If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0484012910000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.171714,"lon":-110.112584,"icon":""}]} |
Location: 00/10-29-048-01W4/0 | |
Location Alias: 00/10-29-48-01 W4M | |
Location Alias 2: 00/10-29-048-01 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 048 | |
Meridian: 4 | |
Range: 01 | |
Section: 29 | |
County/Municipality: County of Vermilion River | |
Well Name: CREW LLOYD 10-29-48-1 | |
Operator Name: Crew Energy Inc. | |
License Number: 0292398 | |
License Date: 2003-09-05 | |
License Status: Suspension | |
Spud Date: 2003-09-23 | |
Final Drill Date: 2003-09-25 | |
Well Total Depth: 639.50 m | |
Surface Hole Latitude: 53.171714 | |
Surface Hole Longitude: -110.112584 |
Date | Event |
---|---|
2003-09-05 | Obtained License |
2003-09-24 | Surface Casing Operation Performed |
2003-09-25 | Finished Drilling |
2003-09-25 | Well Log Performed |
2003-09-25 | Well Mode changed to Drilled and Cased |
2003-09-26 | Production Casing Operation Performed |
2003-09-26 | Rig Released |
2003-10-16 | Perforation Treatment Performed - Jet Perforation |
2003-10-17 | Well Log Performed |
2003-10-28 | Well Began Production |
2003-10-28 | Well Fluid changed to Crude Oil |
2003-10-28 | Well Mode changed to Pumping |
2005-01-24 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2005-01-24 | Perforation Treatment Performed - Jet Perforation |
2005-01-24 | Plug Back Performed |
2005-01-26 | Well Log Performed |
2007-08-09 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2007-08-09 | Plug Back Performed |
2007-08-09 | Well Fluid changed to Crude Oil |
2007-08-09 | Well Mode changed to Abandoned Zone |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2003-10-16 | Perforation | 605.00 | 611.00 | 13 |
2005-01-24 | Packing Device Capped w/Cement | 589.00 | 598.50 | 0 |
2005-01-24 | Perforation | 563.50 | 566.00 | 26 |
2007-08-09 | Packing Device Capped w/Cement | 589.00 | 597.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2003 | 1464 | 0.0 | 0.0 | 0.0 |
2004 | 6918 | 0.0 | 0.0 | 0.0 |
2007 | 4723 | 0.0 | 0.0 | 0.0 |
For data sources see[5]