X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0484213415000

Well Details

Well ID: 0484213415000
Loading map...
Location: 00/15-34-048-21W4/0
Location Alias: 00/15-34-48-21 W4M
Location Alias 2: 00/15-34-048-21 W4/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 4
Range: 21
Section: 34
County/Municipality: Camrose County
Well Name: CABRE ET AL JOAM 15-34-48-21
Operator Name: Enerplus Corporation
License Number: 0004390
License Date: 1952-03-20
License Status: RecCertified
Spud Date: 1952-03-23
Final Drill Date: 1952-04-02
Well Total Depth: 1001.60 m
Surface Hole Latitude: 53.190527
Surface Hole Longitude: -112.986025

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-03-20 Obtained License
1952-04-02 Finished Drilling
1952-04-02 Production Casing Operation Performed
1952-04-02 Well Mode changed to Drilled and Cased
1952-04-20 Perforation Treatment Performed - Bullet Perforation
1952-04-25 Perforation Treatment Performed - Cement Squeeze
1952-05-01 Perforation Treatment Performed - Bullet Perforation
1952-08-07 Well Began Production
1952-08-07 Well Fluid changed to Crude Oil
1952-08-07 Well Mode changed to Pumping
1960-05-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-05-25 Perforation Treatment Performed - Cement Squeeze
1960-05-28 Perforation Treatment Performed - Bullet Perforation
1960-06-15 Perforation Treatment Performed - Jet Perforation
1976-12-01 Well Fluid changed to Crude Oil
1976-12-01 Well Mode changed to Suspended
1977-10-06 Well Fluid changed to Crude Oil
1977-10-06 Well Mode changed to Pumping
1984-10-10 Perforation Treatment Performed - Jet Perforation
1984-10-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-01-13 Well Fluid changed to Crude Oil
1989-01-13 Well Mode changed to Suspended
1992-06-26 Well Log Performed
1992-07-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-07-26 Perforation Treatment Performed - Jet Perforation
1992-07-26 Perforation Treatment Performed - Remedial Casing
1992-07-26 Plug Back Performed
1992-07-26 Well Fluid changed to Crude Oil
1992-07-26 Well Mode changed to Abandoned
1992-07-31 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-04-20 Bullet Perforation 988.80 990.30 13
1992-07-26 Packing Device Capped w/Cement 967.00 975.00 0
1992-07-26 Perforation 160.00 160.50 7
1992-07-26 Remedial Casing Cementing 160.00 160.50 0
1952-04-25 Cement Squeeze 988.80 990.30 0
1952-05-01 Bullet Perforation 986.30 986.60 13
1960-05-25 Acid Treatment 986.30 986.60 0
1960-05-25 Cement Squeeze 986.30 986.60 0
1960-05-28 Bullet Perforation 987.90 988.80 13
1960-06-15 Perforation 987.20 988.80 13
1984-10-10 Perforation 984.50 987.00 13
1984-10-11 Acid Treatment 984.50 987.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 8239 0.0 0.0 0.0
1968 6287 0.0 0.0 0.0
1969 5112 0.0 0.0 0.0
1970 8327 0.0 0.0 0.0
1971 8279 0.0 0.0 0.0
1972 7559 0.0 0.0 0.0
1973 6792 0.0 0.0 0.0
1974 8087 0.0 0.0 0.0
1975 5778 0.0 0.0 0.0
1976 3833 0.0 0.0 0.0
1977 2034 0.0 0.0 0.0
1978 1544 0.0 0.0 0.0
1981 578 0.0 0.0 0.0
1982 2002 0.0 0.0 0.0
1983 4475 0.0 0.0 0.0
1984 8044 0.0 0.0 0.0
1985 8236 0.0 0.0 0.0
1986 8481 0.0 0.0 0.0
1987 8198 0.0 0.0 0.0
1988 8077 0.0 0.0 0.0
1989 240 0.0 0.0 0.0

For data sources see[5]

References