If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0205030109040 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.669024,"lon":-114.279871,"icon":""}]} |
| Location: 04/09-01-020-03W5/0 | |
| Location Alias: 04/09-01-20-03 W5M | |
| Location Alias 2: 04/09-01-020-03 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 020 | |
| Meridian: 5 | |
| Range: 03 | |
| Section: 01 | |
| County/Municipality: Turner Valley | |
| Well Name: CPEC MIDFIELD 104 TV 9-1-20-3 | |
| Operator Name: Crescent Point Energy Corp. | |
| License Number: 0012003 | |
| License Date: 1956-08-27 | |
| License Status: Issued | |
| Spud Date: 1929-03-15 | |
| Final Drill Date: 1930-09-28 | |
| Well Total Depth: 1297.80 m | |
| Surface Hole Latitude: 50.669024 | |
| Surface Hole Longitude: -114.279871 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1929-03-22 | Conductor Casing Operation Performed |
| 1929-05-01 | Surface Casing Operation Performed |
| 1929-06-12 | Intermediate Casing Operation Performed |
| 1929-08-24 | Intermediate Casing Operation Performed |
| 1930-06-12 | Intermediate Casing Operation Performed |
| 1930-06-25 | Production Casing Operation Performed |
| 1930-09-28 | Finished Drilling |
| 1930-09-28 | Perforation Treatment Performed - Open-Hole Completion |
| 1930-09-28 | Well Mode changed to Drilled and Cased |
| 1930-09-30 | Well Began Production |
| 1930-09-30 | Well Fluid changed to Gas |
| 1930-09-30 | Well Mode changed to Flowing |
| 1933-11-21 | Perforation Treatment Performed - Open-Hole Completion |
| 1956-08-27 | Obtained License |
| 2019-03-01 | Well Fluid changed to Gas |
| 2019-03-01 | Well Mode changed to Suspended |
| 2019-03-08 | Well Log Performed |
| 2019-03-11 | Well Log Performed |
| 2019-03-12 | Perforation Treatment Performed - Cement Squeeze |
| 2019-03-13 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2019-03-13 | Perforation Treatment Performed - Jet Perforation |
| 2019-03-13 | Plug Back Performed |
| 2019-03-13 | Well Fluid changed to Gas |
| 2019-03-13 | Well Log Performed |
| 2019-03-13 | Well Mode changed to Abandoned Zone |
| 2019-03-14 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2019-03-14 | Perforation Treatment Performed - Remedial Casing |
| 2019-03-14 | Plug Back Performed |
| 2019-03-15 | Perforation Treatment Performed - Remedial Casing |
| 2019-03-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2019-03-18 | Perforation Treatment Performed - Jet Perforation |
| 2019-03-18 | Perforation Treatment Performed - Remedial Casing |
| 2019-03-18 | Plug Back Performed |
| 2019-03-18 | Well Log Performed |
| 2019-03-19 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2019-03-19 | Perforation Treatment Performed - Jet Perforation |
| 2019-03-19 | Plug Back Performed |
| 2019-03-19 | Well Log Performed |
| 2019-03-20 | Perforation Treatment Performed - Remedial Casing |
| 2019-03-21 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2019-03-21 | Perforation Treatment Performed - Jet Perforation |
| 2019-03-21 | Plug Back Performed |
| 2019-03-21 | Well Log Performed |
| 2019-03-22 | Perforation Treatment Performed - Remedial Casing |
| 2019-03-25 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2019-03-25 | Plug Back Performed |
| 2019-03-26 | Perforation Treatment Performed - Jet Perforation |
