If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0786111808002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.736718,"lon":-119.687952,"icon":""}]} |
Location: 00/08-18-078-11W6/2 | |
Location Alias: 00/08-18-78-11 W6M | |
Location Alias 2: 00/08-18-078-11 W6/02 | |
Country: Canada | |
Province: Alberta | |
Township: 078 | |
Meridian: 6 | |
Range: 11 | |
Section: 18 | |
County/Municipality: Saddle Hills County | |
Well Name: KELT EXP PCOUPES 8-18-78-11 | |
Operator Name: Kelt Exploration Ltd. | |
License Number: 0476323 | |
License Date: 2015-07-24 | |
License Status: Amended | |
Spud Date: 2015-08-25 | |
Final Drill Date: 2015-09-18 | |
Well Total Depth: 4639.00 m | |
Surface Hole Latitude: 55.736718 | |
Surface Hole Longitude: -119.687952 |
Date | Event |
---|---|
2015-07-24 | Obtained License |
2015-08-03 | Intermediate Casing Operation Performed |
2015-08-26 | Surface Casing Operation Performed |
2015-08-30 | Direction Drilling Operation Performed - Deviate |
2015-09-03 | Direction Drilling Operation Performed - Horizontal |
2015-09-10 | Direction Drilling Operation Performed - Horizontal |
2015-09-17 | Well Log Performed |
2015-09-18 | Finished Drilling |
2015-09-18 | Well Mode changed to Drilled and Cased |
2015-09-19 | Liner Casing Operation Performed |
2015-09-19 | Production Casing Operation Performed |
2015-09-20 | Perforation Treatment Performed - Open-Hole Completion |
2015-09-20 | Rig Released |
2015-10-30 | Perforation Treatment Performed - Multi-Stage Fracture |
2015-10-31 | Perforation Treatment Performed - Multi-Stage Fracture |
2015-11-19 | Well Began Production |
2015-11-19 | Well Fluid changed to Crude Oil |
2015-11-19 | Well Mode changed to Flowing |
2018-07-01 | Well Fluid changed to Crude Oil |
2018-07-01 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2015-08-30 | 1884.90 | Deviate (5 - 79 degrees) |
2015-09-03 | 2371.10 | Horizontal |
2015-09-10 | 2507.60 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2015-09-20 | Open Hole/Barefoot Completion | 4634.00 | 4639.00 | 0 |
2015-10-30 | Multi-Stage Fracture | 4177.60 | 4178.40 | 0 |
2015-10-31 | Multi-Stage Fracture | 4122.30 | 4123.10 | 0 |
2015-10-31 | Multi-Stage Fracture | 4067.30 | 4068.10 | 0 |
2015-10-31 | Multi-Stage Fracture | 3999.50 | 4000.30 | 0 |
2015-10-31 | Multi-Stage Fracture | 3944.20 | 3945.00 | 0 |
2015-10-31 | Multi-Stage Fracture | 3889.50 | 3890.30 | 0 |
2015-10-31 | Multi-Stage Fracture | 3834.00 | 3834.80 | 0 |
2015-10-31 | Multi-Stage Fracture | 3778.70 | 3779.50 | 0 |
2015-10-31 | Multi-Stage Fracture | 3710.70 | 3711.50 | 0 |
2015-10-31 | Multi-Stage Fracture | 3655.60 | 3656.20 | 0 |
2015-10-30 | Multi-Stage Fracture | 4612.70 | 4614.00 | 0 |
2015-10-31 | Multi-Stage Fracture | 3600.00 | 3600.80 | 0 |
2015-10-31 | Multi-Stage Fracture | 3544.70 | 3545.50 | 0 |
2015-10-31 | Multi-Stage Fracture | 3476.60 | 3477.40 | 0 |
2015-10-31 | Multi-Stage Fracture | 3421.80 | 3422.60 | 0 |
2015-10-31 | Multi-Stage Fracture | 3367.60 | 3368.20 | 0 |
2015-10-31 | Multi-Stage Fracture | 3312.30 | 3313.10 | 0 |
2015-10-31 | Multi-Stage Fracture | 3257.10 | 3257.90 | 0 |
2015-10-31 | Multi-Stage Fracture | 3202.00 | 3202.80 | 0 |
2015-10-31 | Multi-Stage Fracture | 3134.10 | 3134.90 | 0 |
