X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0144191315030

Well Details

Well ID: 0144191315030
Loading map...
Location: 03/15-13-014-19W4/0
Location Alias: 03/15-13-14-19 W4M
Location Alias 2: 03/15-13-014-19 W4/00
Country: Canada
Province: Alberta
Township: 014
Meridian: 4
Range: 19
Section: 13
County/Municipality: Municipal District of Taber
Well Name: ZARGON RETLAW 15-13-14-19
Operator Name: Zargon Oil & Gas Ltd.
License Number: 0174236
License Date: 1994-12-15
License Status: Suspension
Spud Date: 1995-01-30
Final Drill Date: 1995-02-03
Well Total Depth: 1191.00 m
Surface Hole Latitude: 50.176730
Surface Hole Longitude: -112.468619

For data sources see[1][2]

Well History

Date Event
1994-12-15 Obtained License
1995-01-31 Surface Casing Operation Performed
1995-02-03 Finished Drilling
1995-02-03 Well Log Performed
1995-02-03 Well Mode changed to Drilled and Cased
1995-02-04 Production Casing Operation Performed
1995-02-04 Rig Released
1995-02-06 Well Log Performed
1995-02-07 Perforation Treatment Performed - Jet Perforation
1995-02-08 Well Began Production
1995-02-08 Well Fluid changed to Crude Oil
1995-02-08 Well Mode changed to Flowing
1996-06-09 Well Fluid changed to Crude Oil
1996-06-09 Well Mode changed to Pumping
1996-09-30 Well Fluid changed to Crude Oil
1996-09-30 Well Mode changed to Suspended
1999-10-02 Perforation Treatment Performed - Jet Perforation
1999-10-02 Well Fluid changed to Crude Oil
1999-10-02 Well Log Performed
1999-10-02 Well Mode changed to Pumping
1999-10-03 Well Fluid changed to Crude Oil
1999-10-03 Well Mode changed to Suspended
1999-10-04 Perforation Treatment Performed - Jet Perforation
1999-10-04 Well Log Performed
1999-10-05 Perforation Treatment Performed - Jet Perforation
1999-10-05 Well Log Performed
1999-10-08 Perforation Treatment Performed - Fractured
1999-10-13 Well Log Performed
2009-04-21 Perforation Treatment Performed - Cement Squeeze
2009-04-21 Plug Back Performed
2009-05-29 Well Fluid changed to Crude Oil
2009-05-29 Well Mode changed to Pumping
2012-11-01 Well Fluid changed to Crude Oil
2012-11-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-02-07 Perforation 1123.00 1126.50 18
1995-02-07 Perforation 1128.50 1134.50 18
1999-10-02 Perforation 903.00 908.00 17
1999-10-04 Perforation 880.00 886.00 17
1999-10-05 Perforation 868.00 872.00 17
1999-10-08 Fracture 868.00 886.00 0
2009-04-21 Cement Squeeze 868.00 872.00 0
2009-04-21 Cement Squeeze 880.00 886.00 0
2009-04-21 Cement Squeeze 903.00 908.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 7002 0.0 0.0 0.0
1996 5047 0.0 0.0 0.0
2009 5039 0.0 0.0 0.0
2010 4307 0.0 0.0 0.0
2011 310 0.0 0.0 0.0

For data sources see[5]

References