X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0746093501000

Well Details

Well ID: 0746093501000
Loading map...
Location: 00/01-35-074-09W6/0
Location Alias: 00/01-35-74-09 W6M
Location Alias 2: 00/01-35-074-09 W6/00
Country: Canada
Province: Alberta
Township: 074
Meridian: 6
Range: 09
Section: 35
County/Municipality: County of Grande Prairie No. 1
Well Name: KELT EXP HZ VALHALLA 1-35-74-9
Operator Name: Kelt Exploration Ltd.
License Number: 0488507
License Date: 2018-03-08
License Status: Issued
Spud Date: 2018-05-11
Final Drill Date: 2018-05-23
Well Total Depth: 4914.00 m
Surface Hole Latitude: 55.427372
Surface Hole Longitude: -119.229804

For data sources see[1][2]

Well History

Date Event
2018-03-08 Obtained License
2018-05-11 Surface Casing Operation Performed
2018-05-14 Direction Drilling Operation Performed - Deviate
2018-05-17 Direction Drilling Operation Performed - Horizontal
2018-05-21 Production Casing Operation Performed
2018-05-23 Finished Drilling
2018-05-23 Well Log Performed
2018-05-23 Well Mode changed to Drilled and Cased
2018-05-25 Perforation Treatment Performed - Open-Hole Completion
2018-05-25 Production Casing Operation Performed
2018-05-25 Rig Released
2018-06-11 Perforation Treatment Performed - Multi-Stage Fracture
2018-06-12 Perforation Treatment Performed - Multi-Stage Fracture
2018-06-13 Perforation Treatment Performed - Multi-Stage Fracture
2018-06-14 Perforation Treatment Performed - Multi-Stage Fracture
2018-06-16 Perforation Treatment Performed - Multi-Stage Fracture
2018-06-17 Perforation Treatment Performed - Multi-Stage Fracture
2018-06-23 Well Began Production
2018-06-23 Well Fluid changed to Gas
2018-06-23 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2018-05-14 1847.60 Deviate (5 - 79 degrees)
2018-05-17 2347.20 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-05-25 Open Hole/Barefoot Completion 4904.00 4914.00 0
2018-06-13 Multi-Stage Fracture 4493.90 4494.00 0
2018-06-13 Multi-Stage Fracture 4453.20 4453.30 0
2018-06-13 Multi-Stage Fracture 4399.20 4399.30 0
2018-06-13 Multi-Stage Fracture 4357.00 4357.10 0
2018-06-13 Multi-Stage Fracture 4302.00 4302.10 0
2018-06-13 Multi-Stage Fracture 4259.60 4259.70 0
2018-06-13 Multi-Stage Fracture 4204.70 4204.80 0
2018-06-13 Multi-Stage Fracture 4161.70 4161.80 0
2018-06-13 Multi-Stage Fracture 4106.60 4106.70 0
2018-06-14 Multi-Stage Fracture 4065.30 4065.40 0
2018-06-11 Multi-Stage Fracture 4879.80 4879.90 0
2018-06-14 Multi-Stage Fracture 4009.40 4009.50 0
2018-06-14 Multi-Stage Fracture 3968.90 3969.00 0
2018-06-14 Multi-Stage Fracture 3913.20 3913.30 0
2018-06-14 Multi-Stage Fracture 3871.50 3871.60 0
2018-06-14 Multi-Stage Fracture 3815.90 3816.00 0
2018-06-14 Multi-Stage Fracture 3774.00 3774.10 0
2018-06-14 Multi-Stage Fracture 3717.40 3717.50 0
2018-06-14 Multi-Stage Fracture 3674.50 3674.60 0
2018-06-14 Multi-Stage Fracture 3620.90 3621.00 0
2018-06-14 Multi-Stage Fracture 3578.60 3578.70 0
2018-06-11 Multi-Stage Fracture 4831.00 4831.10 0
2018-06-14 Multi-Stage Fracture 3522.30 3522.40 0
2018-06-14 Multi-Stage Fracture 3479.70 3479.80 0
2018-06-14 Multi-Stage Fracture 3424.50 3424.60 0
2018-06-14 Multi-Stage Fracture 3381.60 3381.70 0
