If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0094172108000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.747889,"lon":-112.243209,"icon":""}]} |
Location: 00/08-21-009-17W4/0 | |
Location Alias: 00/08-21-09-17 W4M | |
Location Alias 2: 00/08-21-009-17 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 009 | |
Meridian: 4 | |
Range: 17 | |
Section: 21 | |
County/Municipality: Municipal District of Taber | |
Well Name: NEOMAR ET AL TABER 8-21-9-17 | |
Operator Name: Marathon Canada Limited | |
License Number: 0100587 | |
License Date: 1983-02-14 | |
License Status: RecCertified | |
Spud Date: 1983-05-16 | |
Final Drill Date: 1983-05-22 | |
Well Total Depth: 1026.00 m | |
Surface Hole Latitude: 49.747889 | |
Surface Hole Longitude: -112.243209 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1983-02-14 | Obtained License |
1983-05-22 | Drill Stem Test Performed |
1983-05-22 | Finished Drilling |
1983-05-22 | Well Mode changed to Drilled and Cased |
1983-05-23 | Drill Stem Test Performed |
1983-05-24 | Production Casing Operation Performed |
1983-06-27 | Perforation Treatment Performed - Acid Wash - No Pressure |
1983-06-27 | Perforation Treatment Performed - Cement Squeeze |
1983-06-27 | Perforation Treatment Performed - Jet Perforation |
1983-06-29 | Perforation Treatment Performed - Jet Perforation |
1983-06-30 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1983-06-30 | Perforation Treatment Performed - Chemical Squeeze |
1983-07-06 | Well Began Production |
1983-07-06 | Well Fluid changed to Crude Oil |
1983-07-06 | Well Mode changed to Pumping |
1984-11-01 | Well Fluid changed to Crude Oil |
1984-11-01 | Well Mode changed to Suspended |
1987-07-07 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1987-07-07 | Plug Back Performed |
1987-07-07 | Well Abandoned |
1987-07-07 | Well Fluid changed to Crude Oil |
1987-07-07 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1983-06-27 | Perforation | 395.00 | 396.00 | 7 |
1983-06-27 | Acid Wash | 395.00 | 396.00 | 0 |
1983-06-27 | Cement Squeeze | 395.00 | 396.00 | 0 |
1983-06-29 | Perforation | 976.00 | 977.00 | 13 |
1983-06-30 | Acid Treatment | 976.00 | 977.00 | 0 |
1983-06-30 | Chemical Squeeze | 976.00 | 977.00 | 0 |
1987-07-07 | Packing Device Capped w/Cement | 962.00 | 970.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1983 | 3342 | 0.0 | 0.0 | 0.0 |
1984 | 264 | 0.0 | 0.0 | 0.0 |
For data sources see[5]