If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0205030116040 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.67264,"lon":-114.27987,"icon":""}]} |
Location: 04/16-01-020-03W5/0 | |
Location Alias: 04/16-01-20-03 W5M | |
Location Alias 2: 04/16-01-020-03 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 020 | |
Meridian: 5 | |
Range: 03 | |
Section: 01 | |
County/Municipality: Turner Valley | |
Well Name: CPEC MCLEOD 4 TV 16-1-20-3 | |
Operator Name: Crescent Point Energy Corp. | |
License Number: 0012001 | |
License Date: 1956-08-28 | |
License Status: Abandoned | |
Spud Date: 1928-03-13 | |
Final Drill Date: 1932-11-18 | |
Well Total Depth: 2362.50 m | |
Surface Hole Latitude: 50.672640 | |
Surface Hole Longitude: -114.279870 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1928-08-25 | Production Casing Operation Performed |
1928-09-05 | Perforation Treatment Performed - Open-Hole Completion |
1929-09-14 | Perforation Treatment Performed - Open-Hole Completion |
1932-11-18 | Finished Drilling |
1932-11-18 | Perforation Treatment Performed - Open-Hole Completion |
1932-11-18 | Well Mode changed to Drilled and Cased |
1932-11-19 | Well Began Production |
1932-11-19 | Well Fluid changed to Gas |
1932-11-19 | Well Mode changed to Flowing |
1933-04-25 | Well Fluid changed to Gas |
1933-04-25 | Well Mode changed to Flowing |
1933-12-01 | Well Fluid changed to Gas |
1933-12-01 | Well Mode changed to Flowing |
1956-08-28 | Obtained License |
2018-03-20 | Well Log Performed |
2018-03-22 | Well Log Performed |
2018-03-28 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2018-03-28 | Perforation Treatment Performed - Cement Squeeze |
2018-03-28 | Plug Back Performed |
2018-04-04 | Perforation Treatment Performed - Jet Perforation |
2018-04-04 | Well Log Performed |
2018-04-05 | Perforation Treatment Performed - Remedial Casing |
2018-04-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2018-04-06 | Plug Back Performed |
2018-04-09 | Perforation Treatment Performed - Jet Perforation |
2018-04-09 | Perforation Treatment Performed - Remedial Casing |
2018-04-10 | Perforation Treatment Performed - Jet Perforation |
2018-04-10 | Perforation Treatment Performed - Remedial Casing |
2018-04-11 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2018-04-11 | Plug Back Performed |
2018-04-12 | Perforation Treatment Performed - Jet Perforation |
2018-04-12 | Perforation Treatment Performed - Remedial Casing |
2018-04-13 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2018-04-13 | Plug Back Performed |
2018-04-16 | Perforation Treatment Performed - Jet Perforation |
2018-04-16 | Perforation Treatment Performed - Remedial Casing |
2018-04-17 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2018-04-17 | Plug Back Performed |
2018-04-18 | Perforation Treatment Performed - Jet Perforation |
2018-04-19 | Perforation Treatment Performed - Jet Perforation |
2018-04-19 | Perforation Treatment Performed - Remedial Casing |
2018-04-20 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2018-04-20 | Plug Back Performed |
2018-04-23 | Perforation Treatment Performed - Jet Perforation |
2018-04-23 | Perforation Treatment Performed - Remedial Casing |