2018-06-16 Multi-Stage Fracture 3326.00 3326.10 0
2018-06-16 Multi-Stage Fracture 3271.20 3271.30 0
2018-06-16 Multi-Stage Fracture 3214.80 3214.90 0
2018-06-16 Multi-Stage Fracture 3161.60 3161.70 0
2018-06-16 Multi-Stage Fracture 3106.50 3106.60 0
2018-06-16 Multi-Stage Fracture 3052.10 3052.20 0
2018-06-11 Multi-Stage Fracture 4788.30 4788.40 0
2018-06-16 Multi-Stage Fracture 2987.90 2988.00 0
2018-06-16 Multi-Stage Fracture 2942.20 2942.30 0
2018-06-16 Multi-Stage Fracture 2884.00 2884.10 0
2018-06-16 Multi-Stage Fracture 2838.80 2838.90 0
2018-06-16 Multi-Stage Fracture 2780.40 2780.50 0
2018-06-16 Multi-Stage Fracture 2735.20 2735.30 0
2018-06-17 Multi-Stage Fracture 2676.90 2677.00 0
2018-06-17 Multi-Stage Fracture 2631.30 2631.40 0
2018-06-17 Multi-Stage Fracture 2573.30 2573.40 0
2018-06-17 Multi-Stage Fracture 2527.60 2527.70 0
2018-06-12 Multi-Stage Fracture 4746.50 4746.60 0
2018-06-12 Multi-Stage Fracture 4690.70 4690.80 0
2018-06-12 Multi-Stage Fracture 4648.20 4648.30 0
2018-06-12 Multi-Stage Fracture 4592.20 4592.30 0
2018-06-12 Multi-Stage Fracture 4549.80 4549.90 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-06-11 2018-06-17 2,176 23,215 N/A
2 2018-06-13 2018-06-16 2,176 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 88.7168 N/A
CRC-C 30/50 Trican phenolic resin 9003-35-4 100 0.9118 N/A
silica crystalline 14808-60-7 100 0.9118 N/A
Sand - Tier 2 (40/70) Trican silica crystalline 14808-60-7 100 2.6206 N/A
Sand 30/50 Trican silica crystalline 14808-60-7 100 8.9665 N/A
AQUCAR DB20 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0105 N/A
dibromoacetonitrile 3252-43-5 100 0.0105 N/A
non-hazardous ingredients Not Available 100 0.0105 N/A
polyethylene glycol 25322-68-3 100 0.0105 N/A
sodium bromide 7647-15-6 100 0.0105 N/A
CC-7 Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.0568 N/A
water Not Available 100 0.0568 N/A
FR-23 Trican Friction Reducer acrylamide modified polymer 9972 100 0.0564 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.0564 N/A
non-hazardous ingredients Not Available 100 0.0564 N/A
SI-18 Trican Scale Inhibitor non-hazardous ingredients Not Available 100 0.0259 N/A
S-17X Trican Surfactant 1-hexanol. 2-ethyl-. manuf. of.
by-products from. distn. residues
68609-68-7 100 0.0432 N/A
benzenesulfonic acid. dodecyl-. compd. with 2-aminoethanol 26836-07-7 100 0.0432 N/A
methanol 67-56-1 100 0.0432 N/A
methyloxirane polymer with oxirane 11/6/9003 100 0.0432 N/A
non-hazardous ingredients Not Available 100 0.0432 N/A
2 FR-22 Trican Friction Reducer alcohols. C10-16. ethoxylated 68002-97-1 100 0.006 N/A
distillates (petroleum). hydrotreated light naphthenic 64742-53-6 100 0.006 N/A
non-hazardous ingredients Not Available 100 0.006 N/A

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-06-11 2018-06-14 Surface Water - Runoff 8978
2018-06-11 2018-06-14 Surface Water - Runoff 4982
2018-06-07 2018-07-16 Surface Water - Runoff 4623
2018-06-14 2018-06-16 Surface Water - Runoff 3536

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 4267 0.0 0.0 0.0
2019 4221 0.0 0.0 0.0
2020 99 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-05-25 No Incident Encountered 0.00 0.00
2018-06-28 No Incident Encountered 0.00 0.00

For data sources see[9]

References