X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0084150901000

Well Details

Well ID: 0084150901000
Loading map...
Location: 00/01-09-008-15W4/0
Location Alias: 00/01-09-08-15 W4M
Location Alias 2: 00/01-09-008-15 W4/00
Country: Canada
Province: Alberta
Township: 008
Meridian: 4
Range: 15
Section: 09
County/Municipality: Municipal District of Taber
Well Name: ARROW POINT TABERSE 1-9-8-15
Operator Name: Taber Water Disposal Inc.
License Number: 0049988
License Date: 1974-06-04
License Status: Issued
Spud Date: 1974-06-05
Final Drill Date: 1974-06-09
Well Total Depth: 1005.80 m
Surface Hole Latitude: 49.628522
Surface Hole Longitude: -111.973325

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1974-06-04 Obtained License
1974-06-09 Finished Drilling
1974-06-09 Well Mode changed to Drilled and Cased
1974-06-10 Drill Stem Test Performed
1974-06-11 Production Casing Operation Performed
1974-06-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-06-21 Perforation Treatment Performed - Jet Perforation
1974-06-22 Perforation Treatment Performed - Fractured
1974-06-30 Well Began Production
1974-06-30 Well Fluid changed to Crude Oil
1974-06-30 Well Mode changed to Pumping
1990-10-24 Perforation Treatment Performed - Jet Perforation
1993-06-15 Well Fluid changed to Crude Oil
1993-06-15 Well Mode changed to Closed
1993-06-22 Well Fluid changed to Crude Oil
1993-06-22 Well Mode changed to Pumping
1997-11-01 Well Fluid changed to Crude Oil
1997-11-01 Well Mode changed to Suspended
2002-12-06 Well Fluid changed to Crude Oil
2002-12-06 Well Mode changed to Pumping
2017-11-01 Well Fluid changed to Crude Oil
2017-11-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1974-06-21 Perforation 968.70 971.10 7
1974-06-21 Acid Treatment 968.70 971.10 0
1974-06-22 Fracture 968.70 971.10 0
1990-10-24 Perforation 964.80 969.80 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1974 2591 0.0 0.0 0.0
1975 6264 0.0 0.0 0.0
1976 7352 0.0 0.0 0.0
1977 6494 0.0 0.0 0.0
1978 6504 0.0 0.0 0.0
1979 5352 0.0 0.0 0.0
1980 7056 0.0 0.0 0.0
1981 8567 0.0 0.0 0.0
1982 8075 0.0 0.0 0.0
1983 8159 0.0 0.0 0.0
1984 5040 0.0 0.0 0.0
1985 3552 0.0 0.0 0.0
1986 6799 0.0 0.0 0.0
1987 7976 0.0 0.0 0.0
1988 8172 0.0 0.0 0.0
1989 8468 0.0 0.0 0.0
1990 8001 0.0 0.0 0.0
1991 8430 0.0 0.0 0.0
1992 7788 0.0 0.0 0.0
1993 8512 0.0 0.0 0.0
1994 8112 0.0 0.0 0.0
1995 8759 0.0 0.0 0.0
1996 8783 0.0 0.0 0.0
1997 5592 0.0 0.0 0.0
2002 620 0.0 0.0 0.0
2003 8057 0.0 0.0 0.0
2004 8335 0.0 0.0 0.0
2005 8175 0.0 0.0 0.0
2006 8186 0.0 0.0 0.0
2007 7572 0.0 0.0 0.0
2008 7576 0.0 0.0 0.0
2009 7412 0.0 0.0 0.0
2010 6029 0.0 0.0 0.0
2011 6514 0.0 0.0 0.0
2012 7174 0.0 0.0 0.0
2013 8032 0.0 0.0 0.0
2014 8075 0.0 0.0 0.0
2015 8351 0.0 0.0 0.0
2016 2400 0.0 0.0 0.0

For data sources see[5]

References