If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0744243013020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.429802,"lon":-113.692226,"icon":""}]} |
Location: 02/13-30-074-24W4/0 | |
Location Alias: 02/13-30-74-24 W4M | |
Location Alias 2: 02/13-30-074-24 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 074 | |
Meridian: 4 | |
Range: 24 | |
Section: 30 | |
County/Municipality: Municipal District of Lesser Slave River No. 124 | |
Well Name: DELTASTREAM MARTENH 13-30-74-24 | |
Operator Name: Deltastream Energy Corporation | |
License Number: 0494344 | |
License Date: 2019-04-30 | |
License Status: Amended | |
Spud Date: 2019-09-30 | |
Final Drill Date: 2019-11-10 | |
Well Total Depth: 2242.00 m | |
Surface Hole Latitude: 55.429802 | |
Surface Hole Longitude: -113.692226 |
Date | Event |
---|---|
2019-04-30 | Obtained License |
2019-09-30 | Set Surface |
2019-10-01 | Surface Casing Operation Performed |
2019-11-07 | Direction Drilling Operation Performed - Deviate |
2019-11-07 | Direction Drilling Operation Performed - Horizontal |
2019-11-07 | Resumption |
2019-11-07 | Well Log Performed |
2019-11-08 | Intermediate Casing Operation Performed |
2019-11-10 | Finished Drilling |
2019-11-10 | Perforation Treatment Performed - Open-Hole Completion |
2019-11-10 | Well Log Performed |
2019-11-10 | Well Mode changed to Drilled and Cased |
2019-11-14 | Well Log Performed |
2019-11-19 | Rig Released |
2019-12-01 | Well Began Production |
2019-12-01 | Well Fluid changed to Crude Bitumen |
2019-12-01 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2019-11-07 | Precision Drilling Corporation | 294 | Resumption | |
2019-09-30 | Komat Drilling Ltd. | 4 | Set Surface |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2019-11-07 | 325.70 | Deviate (5 - 79 degrees) |
2019-11-07 | 662.10 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2019-11-10 | Open Hole/Barefoot Completion | 716.00 | 2242.00 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2019 | 727 | 0.0 | 0.0 | 0.0 |
2020 | 2171 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2019-11-10 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]