X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0084082306002

Well Details

Well ID: 0084082306002
Loading map...
Location: 00/06-23-008-08W4/2
Location Alias: 00/06-23-08-08 W4M
Location Alias 2: 00/06-23-008-08 W4/02
Country: Canada
Province: Alberta
Township: 008
Meridian: 4
Range: 08
Section: 23
County/Municipality: County of Forty Mile No. 8
Well Name: AVALON MEDHAT 6-23-8-8
Operator Name: Jaguar Resources Inc.
License Number: 0063309
License Date: 1977-03-24
License Status: Abandoned
Spud Date: 1977-03-30
Final Drill Date: 1977-04-05
Well Total Depth: 964.70 m
Surface Hole Latitude: 49.662037
Surface Hole Longitude: -110.990338

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-03-24 Obtained License
1977-04-05 Finished Drilling
1977-04-05 Kick Occurred
1977-04-07 Production Casing Operation Performed
1977-04-20 Perforation Treatment Performed - Jet Perforation
1977-04-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-06-21 Perforation Treatment Performed - Cement Squeeze
1980-07-02 Well Log Performed
1980-07-03 Perforation Treatment Performed - Jet Perforation
1980-07-30 Well Mode changed to Drilled and Cased
1991-12-01 Well Began Production
1991-12-01 Well Fluid changed to Gas
1991-12-01 Well Mode changed to Flowing
2001-03-01 Well Fluid changed to Gas
2001-03-01 Well Mode changed to Suspended
2004-11-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-11-27 Plug Back Performed
2004-11-27 Well Fluid changed to Gas
2004-11-27 Well Mode changed to Abandoned Zone
2004-12-01 Well Abandoned
2004-12-01 Well Fluid changed to Gas
2004-12-01 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1977-04-20 Perforation 908.30 910.10 7
1977-04-20 Perforation 912.00 912.60 7
1977-04-21 Acid Treatment 908.30 912.60 0
1980-06-21 Cement Squeeze 908.30 912.60 0
1980-07-03 Perforation 931.50 933.30 13
2004-11-27 Packing Device Capped w/Cement 912.00 920.00 0
2004-11-27 Packing Device Capped w/Cement 897.00 905.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1991 440 0.0 0.0 0.0
1992 7955 0.0 0.0 0.0
1993 3328 0.0 0.0 0.0
1994 304 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1977-04-05 Kick 936.00 936.00

For data sources see[6]

References