If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0775120912000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.658032,"lon":-115.811378,"icon":""}]} |
Location: 00/12-09-077-12W5/0 | |
Location Alias: 00/12-09-77-12 W5M | |
Location Alias 2: 00/12-09-077-12 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 077 | |
Meridian: 5 | |
Range: 12 | |
Section: 09 | |
County/Municipality: Big Lakes County | |
Well Name: BEAR RIDGE LHORSE 12-9-77-12 | |
Operator Name: Cequence Energy Ltd. | |
License Number: 0165596 | |
License Date: 1994-03-03 | |
License Status: Abandoned | |
Spud Date: 1994-03-14 | |
Final Drill Date: 1994-04-03 | |
Well Total Depth: 2107.00 m | |
Surface Hole Latitude: 55.658032 | |
Surface Hole Longitude: -115.811378 |
Date | Event |
---|---|
1994-03-03 | Obtained License |
1994-03-14 | Well Log Performed |
1994-03-15 | Surface Casing Operation Performed |
1994-04-03 | Finished Drilling |
1994-04-03 | Well Log Performed |
1994-04-03 | Well Mode changed to Drilled and Cased |
1994-04-04 | Drill Stem Test Performed |
1994-04-06 | Drill Stem Test Performed |
1994-04-06 | Well Log Performed |
1994-04-07 | Drill Stem Test Performed |
1994-04-08 | Production Casing Operation Performed |
1994-04-08 | Rig Released |
1994-04-08 | Well Log Performed |
1994-05-27 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1994-05-27 | Perforation Treatment Performed - Jet Perforation |
1994-05-29 | Well Log Performed |
1994-06-06 | Well Began Production |
1994-06-06 | Well Fluid changed to Crude Oil |
1994-06-06 | Well Mode changed to Pumping |
2001-04-17 | Well Fluid changed to Crude Oil |
2001-04-17 | Well Mode changed to Suspended |
2004-06-04 | Plug Back Performed |
2004-06-04 | Well Fluid changed to Crude Oil |
2004-06-04 | Well Mode changed to Abandoned Zone |
2004-06-17 | Well Abandoned |
2004-06-17 | Well Fluid changed to Crude Oil |
2004-06-17 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1994-05-27 | Perforation | 2054.00 | 2056.00 | 13 |
1994-05-27 | Packing Device Capped w/Cement | 2032.00 | 2040.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1994 | 4534 | 0.0 | 0.0 | 0.0 |
1995 | 8333 | 0.0 | 0.0 | 0.0 |
1996 | 5824 | 0.0 | 0.0 | 0.0 |
1997 | 3785 | 0.0 | 0.0 | 0.0 |
1998 | 5917 | 0.0 | 0.0 | 0.0 |
1999 | 723 | 0.0 | 0.0 | 0.0 |
2000 | 2058 | 0.0 | 0.0 | 0.0 |
2001 | 2232 | 0.0 | 0.0 | 0.0 |
For data sources see[5]