X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404131506030

Well Details

Well ID: 0404131506030
Loading map...
Location: 03/06-15-040-13W4/0
Location Alias: 03/06-15-40-13 W4M
Location Alias 2: 03/06-15-040-13 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 13
Section: 15
County/Municipality: Flagstaff County
Well Name: PRED B-1 HALKIRKE 6-15-40-13
Operator Name: Canadian Coyote Energy Ltd.
License Number: 0134937
License Date: 1988-07-14
License Status: Abandoned
Spud Date: 1988-07-30
Final Drill Date: 1988-08-02
Well Total Depth: 1040.00 m
Surface Hole Latitude: 52.438507
Surface Hole Longitude: -111.796071

For data sources see[1][2]

Well History

Date Event
1988-07-14 Obtained License
1988-07-31 Surface Casing Operation Performed
1988-08-01 Direction Drilling Operation Performed - Deviate
1988-08-02 Finished Drilling
1988-08-02 Well Log Performed
1988-08-02 Well Mode changed to Drilled and Cased
1988-08-03 Production Casing Operation Performed
1988-08-03 Rig Released
1988-08-09 Well Log Performed
1988-09-16 Perforation Treatment Performed - Jet Perforation
1988-09-16 Well Log Performed
1988-10-20 Well Began Production
1988-10-20 Well Fluid changed to Crude Oil
1988-10-20 Well Mode changed to Pumping
1998-03-01 Well Fluid changed to Crude Oil
1998-03-01 Well Mode changed to Suspended
2003-07-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-07-16 Plug Back Performed
2003-07-16 Well Fluid changed to Crude Oil
2003-07-16 Well Mode changed to Abandoned Zone
2003-07-17 Well Log Performed
2003-10-01 Perforation Treatment Performed - Jet Perforation
2003-10-01 Perforation Treatment Performed - Remedial Casing
2003-10-01 Well Log Performed
2003-10-20 Well Abandoned
2003-10-20 Well Fluid changed to Crude Oil
2003-10-20 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1988-08-01 489.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-09-16 Perforation 1011.00 1012.00 13
2003-07-16 Packing Device Capped w/Cement 997.00 1005.00 0
2003-10-01 Perforation 225.00 225.30 36
2003-10-01 Remedial Casing Cementing 225.00 225.30 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 1734 0.0 0.0 0.0
1989 8643 0.0 0.0 0.0
1990 8729 0.0 0.0 0.0
1991 8319 0.0 0.0 0.0
1992 8182 0.0 0.0 0.0
1993 7664 0.0 0.0 0.0
1994 7666 0.0 0.0 0.0
1995 8352 0.0 0.0 0.0
1996 8597 0.0 0.0 0.0
1997 6968 0.0 0.0 0.0

For data sources see[6]

References