If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0786110913000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.738307,"lon":-119.631246,"icon":""}]} |
Location: 00/13-09-078-11W6/0 | |
Location Alias: 00/13-09-78-11 W6M | |
Location Alias 2: 00/13-09-078-11 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 078 | |
Meridian: 6 | |
Range: 11 | |
Section: 09 | |
County/Municipality: Saddle Hills County | |
Well Name: KELT EXP PCOUPES 13-9-78-11 | |
Operator Name: Kelt Exploration Ltd. | |
License Number: 0443516 | |
License Date: 2012-01-30 | |
License Status: Issued | |
Spud Date: 2012-02-17 | |
Final Drill Date: 2012-03-15 | |
Well Total Depth: 4020.00 m | |
Surface Hole Latitude: 55.738307 | |
Surface Hole Longitude: -119.631246 |
Date | Event |
---|---|
2012-01-30 | Obtained License |
2012-02-20 | Surface Casing Operation Performed |
2012-02-21 | Well Log Performed |
2012-02-26 | Direction Drilling Operation Performed - Deviate |
2012-03-06 | Direction Drilling Operation Performed - Horizontal |
2012-03-06 | Well Log Performed |
2012-03-15 | Finished Drilling |
2012-03-15 | Well Log Performed |
2012-03-15 | Well Mode changed to Drilled and Cased |
2012-03-18 | Intermediate Casing Operation Performed |
2012-03-18 | Liner Casing Operation Performed |
2012-03-19 | Rig Released |
2012-06-14 | Well Log Performed |
2012-06-25 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-06-25 | Perforation Treatment Performed - Open-Hole Completion |
2012-06-26 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-06-27 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-07-01 | Well Began Production |
2012-07-01 | Well Fluid changed to Crude Oil |
2012-07-01 | Well Mode changed to Flowing |
2018-02-01 | Well Fluid changed to Crude Oil |
2018-02-01 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-02-17 | Excalibur Drilling Ltd. | 6 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-02-26 | 1945.00 | Deviate (5 - 79 degrees) |
2012-03-06 | 2308.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-06-25 | Open Hole/Barefoot Completion | 4015.00 | 4020.00 | 0 |
2012-06-26 | Multi-Stage Fracture | 3478.40 | 3478.50 | 0 |
2012-06-26 | Multi-Stage Fracture | 3451.30 | 3451.40 | 0 |
2012-06-26 | Multi-Stage Fracture | 3405.40 | 3405.50 | 0 |
2012-06-26 | Multi-Stage Fracture | 3378.30 | 3378.40 | 0 |
2012-06-26 | Multi-Stage Fracture | 3333.40 | 3333.50 | 0 |
2012-06-26 | Multi-Stage Fracture | 3306.20 | 3306.30 | 0 |
2012-06-26 | Multi-Stage Fracture | 3260.30 | 3260.40 | 0 |
2012-06-26 | Multi-Stage Fracture | 3233.20 | 3233.30 | 0 |
2012-06-26 | Multi-Stage Fracture | 3174.90 | 3175.00 | 0 |
2012-06-26 | Multi-Stage Fracture | 3147.80 | 3147.90 | 0 |
2012-06-25 | Multi-Stage Fracture | 3976.70 | 3976.80 | 0 |
2012-06-26 | Multi-Stage Fracture | 3088.60 | 3088.70 | 0 |
2012-06-26 | Multi-Stage Fracture | 3016.50 | 3016.60 | 0 |
2012-06-27 | Multi-Stage Fracture | 2944.40 | 2944.50 | 0 |
2012-06-27 | Multi-Stage Fracture | 2872.20 | 2872.30 | 0 |
2012-06-27 | Multi-Stage Fracture | 2800.10 | 2800.20 | 0 |
2012-06-27 | Multi-Stage Fracture | 2714.60 | 2714.70 | 0 |
2012-06-27 | Multi-Stage Fracture | 2642.40 | 2642.50 | 0 |
2012-06-27 | Multi-Stage Fracture | 2568.50 | 2568.60 | 0 |
2012-06-27 | Multi-Stage Fracture | 2494.60 | 2494.70 | 0 |
2012-06-27 | Multi-Stage Fracture | 2420.70 | 2420.80 | 0 |
2012-06-25 | Multi-Stage Fracture | 3911.20 | 3911.30 | 0 |
2012-06-25 | Multi-Stage Fracture | 3839.00 | 3839.10 | 0 |
2012-06-25 | Multi-Stage Fracture | 3753.50 | 3753.60 | 0 |
2012-06-25 | Multi-Stage Fracture | 3681.40 | 3681.50 | 0 |
2012-06-25 | Multi-Stage Fracture | 3609.20 | 3609.30 | 0 |
2012-06-25 | Multi-Stage Fracture | 3550.40 | 3550.50 | 0 |
2012-06-25 | Multi-Stage Fracture | 3523.30 | 3523.40 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 3709 | 0.0 | 0.0 | 0.0 |
2013 | 6910 | 0.0 | 0.0 | 0.0 |
2014 | 6137 | 0.0 | 0.0 | 0.0 |
2015 | 8424 | 0.0 | 0.0 | 0.0 |
2016 | 8581 | 0.0 | 0.0 | 0.0 |
2017 | 4722 | 0.0 | 0.0 | 0.0 |
2018 | 4851 | 0.0 | 0.0 | 0.0 |
2019 | 7998 | 0.0 | 0.0 | 0.0 |
2020 | 2177 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-03-19 | No Incident Encountered | 0.00 | 0.00 |
2012-08-06 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]