If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0796051004002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.828701,"lon":-118.699081,"icon":""}]} |
| Location: 00/04-10-079-05W6/2 | |
| Location Alias: 00/04-10-79-05 W6M | |
| Location Alias 2: 00/04-10-079-05 W6/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 079 | |
| Meridian: 6 | |
| Range: 05 | |
| Section: 10 | |
| County/Municipality: Municipal District of Spirit River No. 133 | |
| Well Name: CNRL ET AL HOWARD 4-10-79-5 | |
| Operator Name: Canadian Natural Resources Limited | |
| License Number: 0140124 | |
| License Date: 1989-06-13 | |
| License Status: Suspension | |
| Spud Date: 1989-09-02 | |
| Final Drill Date: 1989-10-09 | |
| Well Total Depth: 2372.00 m | |
| Surface Hole Latitude: 55.828701 | |
| Surface Hole Longitude: -118.699081 |
| Date | Event |
|---|---|
| 1989-06-13 | Obtained License |
| 1989-09-04 | Surface Casing Operation Performed |
| 1989-09-06 | Lost Circulation Occurred |
| 1989-09-11 | Drill Stem Test Performed |
| 1989-09-12 | Drill Stem Test Performed |
| 1989-09-14 | Drill Stem Test Performed |
| 1989-09-20 | Well Log Performed |
| 1989-09-28 | Drill Stem Test Performed |
| 1989-09-28 | Well Log Performed |
| 1989-09-30 | Drill Stem Test Performed |
| 1989-10-02 | Intermediate Casing Operation Performed |
| 1989-10-09 | Finished Drilling |
| 1989-10-09 | Well Log Performed |
| 1989-10-09 | Well Mode changed to Drilled and Cased |
| 1989-10-10 | Drill Stem Test Performed |
| 1989-10-10 | Well Log Performed |
| 1989-10-12 | Drill Stem Test Performed |
| 1989-10-12 | Lost Circulation Occurred |
| 1989-10-16 | Liner Casing Operation Performed |
| 1989-10-17 | Rig Released |
| 1989-11-05 | Well Log Performed |
| 1989-11-06 | Perforation Treatment Performed - Jet Perforation |
| 1989-11-06 | Well Log Performed |
| 1989-11-07 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1989-11-18 | Well Log Performed |
| 1989-11-22 | Well Log Performed |
| 1989-11-23 | Well Log Performed |
| 1989-11-24 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1989-11-24 | Perforation Treatment Performed - Jet Perforation |
| 1989-11-24 | Plug Back Performed |
| 2004-03-10 | Perforation Treatment Performed - Cement Squeeze |
| 2004-03-10 | Plug Back Performed |
| 2004-03-16 | Perforation Treatment Performed - Jet Perforation |
| 2005-08-18 | Well Fluid changed to Gas |
| 2005-08-18 | Well Mode changed to Testing |
| 2005-09-02 | Well Began Production |
| 2005-09-02 | Well Fluid changed to Gas |
| 2005-09-02 | Well Mode changed to Flowing |
| 2005-12-02 | Perforation Treatment Performed - Jet Perforation |
| 2005-12-02 | Well Log Performed |
| 2006-01-26 | Well Log Performed |
| 2006-01-27 | Perforation Treatment Performed - Jet Perforation |
| 2006-01-27 | Well Log Performed |
| 2006-01-30 | Perforation Treatment Performed - Fractured |
| 2006-12-01 | Well Fluid changed to Gas |
| 2006-12-01 | Well Mode changed to Suspended |
| 2008-07-20 | Well Fluid changed to Gas |
| 2008-07-20 | Well Mode changed to Flowing |
| 2014-01-16 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2014-01-16 | Plug Back Performed |
| 2014-01-17 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2014-01-17 | Plug Back Performed |
| 2014-01-17 | Well Log Performed |
| 2014-04-30 | Well Fluid changed to Gas |
| 2014-04-30 | Well Mode changed to Suspended |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1989-11-06 | Perforation | 2347.00 | 2351.00 | 13 |
| 2006-01-30 | Fracture | 2259.00 | 2262.00 | 0 |
| 2014-01-16 | Packing Device Capped w/Cement | 2334.00 | 2342.00 | 0 |
| 2014-01-17 | Packing Device Capped w/Cement | 2304.00 | 2312.00 | 0 |
| 2014-01-17 | Packing Device Capped w/Cement | 2242.00 | 2250.00 | 0 |
| 2014-01-17 | Packing Device Capped w/Cement | 2147.00 | 2155.00 | 0 |
| 1989-11-07 | Acid Treatment | 2347.00 | 2351.00 | 0 |
| 1989-11-24 | Packing Device Capped w/Cement | 2334.00 | 2342.00 | 0 |
| 1989-11-24 | Perforation | 2318.50 | 2320.50 | 13 |
| 1989-11-24 | Perforation | 2322.00 | 2327.50 | 13 |
| 2004-03-10 | Cement Squeeze | 2318.50 | 2327.50 | 0 |
| 2004-03-16 | Perforation | 2347.00 | 2351.00 | 13 |
| 2005-12-02 | Perforation | 2347.00 | 2349.00 | 13 |
| 2006-01-27 | Perforation | 2259.00 | 2262.00 | 13 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2005 | 2940 | 0.0 | 0.0 | 0.0 |
| 2006 | 552 | 0.0 | 0.0 | 0.0 |
| 2008 | 2734 | 0.0 | 0.0 | 0.0 |
| 2009 | 2 | 0.0 | 0.0 | 0.0 |
| 2010 | 576 | 0.0 | 0.0 | 0.0 |
| 2011 | 1080 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 1989-09-06 | Lost Circulation | 616.00 | 630.00 |
| 1989-10-12 | Lost Circulation | 2372.00 | 2372.00 |
| 2014-01-19 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]