If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0124182815002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.030022,"lon":-112.406869,"icon":""}]} |
Location: 00/15-28-012-18W4/2 | |
Location Alias: 00/15-28-12-18 W4M | |
Location Alias 2: 00/15-28-012-18 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 012 | |
Meridian: 4 | |
Range: 18 | |
Section: 28 | |
County/Municipality: Municipal District of Taber | |
Well Name: WOLF COUL RES RETLAW 15-28-12-18 | |
Operator Name: Wolf Coulee Resources Inc. | |
License Number: 0395535 | |
License Date: 2008-03-24 | |
License Status: Suspension | |
Spud Date: 2008-04-01 | |
Final Drill Date: 2008-04-04 | |
Well Total Depth: 1325.00 m | |
Surface Hole Latitude: 50.030022 | |
Surface Hole Longitude: -112.406869 |
Date | Event |
---|---|
2008-03-24 | Obtained License |
2008-04-01 | Direction Drilling Operation Performed - Deviate |
2008-04-02 | Surface Casing Operation Performed |
2008-04-04 | Finished Drilling |
2008-04-04 | Well Mode changed to Drilled and Cased |
2008-04-06 | Well Log Performed |
2008-04-07 | Drill Stem Test Performed |
2008-04-08 | Production Casing Operation Performed |
2008-04-08 | Rig Released |
2008-04-17 | Perforation Treatment Performed - Jet Perforation |
2008-04-19 | Perforation Treatment Performed - Jet Perforation |
2008-04-22 | Perforation Treatment Performed - Fractured |
2008-05-27 | Well Began Production |
2008-05-27 | Well Fluid changed to Gas |
2008-05-27 | Well Mode changed to Flowing |
2008-09-17 | Perforation Treatment Performed - Fractured |
2008-11-05 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2008-11-05 | Plug Back Performed |
2008-11-06 | Perforation Treatment Performed - Jet Perforation |
2008-11-10 | Perforation Treatment Performed - Fractured |
2009-02-28 | Well Fluid changed to Gas |
2009-02-28 | Well Mode changed to Suspended |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2008-04-01 | 30.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2008-04-17 | Perforation | 1235.00 | 1244.00 | 17 |
2008-04-19 | Perforation | 1120.00 | 1122.00 | 17 |
2008-04-22 | Fracture | 1120.00 | 1122.00 | 0 |
2008-09-17 | Fracture | 1235.00 | 1244.00 | 0 |
2008-11-05 | Packing Device Capped w/Cement | 1225.00 | 1233.00 | 0 |
2008-11-06 | Perforation | 1212.00 | 1214.00 | 13 |
2008-11-10 | Fracture | 1212.00 | 1214.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2008 | 2722 | 0.0 | 0.0 | 0.0 |
For data sources see[6]