If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0394081212000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.341915,"lon":-111.032369,"icon":""}]} |
Location: 00/12-12-039-08W4/0 | |
Location Alias: 00/12-12-39-08 W4M | |
Location Alias 2: 00/12-12-039-08 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 039 | |
Meridian: 4 | |
Range: 08 | |
Section: 12 | |
County/Municipality: Municipal District of Provost No. 52 | |
Well Name: CLEO ENERGY PROVOST 12-12-39-8 | |
Operator Name: Cleo Energy Corp. | |
License Number: 0183763 | |
License Date: 1995-12-19 | |
License Status: Issued | |
Spud Date: 1996-02-09 | |
Final Drill Date: 1996-02-13 | |
Well Total Depth: 977.00 m | |
Surface Hole Latitude: 52.341915 | |
Surface Hole Longitude: -111.032369 |
Date | Event |
---|---|
1995-12-19 | Obtained License |
1996-02-09 | Well Log Performed |
1996-02-10 | Surface Casing Operation Performed |
1996-02-11 | Direction Drilling Operation Performed - Deviate |
1996-02-13 | Finished Drilling |
1996-02-13 | Well Log Performed |
1996-02-13 | Well Mode changed to Drilled and Cased |
1996-02-14 | Production Casing Operation Performed |
1996-02-14 | Rig Released |
1996-02-23 | Well Log Performed |
1996-02-24 | Perforation Treatment Performed - Jet Perforation |
1996-02-24 | Well Log Performed |
1996-02-26 | Perforation Treatment Performed - Fractured |
1996-05-06 | Well Began Production |
1996-05-06 | Well Fluid changed to Crude Oil |
1996-05-06 | Well Mode changed to Pumping |
1996-11-24 | Well Log Performed |
1996-11-26 | Perforation Treatment Performed - Cement Squeeze |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1996-02-11 | 490.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1996-02-24 | Perforation | 907.60 | 910.40 | 13 |
1996-02-24 | Perforation | 915.20 | 916.20 | 13 |
1996-02-24 | Perforation | 917.80 | 922.50 | 13 |
1996-02-26 | Fracture | 907.60 | 922.50 | 0 |
1996-11-26 | Cement Squeeze | 907.60 | 910.40 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1996 | 3250 | 0.0 | 0.0 | 0.0 |
1997 | 4948 | 0.0 | 0.0 | 0.0 |
1998 | 8656 | 0.0 | 0.0 | 0.0 |
1999 | 8482 | 0.0 | 0.0 | 0.0 |
2000 | 8700 | 0.0 | 0.0 | 0.0 |
2001 | 8560 | 0.0 | 0.0 | 0.0 |
2002 | 8274 | 0.0 | 0.0 | 0.0 |
2003 | 8696 | 0.0 | 0.0 | 0.0 |
2004 | 8602 | 0.0 | 0.0 | 0.0 |
2005 | 8462 | 0.0 | 0.0 | 0.0 |
2006 | 8714 | 0.0 | 0.0 | 0.0 |
2007 | 8606 | 0.0 | 0.0 | 0.0 |
2008 | 5739 | 0.0 | 0.0 | 0.0 |
2009 | 8452 | 0.0 | 0.0 | 0.0 |
2011 | 8149 | 0.0 | 0.0 | 0.0 |
2012 | 8715 | 0.0 | 0.0 | 0.0 |
2013 | 8239 | 0.0 | 0.0 | 0.0 |
2014 | 8300 | 0.0 | 0.0 | 0.0 |
2015 | 8444 | 0.0 | 0.0 | 0.0 |
2016 | 7795 | 0.0 | 0.0 | 0.0 |
2017 | 8627 | 0.0 | 0.0 | 0.0 |
2018 | 8697 | 0.0 | 0.0 | 0.0 |
2019 | 8702 | 0.0 | 0.0 | 0.0 |
2020 | 2177 | 0.0 | 0.0 | 0.0 |
For data sources see[6]