If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0786091315000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.738179,"lon":-119.25313,"icon":""}]} |
Location: 00/15-13-078-09W6/0 | |
Location Alias: 00/15-13-78-09 W6M | |
Location Alias 2: 00/15-13-078-09 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 078 | |
Meridian: 6 | |
Range: 09 | |
Section: 13 | |
County/Municipality: Saddle Hills County | |
Well Name: KELT EXP HZ PROGRESS 15-13-78-9 | |
Operator Name: Kelt Exploration Ltd. | |
License Number: 0470642 | |
License Date: 2014-10-15 | |
License Status: Amended | |
Spud Date: 2014-10-21 | |
Final Drill Date: 2014-11-09 | |
Well Total Depth: 4842.00 m | |
Surface Hole Latitude: 55.738179 | |
Surface Hole Longitude: -119.253130 |
Date | Event |
---|---|
2014-10-15 | Obtained License |
2014-10-25 | Surface Casing Operation Performed |
2014-10-28 | Direction Drilling Operation Performed - Deviate |
2014-10-30 | Direction Drilling Operation Performed - Horizontal |
2014-10-31 | Well Log Performed |
2014-11-09 | Finished Drilling |
2014-11-09 | Well Log Performed |
2014-11-09 | Well Mode changed to Drilled and Cased |
2014-11-10 | Well Log Performed |
2014-11-13 | Perforation Treatment Performed - Open-Hole Completion |
2014-11-13 | Production Casing Operation Performed |
2014-11-13 | Rig Released |
2014-11-24 | Well Log Performed |
2014-12-03 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-12-04 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-12-05 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-12-06 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-12-07 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-12-08 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-12-14 | Well Log Performed |
2015-01-06 | Well Began Production |
2015-01-06 | Well Fluid changed to Crude Oil |
2015-01-06 | Well Mode changed to Flowing |
2018-08-01 | Well Fluid changed to Crude Oil |
2018-08-01 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2014-10-21 | Beaver Drilling Ltd. | 8 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2014-10-28 | 1633.80 | Deviate (5 - 79 degrees) |
2014-10-30 | 2064.90 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2014-11-13 | Open Hole/Barefoot Completion | 4841.00 | 4842.00 | 0 |
2014-12-05 | Multi-Stage Fracture | 4333.90 | 4334.70 | 0 |
2014-12-05 | Multi-Stage Fracture | 4259.00 | 4259.80 | 0 |
2014-12-05 | Multi-Stage Fracture | 4195.90 | 4196.80 | 0 |
2014-12-05 | Multi-Stage Fracture | 4132.70 | 4133.50 | 0 |
2014-12-05 | Multi-Stage Fracture | 4069.40 | 4070.30 | 0 |
2014-12-05 | Multi-Stage Fracture | 4006.20 | 4007.00 | 0 |
2014-12-06 | Multi-Stage Fracture | 3942.90 | 3943.80 | 0 |
2014-12-06 | Multi-Stage Fracture | 3879.70 | 3880.50 | 0 |
2014-12-06 | Multi-Stage Fracture | 3804.80 | 3805.60 | 0 |
2014-12-06 | Multi-Stage Fracture | 3741.50 | 3742.30 | 0 |
2014-12-03 | Multi-Stage Fracture | 4807.50 | 4808.80 | 0 |
2014-12-06 | Multi-Stage Fracture | 3667.40 | 3668.30 | 0 |
2014-12-06 | Multi-Stage Fracture | 3593.00 | 3593.80 | 0 |
2014-12-06 | Multi-Stage Fracture | 3530.80 | 3531.60 | 0 |
2014-12-06 | Multi-Stage Fracture | 3456.50 | 3457.40 | 0 |
2014-12-06 | Multi-Stage Fracture | 3393.60 | 3394.40 | 0 |
2014-12-06 | Multi-Stage Fracture | 3331.40 | 3332.20 | 0 |
2014-12-06 | Multi-Stage Fracture | 3257.00 | 3257.80 | 0 |
2014-12-06 | Multi-Stage Fracture | 3194.70 | 3195.60 | 0 |
2014-12-06 | Multi-Stage Fracture | 3120.50 | 3121.30 | 0 |
