X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404012611D20

Well Details

Well ID: 0404012611D20
Loading map...
Location: D2/11-26-040-01W4/0
Location Alias: D2/11-26-40-01 W4M
Location Alias 2: D2/11-26-040-01 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 01
Section: 26
County/Municipality: Municipal District of Provost No. 52
Well Name: FCE ET AL 11D2 HZL HAYTER 11-26-40-1
Operator Name: Rife Resources Ltd.
License Number: 0200317
License Date: 1997-04-15
License Status: Abandoned
Spud Date: 1997-05-01
Final Drill Date: 1997-05-23
Well Total Depth: 1121.00 m
Surface Hole Latitude: 52.472903
Surface Hole Longitude: -110.035387

For data sources see[1][2]

Well History

Date Event
1997-04-15 Obtained License
1997-05-01 Surface Casing Operation Performed
1997-05-22 Direction Drilling Operation Performed - Horizontal
1997-05-23 Finished Drilling
1997-05-23 Well Log Performed
1997-05-23 Well Mode changed to Drilled and Cased
1997-05-24 Production Casing Operation Performed
1997-05-24 Rig Released
1997-05-29 Well Log Performed
1997-06-05 Perforation Treatment Performed - Slotted Liner or Casing
1997-06-05 Well Log Performed
1997-06-14 Well Began Production
1997-06-14 Well Fluid changed to Crude Oil
1997-06-14 Well Mode changed to Pumping
2017-10-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-10-26 Plug Back Performed
2017-10-26 Well Fluid changed to Crude Oil
2017-10-26 Well Mode changed to Abandoned Zone
2017-11-21 Well Abandoned
2017-11-21 Well Fluid changed to Crude Oil
2017-11-21 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1997-05-22 590.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-06-05 Slotted Liner 870.60 1121.00 0
2017-10-26 Packing Device Capped w/Cement 227.00 630.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 4352 0.0 0.0 0.0
1998 8068 0.0 0.0 0.0
1999 7743 0.0 0.0 0.0
2000 7390 0.0 0.0 0.0
2001 7603 0.0 0.0 0.0
2002 7300 0.0 0.0 0.0
2003 6799 0.0 0.0 0.0
2004 7896 0.0 0.0 0.0
2005 5701 0.0 0.0 0.0
2006 7437 0.0 0.0 0.0
2007 7931 0.0 0.0 0.0
2008 8351 0.0 0.0 0.0
2009 8243 0.0 0.0 0.0
2010 8268 0.0 0.0 0.0
2011 7382 0.0 0.0 0.0
2012 8340 0.0 0.0 0.0
2013 8532 0.0 0.0 0.0
2014 8060 0.0 0.0 0.0
2015 8165 0.0 0.0 0.0
2016 8552 0.0 0.0 0.0
2017 2871 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-11-21 No Incident Encountered 0.00 0.00

For data sources see[7]

References