If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0384242816002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.299975,"lon":-113.366846,"icon":""}]} |
Location: 00/16-28-038-24W4/2 | |
Location Alias: 00/16-28-38-24 W4M | |
Location Alias 2: 00/16-28-038-24 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 038 | |
Meridian: 4 | |
Range: 24 | |
Section: 28 | |
County/Municipality: Lacombe County | |
Well Name: 981384 HAYNES 16-28-38-24 | |
Operator Name: Trident Exploration (Alberta) Corp. | |
License Number: 0144292 | |
License Date: 1990-05-29 | |
License Status: Abandoned | |
Spud Date: 1990-06-19 | |
Final Drill Date: 1990-06-29 | |
Well Total Depth: 1930.00 m | |
Surface Hole Latitude: 52.299975 | |
Surface Hole Longitude: -113.366846 |
Date | Event |
---|---|
1990-05-29 | Obtained License |
1990-06-21 | Surface Casing Operation Performed |
1990-06-29 | Finished Drilling |
1990-06-29 | Well Mode changed to Drilled and Cased |
1990-06-30 | Drill Stem Test Performed |
1990-06-30 | Well Log Performed |
1990-07-02 | Lost Circulation Occurred |
1990-07-02 | Production Casing Operation Performed |
1990-07-02 | Rig Released |
1990-07-19 | Perforation Treatment Performed - Jet Perforation |
1990-07-19 | Well Log Performed |
1990-07-29 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1990-07-31 | Perforation Treatment Performed - Jet Perforation |
1990-08-02 | Perforation Treatment Performed - Acid Wash - No Pressure |
1990-09-10 | Perforation Treatment Performed - Cement Squeeze |
1990-09-11 | Perforation Treatment Performed - Jet Perforation |
1990-09-11 | Well Log Performed |
1990-09-15 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1990-11-26 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1991-03-01 | Well Began Production |
1991-03-01 | Well Fluid changed to Crude Oil |
1991-03-01 | Well Mode changed to Pumping |
1991-03-27 | Perforation Treatment Performed - Jet Perforation |
1991-05-26 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1991-09-23 | Well Log Performed |
1991-09-24 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1991-09-24 | Perforation Treatment Performed - Cement Squeeze |
1991-09-24 | Plug Back Performed |
1991-09-24 | Well Fluid changed to Crude Oil |
1991-09-24 | Well Mode changed to Pumping |
1997-02-21 | Well Fluid changed to Crude Oil |
1997-02-21 | Well Mode changed to Abandoned Zone |
1997-02-27 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1997-02-27 | Plug Back Performed |
1997-02-28 | Well Abandoned |
1997-02-28 | Well Fluid changed to Crude Oil |
1997-02-28 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1990-07-19 | Perforation | 1896.10 | 1897.60 | 13 |
1991-05-26 | Acid Treatment | 1868.00 | 1897.60 | 0 |
1991-09-24 | Acid Treatment | 1868.00 | 1871.50 | 0 |
1991-09-24 | Cement Squeeze | 1868.00 | 1871.50 | 0 |
1997-02-27 | Packing Device Capped w/Cement | 372.00 | 380.00 | 0 |
1990-07-29 | Packing Device Capped w/Cement | 1885.00 | 1893.00 | 0 |
1990-07-31 | Perforation | 1875.00 | 1876.50 | 13 |
1990-08-02 | Acid Wash | 1875.00 | 1876.50 | 0 |
1990-09-10 | Cement Squeeze | 1875.00 | 1876.50 | 0 |
1990-09-11 | Perforation | 1868.00 | 1871.50 | 14 |
1990-09-15 | Acid Treatment | 1868.00 | 1871.50 | 0 |
1990-11-26 | Acid Treatment | 1868.00 | 1871.50 | 0 |
1991-03-27 | Perforation | 1896.10 | 1897.60 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1991 | 4028 | 0.0 | 0.0 | 0.0 |
1992 | 6862 | 0.0 | 0.0 | 0.0 |
1993 | 7827 | 0.0 | 0.0 | 0.0 |
1994 | 8108 | 0.0 | 0.0 | 0.0 |
1995 | 6154 | 0.0 | 0.0 | 0.0 |
1996 | 7340 | 0.0 | 0.0 | 0.0 |
1997 | 661 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1990-07-02 | Lost Circulation | 1930.00 | 1930.00 |
For data sources see[6]