2018-04-24 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2018-04-24 | Plug Back Performed |
2018-04-24 | Well Fluid changed to Gas |
2018-04-24 | Well Mode changed to Abandoned Zone |
2019-03-04 | Well Abandoned |
2019-03-04 | Well Fluid changed to Gas |
2019-03-04 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1928-09-05 | Open Hole/Barefoot Completion | 1137.50 | 1152.40 | 0 |
2018-04-09 | Remedial Casing Cementing | 965.00 | 966.00 | 0 |
2018-04-10 | Perforation | 890.00 | 891.00 | 17 |
2018-04-10 | Remedial Casing Cementing | 890.00 | 891.00 | 0 |
2018-04-11 | Packing Device Capped w/Cement | 822.70 | 896.00 | 0 |
2018-04-12 | Perforation | 712.00 | 713.00 | 17 |
2018-04-12 | Remedial Casing Cementing | 712.00 | 713.00 | 0 |
2018-04-13 | Packing Device Capped w/Cement | 697.00 | 708.00 | 0 |
2018-04-16 | Perforation | 635.00 | 636.00 | 17 |
2018-04-16 | Perforation | 599.00 | 600.00 | 17 |
2018-04-16 | Remedial Casing Cementing | 635.00 | 636.00 | 0 |
1929-09-14 | Open Hole/Barefoot Completion | 1137.50 | 1594.10 | 0 |
2018-04-16 | Remedial Casing Cementing | 599.00 | 600.00 | 0 |
2018-04-17 | Packing Device Capped w/Cement | 580.00 | 605.00 | 0 |
2018-04-18 | Perforation | 430.00 | 431.00 | 17 |
2018-04-19 | Perforation | 315.00 | 316.00 | 17 |
2018-04-19 | Remedial Casing Cementing | 315.00 | 316.00 | 0 |
2018-04-20 | Packing Device Capped w/Cement | 285.30 | 320.00 | 0 |
2018-04-23 | Perforation | 140.00 | 141.00 | 17 |
2018-04-23 | Remedial Casing Cementing | 140.00 | 141.00 | 0 |
2018-04-24 | Packing Device Capped w/Cement | 125.50 | 135.00 | 0 |
1932-11-18 | Open Hole/Barefoot Completion | 1137.50 | 2362.50 | 0 |
2018-03-28 | Cement Squeeze | 1137.50 | 2362.50 | 0 |
2018-03-28 | Packing Device Capped w/Cement | 1052.20 | 1095.00 | 0 |
2018-04-04 | Perforation | 1030.50 | 1032.50 | 20 |
2018-04-05 | Remedial Casing Cementing | 1030.50 | 1032.50 | 0 |
2018-04-06 | Packing Device Capped w/Cement | 987.50 | 1025.00 | 0 |
2018-04-09 | Perforation | 965.00 | 966.00 | 17 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1984 | 7955 | 0.0 | 0.0 | 0.0 |
1985 | 4687 | 0.0 | 0.0 | 0.0 |
1986 | 6320 | 0.0 | 0.0 | 0.0 |
1987 | 8198 | 0.0 | 0.0 | 0.0 |
1988 | 8293 | 0.0 | 0.0 | 0.0 |
1989 | 8293 | 0.0 | 0.0 | 0.0 |
1990 | 8332 | 0.0 | 0.0 | 0.0 |
1991 | 7954 | 0.0 | 0.0 | 0.0 |
1992 | 7846 | 0.0 | 0.0 | 0.0 |
1993 | 8228 | 0.0 | 0.0 | 0.0 |
1994 | 8263 | 0.0 | 0.0 | 0.0 |
1995 | 8495 | 0.0 | 0.0 | 0.0 |
1996 | 8645 | 0.0 | 0.0 | 0.0 |
1997 | 8748 | 0.0 | 0.0 | 0.0 |
1998 | 8224 | 0.0 | 0.0 | 0.0 |
1999 | 8617 | 0.0 | 0.0 | 0.0 |
2000 | 8777 | 0.0 | 0.0 | 0.0 |
2001 | 5971 | 0.0 | 0.0 | 0.0 |
2002 | 8420 | 0.0 | 0.0 | 0.0 |
2003 | 8533 | 0.0 | 0.0 | 0.0 |
2004 | 7982 | 0.0 | 0.0 | 0.0 |
2005 | 7071 | 0.0 | 0.0 | 0.0 |
2006 | 8507 | 0.0 | 0.0 | 0.0 |
2007 | 4977 | 0.0 | 0.0 | 0.0 |
2008 | 4934 | 0.0 | 0.0 | 0.0 |
2009 | 7437 | 0.0 | 0.0 | 0.0 |
2010 | 7294 | 0.0 | 0.0 | 0.0 |
2011 | 7527 | 0.0 | 0.0 | 0.0 |
2012 | 8705 | 0.0 | 0.0 | 0.0 |
2013 | 7526 | 0.0 | 0.0 | 0.0 |
2014 | 7237 | 0.0 | 0.0 | 0.0 |
2015 | 8529 | 0.0 | 0.0 | 0.0 |
2016 | 8358 | 0.0 | 0.0 | 0.0 |
2017 | 7812 | 0.0 | 0.0 | 0.0 |
2018 | 1640 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2018-04-24 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]