2014-12-07 | Multi-Stage Fracture | 3057.30 | 3058.10 | 0 |
2014-12-03 | Multi-Stage Fracture | 4764.80 | 4765.60 | 0 |
2014-12-07 | Multi-Stage Fracture | 2994.30 | 2995.10 | 0 |
2014-12-07 | Multi-Stage Fracture | 2931.10 | 2931.90 | 0 |
2014-12-07 | Multi-Stage Fracture | 2856.20 | 2857.00 | 0 |
2014-12-07 | Multi-Stage Fracture | 2793.00 | 2793.80 | 0 |
2014-12-07 | Multi-Stage Fracture | 2729.70 | 2730.60 | 0 |
2014-12-08 | Multi-Stage Fracture | 2654.80 | 2655.60 | 0 |
2014-12-08 | Multi-Stage Fracture | 2591.50 | 2592.40 | 0 |
2014-12-08 | Multi-Stage Fracture | 2528.50 | 2529.30 | 0 |
2014-12-08 | Multi-Stage Fracture | 2457.20 | 2458.00 | 0 |
2014-12-08 | Multi-Stage Fracture | 2380.40 | 2381.30 | 0 |
2014-12-04 | Multi-Stage Fracture | 4724.90 | 4725.70 | 0 |
2014-12-08 | Multi-Stage Fracture | 2303.10 | 2304.00 | 0 |
2014-12-08 | Multi-Stage Fracture | 2239.70 | 2240.60 | 0 |
2014-12-08 | Multi-Stage Fracture | 2162.30 | 2163.20 | 0 |
2014-12-08 | Multi-Stage Fracture | 2098.80 | 2099.70 | 0 |
2014-12-04 | Multi-Stage Fracture | 4673.30 | 4674.20 | 0 |
2014-12-04 | Multi-Stage Fracture | 4598.40 | 4599.20 | 0 |
2014-12-04 | Multi-Stage Fracture | 4535.30 | 4536.10 | 0 |
2014-12-04 | Multi-Stage Fracture | 4460.30 | 4461.20 | 0 |
2014-12-05 | Multi-Stage Fracture | 4397.10 | 4397.90 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2014-12-03 | 2014-12-08 | 1,953 | 11,204 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Not Available | 100 | 78.3089 | N/A | |||
Prime Plus (30/50) | Canyon | No specific ingredients | Not Available | 100 | 1.9981 | N/A | ||
Sand (30/50) Ottawa | Canyon | Aluminum Oxide | 1344-28-1 | 100 | 9.1511 | N/A | ||
Crystalline silica. quartz | 14808-60-7 | 100 | 9.1511 | N/A | ||||
Iron Oxide | 1309-37-1 | 100 | 9.1511 | N/A | ||||
Titanium Oxide | 13463-67-7 | 100 | 9.151 | N/A | ||||
Sand (40/70) Ottawa | Canyon | Aluminum Oxide | 1344-28-1 | 100 | 4.5755 | N/A | ||
Crystalline silica. quartz | 14808-60-7 | 100 | 4.5755 | N/A | ||||
Iron Oxide | 1309-37-1 | 100 | 4.5755 | N/A | ||||
Titanium Oxide | 13463-67-7 | 100 | 4.5755 | N/A | ||||
Tolcide PS75LT | Canyon | Bactericide/Biocide | Tetrakis (Hydroxymethyl) Phosphonium Sulfate | 55566-30-8 | 100 | 0.014 | N/A | |
Water | 7732-18-5 | 100 | 0.014 | N/A | ||||
CAN-1912 Clay Stabilizer (HT) | Canyon | Clay Control | No hazardous ingredients | Not Available | 100 | 0.058 | N/A | |
CAN-2411 Non-emulsifier | Canyon | Demulsifier | Ethylene glycol | 107-21-1 | 100 | 0.0444 | N/A | |
Isopropanol | 67-63-0 | 100 | 0.0444 | N/A | ||||
Water | 7732-18-5 | 100 | 0.0444 | N/A | ||||
Nitrogen Gas | Canyon | Energizing Fluid | Nitrogen | 7727-37-9 | 100 | 5.8063 | N/A | |
Non-hazardous base ingredient(s) | Not Available | 100 | 5.8063 | N/A | ||||
CAN-2057 Friction Reducer | Canyon | Gelling Agent | No hazardous ingredients | Not Available | 100 | 0.0432 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2014-12-03 | 2014-12-08 | Surface Water - Runoff | 2700 |
2014-12-03 | 2014-12-08 | Surface Water - Runoff | 8316 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2015 | 407 | 0.0 | 0.0 | 0.0 |
2016 | 6096 | 0.0 | 0.0 | 0.0 |
2017 | 7105 | 0.0 | 0.0 | 0.0 |
2018 | 4725 | 0.0 | 0.0 | 0.0 |
2019 | 7254 | 0.0 | 0.0 | 0.0 |
2020 | 884 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2014-11-14 | No Incident Encountered | 0.00 | 0.00 |
2014-12-14 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]