| 2019-03-26 | Well Log Performed |
| 2019-03-27 | Perforation Treatment Performed - Remedial Casing |
| 2019-03-28 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2019-03-28 | Perforation Treatment Performed - Jet Perforation |
| 2019-03-28 | Plug Back Performed |
| 2019-03-28 | Well Log Performed |
| 2019-03-29 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2019-03-29 | Perforation Treatment Performed - Remedial Casing |
| 2019-03-29 | Plug Back Performed |
| 2019-04-01 | Perforation Treatment Performed - Jet Perforation |
| 2019-04-01 | Perforation Treatment Performed - Remedial Casing |
| 2019-04-01 | Well Log Performed |
| 2019-04-02 | Well Log Performed |
| 2019-04-03 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2019-04-03 | Perforation Treatment Performed - Jet Perforation |
| 2019-04-03 | Perforation Treatment Performed - Remedial Casing |
| 2019-04-03 | Plug Back Performed |
| 2019-04-03 | Well Log Performed |
| 2019-04-04 | Perforation Treatment Performed - Jet Perforation |
| 2019-04-04 | Perforation Treatment Performed - Remedial Casing |
| 2019-04-04 | Well Log Performed |
| 2019-04-05 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2019-04-05 | Perforation Treatment Performed - Jet Perforation |
| 2019-04-05 | Perforation Treatment Performed - Remedial Casing |
| 2019-04-05 | Plug Back Performed |
| 2019-04-05 | Well Log Performed |
| 2019-04-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2019-04-08 | Perforation Treatment Performed - Jet Perforation |
| 2019-04-08 | Plug Back Performed |
| 2019-04-08 | Well Log Performed |
| 2019-04-10 | Perforation Treatment Performed - Remedial Casing |
| 2019-04-11 | Well Log Performed |
| 2019-05-24 | Well Log Performed |
| 2019-07-15 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2019-07-15 | Perforation Treatment Performed - Jet Perforation |
| 2019-07-15 | Plug Back Performed |
| 2019-07-15 | Well Log Performed |
| 2019-07-17 | Perforation Treatment Performed - Remedial Casing |
| 2019-07-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2019-07-18 | Plug Back Performed |
| 2019-07-18 | Well Log Performed |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1930-09-28 | Open Hole/Barefoot Completion | 1198.80 | 1281.70 | 0 |
| 2019-03-18 | Packing Device Capped w/Cement | 1063.00 | 1081.00 | 0 |
| 2019-03-18 | Perforation | 1014.00 | 1015.00 | 20 |
| 2019-03-18 | Remedial Casing Cementing | 1014.00 | 1015.00 | 0 |
| 2019-03-19 | Packing Device Capped w/Cement | 994.50 | 1010.00 | 0 |
| 2019-03-19 | Perforation | 862.00 | 863.00 | 13 |
| 2019-03-20 | Remedial Casing Cementing | 862.00 | 863.00 | 0 |
| 2019-03-21 | Packing Device Capped w/Cement | 843.50 | 859.00 | 0 |
| 2019-03-21 | Perforation | 789.00 | 790.00 | 13 |
| 2019-03-21 | Perforation | 710.00 | 711.00 | 13 |
| 2019-03-22 | Remedial Casing Cementing | 789.00 | 790.00 | 0 |
| 1933-11-21 | Open Hole/Barefoot Completion | 1198.80 | 1297.30 | 0 |
| 2019-03-22 | Remedial Casing Cementing | 710.00 | 711.00 | 0 |
| 2019-03-25 | Packing Device Capped w/Cement | 675.00 | 786.00 | 0 |
| 2019-03-26 | Perforation | 600.00 | 601.00 | 13 |
| 2019-03-26 | Perforation | 605.00 | 606.00 | 13 |
| 2019-03-27 | Remedial Casing Cementing | 605.00 | 606.00 | 0 |
