X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0405052106000

Well Details

Well ID: 0405052106000
Loading map...
Location: 00/06-21-040-05W5/0
Location Alias: 00/06-21-40-05 W5M
Location Alias 2: 00/06-21-040-05 W5/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 5
Range: 05
Section: 21
County/Municipality: Clearwater County
Well Name: PSEC WILLGR 6-21-40-5
Operator Name: Prairie Storm Energy Corp.
License Number: 0013221
License Date: 1957-03-19
License Status: Suspension
Spud Date: 1957-03-22
Final Drill Date: 1957-05-04
Well Total Depth: 2400.30 m
Surface Hole Latitude: 52.455737
Surface Hole Longitude: -114.664263

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1957-03-19 Obtained License
1957-03-23 Lost Circulation Occurred
1957-04-10 Drill Stem Test Performed
1957-04-12 Drill Stem Test Performed
1957-04-18 Drill Stem Test Performed
1957-05-04 Finished Drilling
1957-05-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1957-05-04 Perforation Treatment Performed - Fractured
1957-05-04 Perforation Treatment Performed - Jet Perforation
1957-05-04 Production Casing Operation Performed
1957-05-04 Well Mode changed to Drilled and Cased
1957-05-06 Drill Stem Test Performed
1957-06-08 Well Began Production
1957-06-08 Well Fluid changed to Crude Oil
1957-06-08 Well Mode changed to Flowing
1970-12-31 Perforation Treatment Performed - Fractured
1971-12-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1971-12-21 Perforation Treatment Performed - Jet Perforation
1971-12-23 Perforation Treatment Performed - Fractured
1972-01-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-01-30 Well Fluid changed to Crude Oil
1972-01-30 Well Mode changed to Flowing
1972-03-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1972-03-07 Well Fluid changed to Crude Oil
1972-03-07 Well Mode changed to Flowing
1973-10-13 Well Fluid changed to Crude Oil
1973-10-13 Well Mode changed to Pumping
1975-06-20 Well Fluid changed to Crude Oil
1975-06-20 Well Mode changed to Flowing
1975-11-17 Perforation Treatment Performed - Chemical Squeeze
1976-03-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-12-09 Well Fluid changed to Crude Oil
1979-12-09 Well Mode changed to Pumping
1980-08-18 Perforation Treatment Performed - Fractured
1981-06-09 Perforation Treatment Performed - Jet Perforation
1981-06-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-06-11 Perforation Treatment Performed - Fractured
1984-01-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-11-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-08-24 Perforation Treatment Performed - Fractured
1994-09-01 Well Fluid changed to Crude Oil
1994-09-01 Well Mode changed to Suspended
1995-05-26 Perforation Treatment Performed - Jet Perforation
1995-06-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-06-20 Perforation Treatment Performed - Jet Perforation
1995-06-20 Plug Back Performed
1995-06-20 Well Fluid changed to Crude Oil
1995-06-20 Well Log Performed
1995-06-20 Well Mode changed to Abandoned Zone
1995-06-22 Perforation Treatment Performed - Jet Perforation
1995-06-22 Well Log Performed
1995-06-24 Well Log Performed
2011-12-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-12-08 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1957-05-04 Perforation 1846.80 1848.30 13
1975-11-17 Chemical Squeeze 1846.80 1848.30 0
1976-03-05 Acid Treatment 1846.80 1848.30 0
1980-08-18 Fracture 1846.80 1848.30 0
1981-06-09 Perforation 1846.20 1849.20 6
1981-06-09 Perforation 1849.80 1851.70 6
1981-06-10 Acid Treatment 1846.20 1851.70 0
1981-06-11 Fracture 1846.20 1851.70 0
1984-01-26 Acid Treatment 1846.20 1851.70 0
1988-11-19 Acid Treatment 1846.20 1851.70 0
1990-08-24 Fracture 1846.20 1851.70 0
1957-05-04 Acid Treatment 1846.80 1848.30 0
1995-05-26 Perforation 2151.10 2156.00 13
1995-06-20 Perforation 1498.00 1499.00 13
1995-06-20 Perforation 1412.00 1413.00 13
1995-06-20 Packing Device Capped w/Cement 1807.00 1815.00 0
1995-06-20 Packing Device Capped w/Cement 2038.80 2046.80 0
1995-06-22 Perforation 1460.50 1464.50 7
2011-12-08 Packing Device Capped w/Cement 1396.00 1404.00 0
1957-05-04 Fracture 1846.80 1848.30 0
1970-12-31 Fracture 1846.80 1848.30 0
1971-12-21 Perforation 2341.50 2347.60 7
1971-12-21 Acid Treatment 2341.50 2347.60 0
1971-12-23 Fracture 2341.50 2347.60 0
1972-01-30 Acid Treatment 2341.50 2347.60 0
1972-03-07 Packing Device Capped w/Cement 2324.10 2331.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 3261 0.0 0.0 0.0
1968 5834 0.0 0.0 0.0
1969 8064 0.0 0.0 0.0
1970 7344 0.0 0.0 0.0
1971 6720 0.0 0.0 0.0
1972 8043 0.0 0.0 0.0
1973 7037 0.0 0.0 0.0
1974 1954 0.0 0.0 0.0
1975 3604 0.0 0.0 0.0
1976 7969 0.0 0.0 0.0
1977 1121 0.0 0.0 0.0
1978 142 0.0 0.0 0.0
1980 2111 0.0 0.0 0.0
1981 4584 0.0 0.0 0.0
1982 8464 0.0 0.0 0.0
1983 8279 0.0 0.0 0.0
1984 8003 0.0 0.0 0.0
1985 7919 0.0 0.0 0.0
1986 7602 0.0 0.0 0.0
1987 8730 0.0 0.0 0.0
1988 6833 0.0 0.0 0.0
1989 8759 0.0 0.0 0.0
1990 6647 0.0 0.0 0.0
1991 8535 0.0 0.0 0.0
1992 8426 0.0 0.0 0.0
1993 6160 0.0 0.0 0.0
1994 3871 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1957-03-23 Lost Circulation 0.10 63.70

For data sources see[6]

References