X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0054153215000

Well Details

Well ID: 0054153215000
Loading map...
Location: 00/15-32-005-15W4/0
Location Alias: 00/15-32-05-15 W4M
Location Alias 2: 00/15-32-005-15 W4/00
Country: Canada
Province: Alberta
Township: 005
Meridian: 4
Range: 15
Section: 32
County/Municipality: County of Warner No. 5
Well Name: LOUDEL BOOKER CONRAD 15-32-5-15
Operator Name: Allied Oil & Gas Corp.
License Number: 0050192
License Date: 1974-06-20
License Status: RecCertified
Spud Date: 1974-06-20
Final Drill Date: 1974-06-24
Well Total Depth: 950.10 m
Surface Hole Latitude: 49.434796
Surface Hole Longitude: -111.988483

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1974-06-20 Obtained License
1974-06-24 Drill Stem Test Performed
1974-06-24 Finished Drilling
1974-06-24 Well Mode changed to Drilled and Cased
1974-06-25 Production Casing Operation Performed
1975-02-28 Perforation Treatment Performed - Jet Perforation
1975-03-08 Well Began Production
1975-03-08 Well Fluid changed to Crude Oil
1975-03-08 Well Mode changed to Pumping
1975-10-31 Well Fluid changed to Crude Oil
1975-10-31 Well Mode changed to Suspended
1985-10-25 Perforation Treatment Performed - Jet Perforation
1986-04-01 Well Fluid changed to Crude Oil
1986-04-01 Well Mode changed to Pumping
1987-01-17 Well Fluid changed to Crude Oil
1987-01-17 Well Mode changed to Suspended
1990-08-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-08-26 Perforation Treatment Performed - Jet Perforation
1990-08-26 Plug Back Performed
1990-08-26 Well Abandoned
1990-08-26 Well Fluid changed to Crude Oil
1990-08-26 Well Log Performed
1990-08-26 Well Mode changed to Abandoned
1990-08-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-08-27 Perforation Treatment Performed - Remedial Casing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-02-28 Perforation 944.90 945.80 7
1985-10-25 Perforation 945.20 946.20 14
1990-08-26 Packing Device Capped w/Cement 922.00 930.00 0
1990-08-26 Perforation 300.00 302.00 13
1990-08-27 Acid Treatment 300.00 302.00 0
1990-08-27 Remedial Casing Cementing 300.00 302.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1975 1012 0.0 0.0 0.0
1986 3671 0.0 0.0 0.0

For data sources see[5]

References