X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0494211811002

Well Details

Well ID: 0494211811002
Loading map...
Location: 00/11-18-049-21W4/2
Location Alias: 00/11-18-49-21 W4M
Location Alias 2: 00/11-18-049-21 W4/02
Country: Canada
Province: Alberta
Township: 049
Meridian: 4
Range: 21
Section: 18
County/Municipality: Camrose County
Well Name: ENERMARK JOAM 11-18-49-21
Operator Name: Enerplus Corporation
License Number: 0126192
License Date: 1987-03-19
License Status: Abandoned
Spud Date: 1987-03-24
Final Drill Date: 1987-03-28
Well Total Depth: 1030.00 m
Surface Hole Latitude: 53.230200
Surface Hole Longitude: -113.063924

For data sources see[1][2]

Well History

Date Event
1987-03-19 Obtained License
1987-03-24 Surface Casing Operation Performed
1987-03-27 Drill Stem Test Performed
1987-03-28 Finished Drilling
1987-03-28 Well Log Performed
1987-03-28 Well Mode changed to Drilled and Cased
1987-03-29 Production Casing Operation Performed
1987-03-29 Rig Released
1987-04-01 Well Log Performed
1987-04-02 Perforation Treatment Performed - Jet Perforation
1987-04-02 Well Log Performed
1992-06-17 Perforation Treatment Performed - Jet Perforation
1992-06-17 Well Log Performed
1993-02-25 Perforation Treatment Performed - Jet Perforation
1993-02-25 Well Log Performed
1993-07-01 Well Began Production
1993-07-01 Well Fluid changed to Gas
1993-07-01 Well Mode changed to Flowing
1994-02-28 Perforation Treatment Performed - Cement Squeeze
1994-02-28 Plug Back Performed
1994-03-04 Perforation Treatment Performed - Fractured
2000-05-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-05-16 Plug Back Performed
2000-05-16 Well Fluid changed to Gas
2000-05-16 Well Log Performed
2000-05-16 Well Mode changed to Abandoned Zone
2000-05-17 Perforation Treatment Performed - Jet Perforation
2010-10-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-10-27 Plug Back Performed
2010-10-31 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1987-04-02 Perforation 993.00 994.00 13
1992-06-17 Perforation 989.00 996.00 13
1993-02-25 Perforation 1002.40 1006.00 14
1994-02-28 Cement Squeeze 989.00 996.00 0
1994-03-04 Fracture 1002.40 1006.00 0
2000-05-16 Packing Device Capped w/Cement 979.50 987.50 0
2000-05-17 Perforation 245.00 247.00 14
2000-05-17 Perforation 208.50 210.00 14
2010-10-27 Packing Device Capped w/Cement 194.80 203.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 4172 0.0 0.0 0.0
1994 3813 0.0 0.0 0.0
1998 744 0.0 0.0 0.0

For data sources see[5]

References