| 2019-03-27 | Remedial Casing Cementing | 600.00 | 601.00 | 0 |
| 2019-03-28 | Packing Device Capped w/Cement | 580.00 | 597.00 | 0 |
| 2019-03-28 | Perforation | 430.00 | 431.00 | 13 |
| 2019-03-29 | Remedial Casing Cementing | 430.00 | 431.00 | 0 |
| 2019-03-29 | Packing Device Capped w/Cement | 420.00 | 428.00 | 0 |
| 2019-03-12 | Cement Squeeze | 1198.80 | 1297.30 | 0 |
| 2019-04-01 | Perforation | 424.00 | 425.00 | 13 |
| 2019-04-01 | Remedial Casing Cementing | 424.00 | 425.00 | 0 |
| 2019-04-03 | Packing Device Capped w/Cement | 414.00 | 422.00 | 0 |
| 2019-04-03 | Perforation | 372.00 | 373.00 | 13 |
| 2019-04-03 | Remedial Casing Cementing | 372.00 | 373.00 | 0 |
| 2019-04-04 | Perforation | 366.00 | 367.00 | 13 |
| 2019-04-04 | Remedial Casing Cementing | 366.00 | 367.00 | 0 |
| 2019-04-05 | Packing Device Capped w/Cement | 349.50 | 369.00 | 0 |
| 2019-04-05 | Perforation | 276.00 | 277.00 | 13 |
| 2019-04-05 | Remedial Casing Cementing | 276.00 | 277.00 | 0 |
| 2019-03-13 | Packing Device Capped w/Cement | 1169.20 | 1185.00 | 0 |
| 2019-04-08 | Packing Device Capped w/Cement | 263.00 | 271.00 | 0 |
| 2019-04-08 | Perforation | 260.00 | 261.00 | 13 |
| 2019-04-08 | Perforation | 256.50 | 257.50 | 39 |
| 2019-04-10 | Remedial Casing Cementing | 256.50 | 261.00 | 0 |
| 2019-07-15 | Packing Device Capped w/Cement | 245.00 | 253.00 | 0 |
| 2019-07-15 | Perforation | 220.00 | 221.00 | 39 |
| 2019-07-17 | Remedial Casing Cementing | 220.00 | 221.00 | 0 |
| 2019-07-18 | Packing Device Capped w/Cement | 201.00 | 210.00 | 0 |
| 2019-03-13 | Perforation | 1130.00 | 1131.00 | 13 |
| 2019-03-13 | Perforation | 1085.00 | 1086.00 | 13 |
| 2019-03-14 | Remedial Casing Cementing | 1130.00 | 1131.00 | 0 |
| 2019-03-14 | Packing Device Capped w/Cement | 1106.00 | 1126.00 | 0 |
| 2019-03-15 | Remedial Casing Cementing | 1085.00 | 1086.00 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1961 | 0 | 0.0 | 0.0 | 0.0 |
| 1984 | 7337 | 0.0 | 0.0 | 0.0 |
| 1985 | 5407 | 0.0 | 0.0 | 0.0 |
| 1986 | 7239 | 0.0 | 0.0 | 0.0 |
| 1987 | 8043 | 0.0 | 0.0 | 0.0 |
| 1988 | 7835 | 0.0 | 0.0 | 0.0 |
| 1989 | 8297 | 0.0 | 0.0 | 0.0 |
| 1990 | 8441 | 0.0 | 0.0 | 0.0 |
| 1991 | 8036 | 0.0 | 0.0 | 0.0 |
| 1992 | 7988 | 0.0 | 0.0 | 0.0 |
| 1993 | 8542 | 0.0 | 0.0 | 0.0 |
| 1994 | 8266 | 0.0 | 0.0 | 0.0 |
| 1995 | 7655 | 0.0 | 0.0 | 0.0 |
| 1996 | 8717 | 0.0 | 0.0 | 0.0 |
| 1997 | 8748 | 0.0 | 0.0 | 0.0 |
| 1998 | 8224 | 0.0 | 0.0 | 0.0 |
| 1999 | 8621 | 0.0 | 0.0 | 0.0 |
| 2000 | 8777 | 0.0 | 0.0 | 0.0 |
| 2001 | 7917 | 0.0 | 0.0 | 0.0 |
| 2002 | 8655 | 0.0 | 0.0 | 0.0 |
| 2003 | 8317 | 0.0 | 0.0 | 0.0 |
| 2004 | 7982 | 0.0 | 0.0 | 0.0 |
| 2005 | 7071 | 0.0 | 0.0 | 0.0 |
| 2006 | 8507 | 0.0 | 0.0 | 0.0 |
| 2007 | 4872 | 0.0 | 0.0 | 0.0 |
| 2008 | 4502 | 0.0 | 0.0 | 0.0 |
| 2009 | 7659 | 0.0 | 0.0 | 0.0 |
| 2010 | 7174 | 0.0 | 0.0 | 0.0 |
| 2011 | 7524 | 0.0 | 0.0 | 0.0 |
| 2012 | 8635 | 0.0 | 0.0 | 0.0 |
| 2013 | 7513 | 0.0 | 0.0 | 0.0 |
| 2014 | 7104 | 0.0 | 0.0 | 0.0 |
| 2015 | 8489 | 0.0 | 0.0 | 0.0 |
| 2016 | 7481 | 0.0 | 0.0 | 0.0 |
| 2017 | 7105 | 0.0 | 0.0 | 0.0 |
| 2018 | 8341 | 0.0 | 0.0 | 0.0 |
| 2019 | 1032 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2019-04-10 | No Incident Encountered | 0.00 | 0.00 |
| 2019-07-18 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]