X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0785241814000

Well Details

Well ID: 0785241814000
Loading map...
Location: 00/14-18-078-24W5/0
Location Alias: 00/14-18-78-24 W5M
Location Alias 2: 00/14-18-078-24 W5/00
Country: Canada
Province: Alberta
Township: 078
Meridian: 5
Range: 24
Section: 18
County/Municipality: Birch Hills County
Well Name: CNRL ET AL CULP 14-18-78-24
Operator Name: Canadian Natural Resources Limited
License Number: 0147503
License Date: 1991-01-21
License Status: Suspension
Spud Date: 1991-01-25
Final Drill Date: 1991-02-06
Well Total Depth: 2039.00 m
Surface Hole Latitude: 55.763997
Surface Hole Longitude: -117.718341

For data sources see[1][2]

Well History

Date Event
1991-01-21 Obtained License
1991-01-27 Surface Casing Operation Performed
1991-02-01 Well Log Performed
1991-02-05 Well Log Performed
1991-02-06 Finished Drilling
1991-02-06 Well Log Performed
1991-02-09 Production Casing Operation Performed
1991-02-09 Rig Released
1991-02-09 Well Mode changed to Drilled and Cased
1991-02-16 Perforation Treatment Performed - Jet Perforation
1991-02-16 Well Log Performed
1991-02-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-02-19 Perforation Treatment Performed - Jet Perforation
1991-02-19 Well Log Performed
1991-02-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-02-21 Well Log Performed
1991-02-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-02-22 Perforation Treatment Performed - Cement Squeeze
1991-02-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-02-23 Perforation Treatment Performed - Jet Perforation
1991-02-23 Well Log Performed
1991-02-25 Perforation Treatment Performed - Jet Perforation
1991-02-25 Well Log Performed
1991-02-26 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-11-22 Well Log Performed
2001-12-03 Well Began Production
2001-12-03 Well Fluid changed to Gas
2001-12-03 Well Mode changed to Flowing
2002-06-06 Perforation Treatment Performed - Jet Perforation
2002-06-06 Well Log Performed
2002-06-09 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-01-01 Well Fluid changed to Gas
2003-01-01 Well Mode changed to Pumping
2006-12-14 Well Fluid changed to Gas
2006-12-14 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1991-02-16 Perforation 1978.00 1982.00 14
1991-02-26 Acid Treatment 1921.00 1925.00 0
2002-06-06 Perforation 1911.00 1919.00 17
2002-06-09 Acid Treatment 1911.00 1919.00 0
1991-02-17 Acid Treatment 1978.00 1982.00 0
1991-02-19 Perforation 1972.00 1975.00 13
1991-02-20 Acid Treatment 1972.00 1975.00 0
1991-02-22 Cement Squeeze 1972.00 1975.00 0
1991-02-22 Packing Device Capped w/Cement 1970.80 1976.00 0
1991-02-23 Perforation 1961.00 1964.00 13
1991-02-23 Acid Treatment 1961.00 1964.00 0
1991-02-25 Perforation 1921.00 1925.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2001 592 0.0 0.0 0.0
2002 1901 0.0 0.0 0.0
2003 4203 0.0 0.0 0.0
2004 1542 0.0 0.0 0.0

For data sources see[5]

References