X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0094172108000

Well Details

Well ID: 0094172108000
Loading map...
Location: 00/08-21-009-17W4/0
Location Alias: 00/08-21-09-17 W4M
Location Alias 2: 00/08-21-009-17 W4/00
Country: Canada
Province: Alberta
Township: 009
Meridian: 4
Range: 17
Section: 21
County/Municipality: Municipal District of Taber
Well Name: NEOMAR ET AL TABER 8-21-9-17
Operator Name: Marathon Canada Limited
License Number: 0100587
License Date: 1983-02-14
License Status: RecCertified
Spud Date: 1983-05-16
Final Drill Date: 1983-05-22
Well Total Depth: 1026.00 m
Surface Hole Latitude: 49.747889
Surface Hole Longitude: -112.243209

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1983-02-14 Obtained License
1983-05-22 Drill Stem Test Performed
1983-05-22 Finished Drilling
1983-05-22 Well Mode changed to Drilled and Cased
1983-05-23 Drill Stem Test Performed
1983-05-24 Production Casing Operation Performed
1983-06-27 Perforation Treatment Performed - Acid Wash - No Pressure
1983-06-27 Perforation Treatment Performed - Cement Squeeze
1983-06-27 Perforation Treatment Performed - Jet Perforation
1983-06-29 Perforation Treatment Performed - Jet Perforation
1983-06-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-06-30 Perforation Treatment Performed - Chemical Squeeze
1983-07-06 Well Began Production
1983-07-06 Well Fluid changed to Crude Oil
1983-07-06 Well Mode changed to Pumping
1984-11-01 Well Fluid changed to Crude Oil
1984-11-01 Well Mode changed to Suspended
1987-07-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1987-07-07 Plug Back Performed
1987-07-07 Well Abandoned
1987-07-07 Well Fluid changed to Crude Oil
1987-07-07 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1983-06-27 Perforation 395.00 396.00 7
1983-06-27 Acid Wash 395.00 396.00 0
1983-06-27 Cement Squeeze 395.00 396.00 0
1983-06-29 Perforation 976.00 977.00 13
1983-06-30 Acid Treatment 976.00 977.00 0
1983-06-30 Chemical Squeeze 976.00 977.00 0
1987-07-07 Packing Device Capped w/Cement 962.00 970.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1983 3342 0.0 0.0 0.0
1984 264 0.0 0.0 0.0

For data sources see[5]

References