2015-10-31 | Multi-Stage Fracture | 3078.70 | 3079.50 | 0 |
2015-10-30 | Multi-Stage Fracture | 4551.50 | 4552.30 | 0 |
2015-10-31 | Multi-Stage Fracture | 3023.60 | 3024.20 | 0 |
2015-10-31 | Multi-Stage Fracture | 2968.00 | 2968.80 | 0 |
2015-10-31 | Multi-Stage Fracture | 2913.00 | 2913.80 | 0 |
2015-10-31 | Multi-Stage Fracture | 2845.00 | 2845.80 | 0 |
2015-10-31 | Multi-Stage Fracture | 2789.70 | 2790.50 | 0 |
2015-10-31 | Multi-Stage Fracture | 2734.30 | 2735.10 | 0 |
2015-10-31 | Multi-Stage Fracture | 2679.00 | 2679.80 | 0 |
2015-10-31 | Multi-Stage Fracture | 2623.70 | 2624.50 | 0 |
2015-10-31 | Multi-Stage Fracture | 2450.80 | 2451.60 | 0 |
2015-10-30 | Multi-Stage Fracture | 4496.20 | 4497.00 | 0 |
2015-10-30 | Multi-Stage Fracture | 4441.60 | 4442.20 | 0 |
2015-10-30 | Multi-Stage Fracture | 4386.10 | 4386.90 | 0 |
2015-10-30 | Multi-Stage Fracture | 4343.50 | 4344.30 | 0 |
2015-10-30 | Multi-Stage Fracture | 4288.10 | 4288.90 | 0 |
2015-10-30 | Multi-Stage Fracture | 4232.80 | 4233.60 | 0 |
For data sources see[5]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2015-10-30 | 2015-10-31 | 2,248 | 11,749 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Not Available | 100 | 89.0531 | N/A | |||
Prime Plus (30/50) | Canyon Technical Services | No specific ingredients | Not Available | 100 | 1.4599 | N/A | ||
Sand (30/50) Ottawa | Canyon Technical Services | Aluminum Oxide | 1344-28-1 | 100 | 5.8976 | N/A | ||
Crystalline silica. quartz | 14808-60-7 | 100 | 5.8976 | N/A | ||||
Iron Oxide | 1309-37-1 | 100 | 5.8976 | N/A | ||||
Titanium Oxide | 13463-67-7 | 100 | 5.8977 | N/A | ||||
Sand (40/70) Ottawa | Canyon Technical Services | Aluminum Oxide | 1344-28-1 | 100 | 3.4258 | N/A | ||
Crystalline silica. quartz | 14808-60-7 | 100 | 3.4258 | N/A | ||||
Iron Oxide | 1309-37-1 | 100 | 3.4258 | N/A | ||||
Titanium Oxide | 13463-67-7 | 100 | 3.4258 | N/A | ||||
Tolcide PS75LT | Canyon Technical Services | Bactericide/Biocide | Tetrakis (Hydroxymethyl) Phosphonium Sulfate | 55566-30-8 | 100 | 0.0125 | N/A | |
Water | 7732-18-5 | 100 | 0.0125 | N/A | ||||
CAN-1912 Clay Stabilizer (HT) | Canyon Technical Services | Clay Control | No hazardous ingredients | Not Available | 100 | 0.0588 | N/A | |
CAN-2411 Non-emulsifier | Canyon Technical Services | Demulsifier | Ethylene glycol | 107-21-1 | 100 | 0.044 | N/A | |
Isopropanol | 67-63-0 | 100 | 0.044 | N/A | ||||
Water | 7732-18-5 | 100 | 0.044 | N/A | ||||
CAN-2057 Friction Reducer | Canyon Technical Services | Gelling Agent | No hazardous ingredients | Not Available | 100 | 0.0478 | N/A |
For data sources see[6]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2015-10-30 | 2015-10-31 | Surface Water - Runoff | 3000 |
2015-10-30 | 2015-10-31 | Surface Water - Runoff | 6243 |
2015-10-30 | 2015-10-31 | Surface Water - Runoff | 2500 |
For data sources see[7]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2015 | 78 | 0.0 | 0.0 | 0.0 |
2016 | 2343 | 0.0 | 0.0 | 0.0 |
2017 | 7482 | 0.0 | 0.0 | 0.0 |
2018 | 4885 | 0.0 | 0.0 | 0.0 |
2019 | 5073 | 0.0 | 0.0 | 0.0 |
2020 | 1273 | 0.0 | 0.0 | 0.0 |
For data sources see[8]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2015-09-20 | No Incident Encountered | 0.00 | 0.00 |
2015-11-19 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[9]