If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0134181409003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.083992,"lon":-112.352049,"icon":""}]} |
Location: 00/09-14-013-18W4/3 | |
Location Alias: 00/09-14-13-18 W4M | |
Location Alias 2: 00/09-14-013-18 W4/03 | |
Country: Canada | |
Province: Alberta | |
Township: 013 | |
Meridian: 4 | |
Range: 18 | |
Section: 14 | |
County/Municipality: Municipal District of Taber | |
Well Name: PAI RETLAW 9-14-13-18 | |
Operator Name: Wolf Coulee Resources Inc. | |
License Number: 0193063 | |
License Date: 1996-11-04 | |
License Status: Suspension | |
Spud Date: 1996-11-12 | |
Final Drill Date: 1996-11-18 | |
Well Total Depth: 1185.00 m | |
Surface Hole Latitude: 50.083992 | |
Surface Hole Longitude: -112.352049 |
Date | Event |
---|---|
1996-11-04 | Obtained License |
1996-11-13 | Surface Casing Operation Performed |
1996-11-14 | Direction Drilling Operation Performed - Deviate |
1996-11-18 | Finished Drilling |
1996-11-18 | Kick Occurred |
1996-11-18 | Well Log Performed |
1996-11-18 | Well Mode changed to Drilled and Cased |
1996-11-19 | Drill Stem Test Performed |
1996-11-20 | Drill Stem Test Performed |
1996-11-21 | Production Casing Operation Performed |
1996-11-21 | Rig Released |
1996-11-26 | Perforation Treatment Performed - Jet Perforation |
2005-11-15 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2005-11-15 | Perforation Treatment Performed - Jet Perforation |
2005-11-15 | Well Log Performed |
2006-09-28 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2006-09-29 | Perforation Treatment Performed - Jet Perforation |
2006-09-30 | Perforation Treatment Performed - Fractured |
2007-07-27 | Perforation Treatment Performed - Jet Perforation |
2007-07-31 | Perforation Treatment Performed - Cement Squeeze |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1996-11-14 | 578.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1996-11-26 | Perforation | 1084.30 | 1086.00 | 13 |
2007-07-27 | Perforation | 862.50 | 863.50 | 17 |
2007-07-31 | Cement Squeeze | 862.50 | 863.50 | 0 |
1996-11-26 | Perforation | 1114.70 | 1115.50 | 13 |
1996-11-26 | Perforation | 1120.00 | 1122.00 | 13 |
2005-11-15 | Packing Device Capped w/Cement | 1099.00 | 1107.00 | 0 |
2005-11-15 | Perforation | 1087.00 | 1089.00 | 17 |
2006-09-28 | Packing Device Capped w/Cement | 1073.00 | 1081.00 | 0 |
2006-09-29 | Perforation | 1068.00 | 1069.00 | 17 |
2006-09-29 | Perforation | 1065.00 | 1067.00 | 17 |
2006-09-30 | Fracture | 1065.00 | 1069.00 | 0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1996-11-18 | Kick | 1185.00 | 1185.00 |
For data sources see[6]