If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0464192507002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.993578,"lon":-112.624086,"icon":""}]} |
Location: 00/07-25-046-19W4/2 | |
Location Alias: 00/07-25-46-19 W4M | |
Location Alias 2: 00/07-25-046-19 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 046 | |
Meridian: 4 | |
Range: 19 | |
Section: 25 | |
County/Municipality: Camrose County | |
Well Name: RANGER ET AL BAWLF 7-25-46-19 | |
Operator Name: Postell Energy Co. Ltd. | |
License Number: 0058827 | |
License Date: 1976-06-21 | |
License Status: Re-Entered | |
Spud Date: 1976-07-02 | |
Final Drill Date: 1976-07-08 | |
Well Total Depth: 1173.50 m | |
Surface Hole Latitude: 52.993578 | |
Surface Hole Longitude: -112.624086 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1976-06-21 | Obtained License |
1976-07-08 | Finished Drilling |
1976-07-08 | Well Mode changed to Drilled and Cased |
1976-07-09 | Drill Stem Test Performed |
1976-07-10 | Drill Stem Test Performed |
1976-07-11 | Production Casing Operation Performed |
1981-07-29 | Perforation Treatment Performed - Jet Perforation |
1986-11-17 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1988-06-25 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1988-06-25 | Perforation Treatment Performed - Jet Perforation |
1988-06-25 | Plug Back Performed |
1988-06-28 | Well Began Production |
1988-06-28 | Well Fluid changed to Gas |
1988-06-28 | Well Mode changed to Flowing |
1997-06-17 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1997-06-17 | Plug Back Performed |
1997-06-24 | Well Abandoned |
1997-06-24 | Well Fluid changed to Gas |
1997-06-24 | Well Mode changed to Abandoned and Re-entered |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1981-07-29 | Perforation | 1109.50 | 1110.90 | 13 |
1986-11-17 | Acid Treatment | 1109.50 | 1110.90 | 0 |
1988-06-25 | Packing Device Capped w/Cement | 1104.00 | 1107.00 | 0 |
1988-06-25 | Perforation | 1088.10 | 1089.40 | 13 |
1997-06-17 | Packing Device Capped w/Cement | 1067.00 | 1075.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1988 | 1757 | 0.0 | 0.0 | 0.0 |
1990 | 1 | 0.0 | 0.0 | 0.0 |
For data sources see[5]