X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0364122412000

Well Details

Well ID: 0364122412000
Loading map...
Location: 00/12-24-036-12W4/0
Location Alias: 00/12-24-36-12 W4M
Location Alias 2: 00/12-24-036-12 W4/00
Country: Canada
Province: Alberta
Township: 036
Meridian: 4
Range: 12
Section: 24
County/Municipality: County of Paintearth No. 18
Well Name: MOSBACHER LL&E PROVOST 12-24-36-12
Operator Name: Rocky River Resources Ltd.
License Number: 0064571
License Date: 1977-06-30
License Status: RecCertified
Spud Date: 1977-07-03
Final Drill Date: 1977-07-06
Well Total Depth: 1079.00 m
Surface Hole Latitude: 52.108559
Surface Hole Longitude: -111.596735

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-06-30 Obtained License
1977-07-06 Finished Drilling
1977-07-06 Well Mode changed to Drilled and Cased
1977-07-07 Production Casing Operation Performed
1977-07-15 Perforation Treatment Performed - Jet Perforation
1977-07-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-07-21 Perforation Treatment Performed - Fractured
1977-08-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1977-08-19 Perforation Treatment Performed - Jet Perforation
1977-12-15 Well Began Injection
1977-12-15 Well Fluid changed to Water
1977-12-15 Well Type changed to Injection
1986-05-01 Well Fluid changed to Water
1986-05-01 Well Mode changed to Suspended
1986-05-01 Well Type changed to Injection
1986-12-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1986-12-04 Plug Back Performed
1986-12-04 Well Fluid changed to Water
1986-12-04 Well Mode changed to Abandoned
1986-12-04 Well Type changed to Injection
1987-05-05 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1977-07-15 Perforation 1048.80 1051.00 7
1977-07-18 Acid Treatment 1048.80 1051.00 0
1977-07-21 Fracture 1048.80 1051.00 0
1977-08-03 Packing Device Capped w/Cement 944.90 944.90 0
1977-08-19 Perforation 918.70 920.20 7
1986-12-04 Packing Device Capped w/Cement 770.00 770.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0

For data sources see[5]

References