X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0544052906002

Well Details

Well ID: 0544052906002
Loading map...
Location: 00/06-29-054-05W4/2
Location Alias: 00/06-29-54-05 W4M
Location Alias 2: 00/06-29-054-05 W4/02
Country: Canada
Province: Alberta
Township: 054
Meridian: 4
Range: 05
Section: 29
County/Municipality: County of Vermilion River
Well Name: ESSO IRISH 6-29-54-5
Operator Name: Lightstream Resources Ltd.
License Number: 0046506
License Date: 1973-07-12
License Status: RecCertified
Spud Date: 1973-07-25
Final Drill Date: 1973-07-28
Well Total Depth: 602.90 m
Surface Hole Latitude: 53.690379
Surface Hole Longitude: -110.711268

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1973-07-12 Obtained License
1973-07-27 Drill Stem Test Performed
1973-07-28 Drill Stem Test Performed
1973-07-28 Finished Drilling
1973-07-30 Production Casing Operation Performed
1974-01-10 Perforation Treatment Performed - Jet Perforation
1979-03-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1979-03-10 Perforation Treatment Performed - Jet Perforation
1979-03-10 Well Mode changed to Drilled and Cased
1979-03-11 Perforation Treatment Performed - Jet Perforation
1980-10-01 Well Began Production
1980-10-01 Well Fluid changed to Gas
1980-10-01 Well Mode changed to Flowing
1982-04-16 Well Fluid changed to Gas
1982-04-16 Well Mode changed to Suspended
1986-12-19 Perforation Treatment Performed - Cement Plug
1986-12-19 Plug Back Performed
1986-12-20 Perforation Treatment Performed - Jet Perforation
1986-12-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1986-12-21 Plug Back Performed
1986-12-21 Well Abandoned
1986-12-21 Well Fluid changed to Gas
1986-12-21 Well Log Performed
1986-12-21 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1974-01-10 Perforation 586.40 589.50 13
1974-01-10 Perforation 590.70 591.60 13
1979-03-10 Packing Device Capped w/Cement 582.00 582.00 0
1979-03-10 Perforation 570.60 571.80 10
1979-03-11 Perforation 570.60 571.80 10
1986-12-19 Cement Plug 570.60 571.80 0
1986-12-20 Perforation 407.20 409.00 13
1986-12-21 Packing Device Capped w/Cement 396.00 404.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 1947 0.0 0.0 0.0
1981 2123 0.0 0.0 0.0
1982 91 0.0 0.0 0.0

For data sources see[5]

References