X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0494010516000

Well Details

Well ID: 0494010516000
Loading map...
Location: 00/16-05-049-01W4/0
Location Alias: 00/16-05-49-01 W4M
Location Alias 2: 00/16-05-049-01 W4/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 4
Range: 01
Section: 05
County/Municipality: County of Vermilion River
Well Name: CREW LLOYD 16-5-49-1
Operator Name: Crew Energy Inc.
License Number: 0270311
License Date: 2002-05-27
License Status: Suspension
Spud Date: 2002-06-10
Final Drill Date: 2002-06-12
Well Total Depth: 670.00 m
Surface Hole Latitude: 53.204395
Surface Hole Longitude: -110.104411

For data sources see[1][2]

Well History

Date Event
2002-05-27 Obtained License
2002-06-11 Surface Casing Operation Performed
2002-06-12 Finished Drilling
2002-06-12 Well Log Performed
2002-06-13 Drill Stem Test Performed
2002-06-14 Production Casing Operation Performed
2002-06-14 Rig Released
2002-06-14 Well Mode changed to Drilled and Cased
2002-06-25 Perforation Treatment Performed - Jet Perforation
2002-06-25 Well Began Production
2002-06-25 Well Fluid changed to Crude Oil
2002-06-25 Well Mode changed to Pumping
2003-08-01 Well Fluid changed to Crude Oil
2003-08-01 Well Mode changed to Suspended
2003-10-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-10-02 Well Log Performed
2003-10-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-10-03 Perforation Treatment Performed - Jet Perforation
2003-10-03 Plug Back Performed
2003-10-03 Well Fluid changed to Crude Oil
2003-10-03 Well Mode changed to Abandoned Zone
2006-03-03 Perforation Treatment Performed - Bridge Plug No Cement Required
2006-03-03 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-06-25 Perforation 642.00 644.00 26
2002-06-25 Perforation 646.00 649.00 26
2003-10-02 Packing Device Capped w/Cement 629.00 637.00 0
2003-10-03 Packing Device Capped w/Cement 619.00 627.00 0
2003-10-03 Perforation 607.00 608.00 17
2006-03-03 Bridge Plug, No Cement 602.00 605.00 0
2006-03-03 Perforation 594.50 598.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2002 432 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-10-19 No Incident Encountered 0.00 0.00

For data sources see[6]

References