If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0494211111002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.217674,"lon":-112.965401,"icon":""}]} |
Location: 00/11-11-049-21W4/2 | |
Location Alias: 00/11-11-49-21 W4M | |
Location Alias 2: 00/11-11-049-21 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 049 | |
Meridian: 4 | |
Range: 21 | |
Section: 11 | |
County/Municipality: Camrose County | |
Well Name: CABRE ET AL JOARCAM 11-11-49-21 | |
Operator Name: Enerplus Corporation | |
License Number: 0087068 | |
License Date: 1980-11-17 | |
License Status: Issued | |
Spud Date: 1980-11-19 | |
Final Drill Date: 1980-11-26 | |
Well Total Depth: 1263.00 m | |
Surface Hole Latitude: 53.217674 | |
Surface Hole Longitude: -112.965401 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1980-11-17 | Obtained License |
1980-11-26 | Finished Drilling |
1980-11-26 | Well Mode changed to Drilled and Cased |
1980-11-28 | Drill Stem Test Performed |
1980-11-29 | Drill Stem Test Performed |
1980-11-30 | Drill Stem Test Performed |
1980-12-02 | Production Casing Operation Performed |
1981-01-23 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1981-01-23 | Perforation Treatment Performed - Jet Perforation |
1998-11-19 | Well Log Performed |
1998-11-20 | Well Log Performed |
1998-11-21 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1998-11-21 | Plug Back Performed |
1998-11-23 | Well Log Performed |
1998-11-24 | Perforation Treatment Performed - Jet Perforation |
1998-12-20 | Well Began Production |
1998-12-20 | Well Fluid changed to Gas |
1998-12-20 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1981-01-23 | Perforation | 990.20 | 992.00 | 10 |
1981-01-23 | Perforation | 993.00 | 994.50 | 10 |
1981-01-23 | Acid Treatment | 990.20 | 994.50 | 0 |
1998-11-21 | Packing Device Capped w/Cement | 932.00 | 940.00 | 0 |
1998-11-24 | Perforation | 241.00 | 246.00 | 20 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1998 | 302 | 0.0 | 0.0 | 0.0 |
1999 | 8201 | 0.0 | 0.0 | 0.0 |
2000 | 6433 | 0.0 | 0.0 | 0.0 |
2001 | 8424 | 0.0 | 0.0 | 0.0 |
2002 | 8423 | 0.0 | 0.0 | 0.0 |
2003 | 8354 | 0.0 | 0.0 | 0.0 |
2004 | 8782 | 0.0 | 0.0 | 0.0 |
2005 | 8759 | 0.0 | 0.0 | 0.0 |
2006 | 8757 | 0.0 | 0.0 | 0.0 |
2007 | 8759 | 0.0 | 0.0 | 0.0 |
2008 | 8579 | 0.0 | 0.0 | 0.0 |
2009 | 8757 | 0.0 | 0.0 | 0.0 |
2010 | 8379 | 0.0 | 0.0 | 0.0 |
2011 | 8305 | 0.0 | 0.0 | 0.0 |
2012 | 7597 | 0.0 | 0.0 | 0.0 |
2013 | 7249 | 0.0 | 0.0 | 0.0 |
2014 | 7557 | 0.0 | 0.0 | 0.0 |
2015 | 8687 | 0.0 | 0.0 | 0.0 |
2016 | 8753 | 0.0 | 0.0 | 0.0 |
2017 | 8424 | 0.0 | 0.0 | 0.0 |
2018 | 8294 | 0.0 | 0.0 | 0.0 |
2019 | 8677 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]