If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0485021902000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.15067,"lon":-114.279345,"icon":""}]} |
Location: 00/02-19-048-02W5/0 | |
Location Alias: 00/02-19-48-02 W5M | |
Location Alias 2: 00/02-19-048-02 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 048 | |
Meridian: 5 | |
Range: 02 | |
Section: 19 | |
County/Municipality: Leduc County | |
Well Name: WECO PEMBINA 2-19-48-2 | |
Operator Name: Petronas Energy Canada Ltd. | |
License Number: 0098571 | |
License Date: 1982-11-05 | |
License Status: Re-Entered | |
Spud Date: 1982-11-10 | |
Final Drill Date: 1982-11-12 | |
Well Total Depth: 955.00 m | |
Surface Hole Latitude: 53.150670 | |
Surface Hole Longitude: -114.279345 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1982-11-05 | Obtained License |
1982-11-12 | Drill Stem Test Performed |
1982-11-12 | Finished Drilling |
1982-11-12 | Well Log Performed |
1982-11-12 | Well Mode changed to Drilled and Cased |
1982-11-13 | Drill Stem Test Performed |
1982-11-14 | Drill Stem Test Performed |
1982-11-15 | Production Casing Operation Performed |
1982-11-24 | Perforation Treatment Performed - Fractured |
1982-11-24 | Perforation Treatment Performed - Jet Perforation |
1982-12-05 | Well Began Production |
1982-12-05 | Well Fluid changed to Crude Oil |
1982-12-05 | Well Mode changed to Flowing |
1983-05-05 | Well Fluid changed to Crude Oil |
1983-05-05 | Well Mode changed to Suspended |
1983-10-20 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1983-10-20 | Well Abandoned |
1983-10-20 | Well Fluid changed to Crude Oil |
1983-10-20 | Well Mode changed to Abandoned and Re-entered |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1982-11-24 | Perforation | 895.50 | 897.50 | 13 |
1982-11-24 | Fracture | 895.50 | 897.50 | 0 |
1983-10-20 | Packing Device Capped w/Cement | 892.50 | 892.50 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1982 | 624 | 0.0 | 0.0 | 0.0 |
1983 | 752 | 0.0 | 0.0 | 0.0 |
For data sources see[5]