X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0395041903000

Well Details

Well ID: 0395041903000
Loading map...
Location: 00/03-19-039-04W5/0
Location Alias: 00/03-19-39-04 W5M
Location Alias 2: 00/03-19-039-04 W5/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 5
Range: 04
Section: 19
County/Municipality: Clearwater County
Well Name: PSEC MEDRIV 3-19-39-4
Operator Name: Prairie Storm Energy Corp.
License Number: 0073163
License Date: 1978-11-24
License Status: Suspension
Spud Date: 1978-12-09
Final Drill Date: 1978-12-26
Well Total Depth: 2333.00 m
Surface Hole Latitude: 52.365628
Surface Hole Longitude: -114.570920

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1978-11-24 Obtained License
1978-12-26 Finished Drilling
1978-12-26 Well Log Performed
1978-12-26 Well Mode changed to Drilled and Cased
1978-12-28 Drill Stem Test Performed
1978-12-29 Production Casing Operation Performed
1979-01-25 Perforation Treatment Performed - Fractured
1979-01-25 Perforation Treatment Performed - Jet Perforation
1979-02-02 Well Began Production
1979-02-02 Well Fluid changed to Crude Oil
1979-02-02 Well Mode changed to Flowing
1979-12-19 Well Fluid changed to Crude Oil
1979-12-19 Well Mode changed to Pumping
1989-03-09 Perforation Treatment Performed - Acid Squeeze - Press Used
2006-12-11 Well Fluid changed to Crude Oil
2006-12-11 Well Mode changed to Suspended
2019-03-22 Perforation Treatment Performed - Jet Perforation
2019-03-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-03-24 Perforation Treatment Performed - Cement Squeeze
2019-03-24 Plug Back Performed
2019-03-24 Well Fluid changed to Crude Oil
2019-03-24 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-01-25 Perforation 2215.00 2217.50 13
1979-01-25 Fracture 2215.00 2217.50 0
1989-03-09 Acid Treatment 2215.00 2217.50 0
2019-03-22 Perforation 2210.00 2212.00 17
2019-03-24 Cement Squeeze 2215.00 2217.50 0
2019-03-24 Cement Squeeze 2210.00 2212.00 0
2019-03-24 Packing Device Capped w/Cement 2185.00 2198.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1979 6552 0.0 0.0 0.0
1980 8671 0.0 0.0 0.0
1981 8134 0.0 0.0 0.0
1982 8229 0.0 0.0 0.0
1983 8453 0.0 0.0 0.0
1984 7906 0.0 0.0 0.0
1985 7735 0.0 0.0 0.0
1986 7433 0.0 0.0 0.0
1987 8114 0.0 0.0 0.0
1988 8420 0.0 0.0 0.0
1989 7475 0.0 0.0 0.0
1990 8204 0.0 0.0 0.0
1991 8334 0.0 0.0 0.0
1992 8663 0.0 0.0 0.0
1993 7256 0.0 0.0 0.0
1994 6150 0.0 0.0 0.0
1995 4510 0.0 0.0 0.0
1996 4418 0.0 0.0 0.0
1997 2328 0.0 0.0 0.0
1998 1896 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-03-26 No Incident Encountered 0.00 0.00

For data sources see[6]

References