If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0796071009000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.832059,"lon":-119.025457,"icon":""}]} |
Location: 00/09-10-079-07W6/0 | |
Location Alias: 00/09-10-79-07 W6M | |
Location Alias 2: 00/09-10-079-07 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 079 | |
Meridian: 6 | |
Range: 07 | |
Section: 10 | |
County/Municipality: Saddle Hills County | |
Well Name: R S R MIRAGE 9-10-79-7 | |
Operator Name: Rising Star Resources Ltd. | |
License Number: 0488031 | |
License Date: 2018-02-07 | |
License Status: Issued | |
Spud Date: 2018-02-13 | |
Final Drill Date: 2018-02-23 | |
Well Total Depth: 3007.00 m | |
Surface Hole Latitude: 55.832059 | |
Surface Hole Longitude: -119.025457 |
Date | Event |
---|---|
2018-02-07 | Obtained License |
2018-02-14 | Surface Casing Operation Performed |
2018-02-16 | Direction Drilling Operation Performed - Deviate |
2018-02-17 | Direction Drilling Operation Performed - Horizontal |
2018-02-17 | Well Log Performed |
2018-02-18 | Intermediate Casing Operation Performed |
2018-02-23 | Finished Drilling |
2018-02-23 | Well Log Performed |
2018-02-23 | Well Mode changed to Drilled and Cased |
2018-02-24 | Liner Casing Operation Performed |
2018-02-25 | Rig Released |
2018-02-28 | Well Log Performed |
2018-03-01 | Well Began Production |
2018-03-01 | Well Fluid changed to Crude Oil |
2018-03-01 | Well Mode changed to Pumping |
2018-03-09 | Perforation Treatment Performed - Multi-Stage Fracture |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2018-02-13 | Star Valley Drilling Ltd. | 202 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2018-02-16 | 998.60 | Deviate (5 - 79 degrees) |
2018-02-17 | 1465.50 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2018-03-09 | Multi-Stage Fracture | 2957.00 | 2957.10 | 0 |
2018-03-09 | Multi-Stage Fracture | 2468.70 | 2468.80 | 0 |
2018-03-09 | Multi-Stage Fracture | 2418.90 | 2419.00 | 0 |
2018-03-09 | Multi-Stage Fracture | 2381.40 | 2381.50 | 0 |
2018-03-09 | Multi-Stage Fracture | 2319.40 | 2319.50 | 0 |
2018-03-09 | Multi-Stage Fracture | 2269.70 | 2269.80 | 0 |
2018-03-09 | Multi-Stage Fracture | 2219.80 | 2219.90 | 0 |
2018-03-09 | Multi-Stage Fracture | 2169.90 | 2170.00 | 0 |
2018-03-09 | Multi-Stage Fracture | 2108.10 | 2108.20 | 0 |
2018-03-09 | Multi-Stage Fracture | 2046.70 | 2046.80 | 0 |
2018-03-09 | Multi-Stage Fracture | 1996.90 | 1997.00 | 0 |
2018-03-09 | Multi-Stage Fracture | 2915.30 | 2915.40 | 0 |
2018-03-09 | Multi-Stage Fracture | 1947.60 | 1947.70 | 0 |
2018-03-09 | Multi-Stage Fracture | 1872.80 | 1872.90 | 0 |
2018-03-09 | Multi-Stage Fracture | 1824.00 | 1824.10 | 0 |
2018-03-09 | Multi-Stage Fracture | 1786.10 | 1786.20 | 0 |
2018-03-09 | Multi-Stage Fracture | 1736.50 | 1736.60 | 0 |
2018-03-09 | Multi-Stage Fracture | 1698.50 | 1698.60 | 0 |
2018-03-09 | Multi-Stage Fracture | 1636.30 | 1636.40 | 0 |
2018-03-09 | Multi-Stage Fracture | 1574.20 | 1574.30 | 0 |
2018-03-09 | Multi-Stage Fracture | 1524.20 | 1524.30 | 0 |
2018-03-09 | Multi-Stage Fracture | 2865.30 | 2865.40 | 0 |
2018-03-09 | Multi-Stage Fracture | 2803.20 | 2803.30 | 0 |
2018-03-09 | Multi-Stage Fracture | 2741.30 | 2741.40 | 0 |
2018-03-09 | Multi-Stage Fracture | 2691.70 | 2691.80 | 0 |
2018-03-09 | Multi-Stage Fracture | 2630.20 | 2630.30 | 0 |
2018-03-09 | Multi-Stage Fracture | 2567.80 | 2567.90 | 0 |
2018-03-09 | Multi-Stage Fracture | 2518.50 | 2518.60 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2018-03-09 | 2018-03-09 | 1,326 | 1,765 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Nitrogen | Not Available | 100 | 5.7452 | N/A | |||
Water | 7732-18-5 | 100 | 80.6352 | N/A | ||||
20/40 Import Sand | Step Energy Services | Crystalline Silica | 14808-60-7 | 100 | 7.8918 | N/A | ||
20/40 Yukon Black | Step Energy Services | Quartz (SiO2) | 14808-60-7 | 100 | 5.2471 | N/A | ||
2K7 W-M (Biocide) | Step Energy Services | Bactericide/Biocide | 2-Bromo-2-nitropropane-1.3.-diol (BNPD) | 52-51-7 | 100 | 0.0082 | N/A | |
Methanol | 67-56-1 | 100 | 0.0082 | N/A | ||||
Non-Hazardous Ingredients | Not Available | 100 | 0.0082 | N/A | ||||
SBO-1 (Breaker) | Step Energy Services | Breaker | Disodium peroxydisulfate | 7775-27-1 | 100 | 0.0115 | N/A | |
SCS-8 (Clay Control) | Step Energy Services | Clay Control | Inorganic Salt | Not Available | 100 | 0.1196 | N/A | |
SFR-106 (Friction Reducer) | Step Energy Services | Friction Reducer | Ethoxylated Alcohol | 78330-21-9 | 100 | 0.1817 | N/A | |
Non-Hazardous Ingredients | Not Available | 100 | 0.1817 | N/A | ||||
Petroleum distillates. hydrotreated light | 64742-47-8 | 100 | 0.1817 | N/A | ||||
SNE-2 (Non-Emulsifier) | Step Energy Services | Surfactant | 2-Ethylhexanol distillation residue | 68609-68-7 | 100 | 0.1592 | N/A | |
Dodecylbenzene Sulfonic Acid | 27176-87-0 | 100 | 0.1592 | N/A | ||||
Methanol | 67-56-1 | 100 | 0.1592 | N/A | ||||
Monoethanolamine | 141-43-5 | 100 | 0.1592 | N/A | ||||
Oxirane. methyl-. polymer | 11/6/9003 | 100 | 0.1592 | N/A | ||||
Poly(oxy-1.2-ethanediyl). alphaisotridecyl-omega-hydroxy- | 9043-30-5 | 100 | 0.1592 | N/A | ||||
Water | 7732-18-5 | 100 | 0.1592 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2018-02-28 | 2018-03-03 | Surface Water - Runoff | 2460 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2018 | 4952 | 0.0 | 0.0 | 0.0 |
2019 | 7377 | 0.0 | 0.0 | 0.0 |
2020 | 2150 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2018-02-25 | No Incident Encountered | 0.00 | 0.00 |
2018-02-28 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]