1534.80 1552.60 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2008 4107 0.0 0.0 0.0
2009 6814 0.0 0.0 0.0
2010 2 0.0 0.0 0.0

For data sources see[5]

References