If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0494013604B00 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.26429,"lon":-110.028372,"icon":""}]} |
Location: B0/04-36-049-01W4/0 | |
Location Alias: B0/04-36-49-01 W4M | |
Location Alias 2: B0/04-36-049-01 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 049 | |
Meridian: 4 | |
Range: 01 | |
Section: 36 | |
County/Municipality: Lloydminster | |
Well Name: LLOYDMINSTER ROYALTIES #1 | |
Operator Name: Franco Public Service Ltd. | |
License Number: A0000210 | |
License Date: 1938-10-28 | |
License Status: RecExempt | |
Spud Date: 1938-11-10 | |
Final Drill Date: 1939-01-09 | |
Well Total Depth: 588.00 m | |
Surface Hole Latitude: 53.264290 | |
Surface Hole Longitude: -110.028372 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1938-10-28 | Obtained License |
1939-01-09 | Finished Drilling |
1939-01-09 | Well Mode changed to Drilled and Cased |
1939-01-25 | Well Began Production |
1939-01-25 | Well Fluid changed to Crude Oil |
1939-01-25 | Well Mode changed to Flowing |
1939-06-15 | Liner Casing Operation Performed |
1939-06-15 | Perforation Treatment Performed - Open-Hole Completion |
1940-07-16 | Well Fluid changed to Crude Oil |
1940-07-16 | Well Mode changed to Suspended |
1949-06-08 | Well Abandoned |
1949-06-08 | Well Fluid changed to Crude Oil |
1949-06-08 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1939-06-15 | Open Hole/Barefoot Completion | 585.50 | 586.70 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]