X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404012816D20

Well Details

Well ID: 0404012816D20
Loading map...
Location: D2/16-28-040-01W4/0
Location Alias: D2/16-28-40-01 W4M
Location Alias 2: D2/16-28-040-01 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 01
Section: 28
County/Municipality: Municipal District of Provost No. 52
Well Name: FCPI 16D2 HAYTER 16-28-40-1
Operator Name: Rife Resources Ltd.
License Number: 0169479
License Date: 1994-08-12
License Status: Abandoned
Spud Date: 1994-08-21
Final Drill Date: 1994-08-24
Well Total Depth: 840.00 m
Surface Hole Latitude: 52.475754
Surface Hole Longitude: -110.080282

For data sources see[1][2]

Well History

Date Event
1994-08-12 Obtained License
1994-08-22 Surface Casing Operation Performed
1994-08-23 Direction Drilling Operation Performed - Deviate
1994-08-24 Finished Drilling
1994-08-24 Well Log Performed
1994-08-24 Well Mode changed to Drilled and Cased
1994-08-25 Production Casing Operation Performed
1994-08-25 Rig Released
1994-10-19 Well Log Performed
1995-03-06 Perforation Treatment Performed - Jet Perforation
1995-03-06 Well Log Performed
1995-05-18 Well Began Production
1995-05-18 Well Fluid changed to Crude Oil
1995-05-18 Well Mode changed to Pumping
2003-11-30 Well Fluid changed to Crude Oil
2003-11-30 Well Mode changed to Suspended
2007-02-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-02-27 Plug Back Performed
2007-02-27 Well Fluid changed to Crude Oil
2007-02-27 Well Mode changed to Abandoned Zone
2007-06-15 Well Abandoned
2007-06-15 Well Fluid changed to Crude Oil
2007-06-15 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1994-08-23 370.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-03-06 Perforation 783.00 783.50 13
1995-03-06 Perforation 784.50 785.10 13
1995-03-06 Perforation 785.50 786.50 13
1995-03-06 Perforation 787.00 787.60 13
2007-02-27 Packing Device Capped w/Cement 765.00 775.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 5105 0.0 0.0 0.0
1996 8195 0.0 0.0 0.0
1997 8088 0.0 0.0 0.0
1998 8236 0.0 0.0 0.0
1999 8449 0.0 0.0 0.0
2000 8104 0.0 0.0 0.0
2001 7583 0.0 0.0 0.0
2002 5957 0.0 0.0 0.0

For data sources see[6]

References