X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485131312000

Well Details

Well ID: 0485131312000
Loading map...
Location: 00/12-13-048-13W5/0
Location Alias: 00/12-13-48-13 W5M
Location Alias 2: 00/12-13-048-13 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 13
Section: 13
County/Municipality: Yellowhead County
Well Name: TIDEWATER BRAZR 12-13-48-13
Operator Name: Tidewater Midstream and Infrastructure Ltd.
License Number: 0129429
License Date: 1987-10-20
License Status: Suspension
Spud Date: 1987-10-22
Final Drill Date: 1988-01-27
Well Total Depth: 3341.00 m
Surface Hole Latitude: 53.141610
Surface Hole Longitude: -115.781868

For data sources see[1][2]

Well History

Date Event
1987-10-20 Obtained License
1987-10-26 Surface Casing Operation Performed
1987-11-04 Direction Drilling Operation Performed - Deviate
1988-01-04 Well Log Performed
1988-01-10 Intermediate Casing Operation Performed
1988-01-10 Well Log Performed
1988-01-15 Well Log Performed
1988-01-27 Finished Drilling
1988-01-28 Well Log Performed
1988-02-02 Rig Released
1988-02-02 Well Mode changed to Drilled and Cased
1988-03-10 Well Log Performed
1988-06-02 Perforation Treatment Performed - Jet Perforation
1988-06-02 Well Log Performed
1988-06-04 Perforation Treatment Performed - Jet Perforation
1988-06-04 Well Log Performed
1988-06-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-06-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-06-16 Perforation Treatment Performed - Remedial Casing
1988-06-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-06-23 Well Log Performed
1988-06-26 Perforation Treatment Performed - Remedial Casing
1988-06-26 Well Log Performed
1988-07-05 Well Log Performed
1988-07-10 Perforation Treatment Performed - Jet Perforation
1988-07-20 Well Began Production
1988-07-20 Well Fluid changed to Crude Oil
1988-07-20 Well Mode changed to Flowing
1988-07-24 Well Fluid changed to Crude Oil
1988-07-24 Well Mode changed to Suspended
1988-11-10 Well Fluid changed to Crude Oil
1988-11-10 Well Mode changed to Flowing
1996-12-16 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-10-26 Well Log Performed
2003-10-28 Well Log Performed
2003-11-04 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-09-23 Well Log Performed
2019-03-01 Well Fluid changed to Crude Oil
2019-03-01 Well Mode changed to Suspended
2020-01-23 Well Log Performed
2020-01-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2020-01-25 Perforation Treatment Performed - Cement Squeeze
2020-01-25 Plug Back Performed
2020-01-25 Well Fluid changed to Crude Oil
2020-01-25 Well Mode changed to Abandoned Zone
2020-01-26 Well Log Performed
2020-01-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2020-01-27 Perforation Treatment Performed - Jet Perforation
2020-01-27 Well Log Performed
2020-01-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2020-01-28 Perforation Treatment Performed - Remedial Casing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1987-11-04 1600.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-06-02 Perforation 1750.00 1751.00 13
2003-11-04 Acid Treatment 3226.00 3229.00 0
2020-01-25 Cement Squeeze 3226.00 3229.00 0
2020-01-25 Packing Device Capped w/Cement 2954.40 3006.00 0
2020-01-27 Packing Device Capped w/Cement 2944.00 2953.00 0
2020-01-27 Packing Device Capped w/Cement 1739.50 1748.00 0
2020-01-27 Packing Device Capped w/Cement 1513.50 1522.00 0
2020-01-27 Perforation 599.00 601.00 17
2020-01-28 Remedial Casing Cementing 599.00 601.00 0
2020-01-28 Packing Device Capped w/Cement 563.00 593.00 0
1988-06-04 Perforation 1525.00 1526.00 13
1988-06-10 Acid Treatment 1525.00 1526.00 0
1988-06-15 Acid Treatment 1750.00 1751.00 0
1988-06-16 Remedial Casing Cementing 1525.00 1526.00 0
1988-06-21 Acid Treatment 1750.00 1751.00 0
1988-06-26 Remedial Casing Cementing 1750.00 1751.00 0
1988-07-10 Perforation 3226.00 3229.00 13
1996-12-16 Acid Treatment 3226.00 3229.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 932 0.0 0.0 0.0
1989 1342 0.0 0.0 0.0
1990 2417 0.0 0.0 0.0
1991 7750 0.0 0.0 0.0
1992 8243 0.0 0.0 0.0
1993 8302 0.0 0.0 0.0
1994 8256 0.0 0.0 0.0
1995 8640 0.0 0.0 0.0
1996 8685 0.0 0.0 0.0
1997 6766 0.0 0.0 0.0
1998 8428 0.0 0.0 0.0
1999 8375 0.0 0.0 0.0
2000 7656 0.0 0.0 0.0
2001 6841 0.0 0.0 0.0
2002 8581 0.0 0.0 0.0
2003 7452 0.0 0.0 0.0
2004 7940 0.0 0.0 0.0
2005 7478 0.0 0.0 0.0
2006 8205 0.0 0.0 0.0
2007 7268 0.0 0.0 0.0
2008 6436 0.0 0.0 0.0
2009 4936 0.0 0.0 0.0
2010 4597 0.0 0.0 0.0
2011 4681 0.0 0.0 0.0
2012 29 0.0 0.0 0.0
2013 6827 0.0 0.0 0.0
2014 5699 0.0 0.0 0.0
2015 6625 0.0 0.0 0.0
2016 7488 0.0 0.0 0.0
2017 2881 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2020-01-28 No Incident Encountered 0.00 0.00

For data sources see[7]

References