X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404131106040

Well Details

Well ID: 0404131106040
Loading map...
Location: 04/06-11-040-13W4/0
Location Alias: 04/06-11-40-13 W4M
Location Alias 2: 04/06-11-040-13 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 13
Section: 11
County/Municipality: Flagstaff County
Well Name: PRED A-1 HALKIRKE 6-11-40-13
Operator Name: Canadian Coyote Energy Ltd.
License Number: 0147347
License Date: 1991-01-11
License Status: Abandoned
Spud Date: 1991-01-23
Final Drill Date: 1991-01-28
Well Total Depth: 1062.00 m
Surface Hole Latitude: 52.424725
Surface Hole Longitude: -111.769275

For data sources see[1][2]

Well History

Date Event
1991-01-11 Obtained License
1991-01-24 Surface Casing Operation Performed
1991-01-26 Direction Drilling Operation Performed - Deviate
1991-01-28 Finished Drilling
1991-01-28 Well Log Performed
1991-01-28 Well Mode changed to Drilled and Cased
1991-01-29 Production Casing Operation Performed
1991-01-29 Rig Released
1991-01-29 Well Log Performed
1991-02-01 Well Log Performed
1991-03-15 Well Log Performed
1991-05-29 Well Log Performed
1991-05-30 Perforation Treatment Performed - Jet Perforation
1991-06-01 Well Began Injection
1991-06-01 Well Fluid changed to Water
1991-06-01 Well Type changed to Disposal
2009-12-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-12-01 Plug Back Performed
2009-12-01 Well Fluid changed to Water
2009-12-01 Well Mode changed to Abandoned Zone
2009-12-01 Well Type changed to Disposal
2017-11-16 Well Abandoned
2017-11-16 Well Fluid changed to Water
2017-11-16 Well Mode changed to Abandoned
2017-11-16 Well Type changed to Disposal

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1991-01-26 655.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1991-05-30 Perforation 1035.00 1045.00 13
1991-05-30 Perforation 1028.00 1032.00 13
2009-12-01 Packing Device Capped w/Cement 1009.50 1017.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0

For data sources see[6]

References